PREPARING ROW
|
AC
|
46.320
|
$10,000.000
|
$36,253.680
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
167,672.000
|
$16.000
|
$3.560
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
1.250
|
$250.000
|
$3,564.780
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
197,129.000
|
$10.000
|
$13.220
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
AC
|
10.000
|
$1,000.000
|
$1,501.630
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
AC
|
10.000
|
$350.000
|
$1,501.630
|
|
|
STRAW/HAY MLCH SEED(PERM)(URBAN)(SANDY)
|
AC
|
10.000
|
$1,350.000
|
$5,485.640
|
|
|
VEGETATIVE WATERING
|
MG
|
1,255.000
|
$15.000
|
$296.420
|
|
|
IRRIGATION SYSTEM LOCATION A
|
LS
|
1.000
|
$55,000.000
|
$170,984.780
|
|
|
IRRIGATION SYSTEM LOCATION B
|
LS
|
1.000
|
$55,000.000
|
$170,984.780
|
|
|
PLANT MATERIAL (1-GAL)
|
EA
|
40,436.000
|
$15.000
|
$13.090
|
|
|
PLANT MATERIAL (3-GAL)
|
EA
|
684.000
|
$25.000
|
$67.040
|
|
|
PLANT MATERIAL (5-GAL)
|
EA
|
202.000
|
$35.000
|
$70.150
|
|
|
PLANT MATERIAL (15-GAL)
|
EA
|
287.000
|
$200.000
|
$94.580
|
|
|
PLANT MATERIAL (30 GAL) (TREE)
|
EA
|
68.000
|
$350.000
|
$1,450.390
|
|
|
PLANT MATERIAL (45 GAL) (TREE)
|
EA
|
34.000
|
$500.000
|
$1,911.440
|
|
|
LANDSCAPE EDGE (TYPE I)
|
LF
|
2,206.000
|
$20.000
|
$15.590
|
|
|
LANDSCAPE EDGE (TYPE II)
|
LF
|
817.000
|
$25.000
|
$41.560
|
|
|
LANDSCAPE EDGE (TYPE III)
|
LF
|
1,506.000
|
$10.000
|
$16.620
|
|
|
CEMENT
|
TON
|
415.000
|
$190.000
|
$332.490
|
|
|
CEMENT TREAT (SUBGRADE)(6")
|
SY
|
98,105.000
|
$3.000
|
$7.560
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
18,986.000
|
$6.750
|
$6.230
|
|
|
CONC PVMT (CONT REINF - CRCP) (8")
|
SY
|
14,086.000
|
$85.000
|
$130.590
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
75,974.000
|
$90.000
|
$160.440
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
75.000
|
$475.000
|
$662.900
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
60.000
|
$600.000
|
$741.870
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
416.000
|
$380.000
|
$477.200
|
|
|
CL A CONC (MISC)
|
CY
|
88.000
|
$850.000
|
$935.120
|
|
|
RETAINING WALL (SPECIAL)
|
SF
|
546.000
|
$45.000
|
$380.600
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
7.500
|
$625.000
|
$935.120
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
26.000
|
$550.000
|
$1,142.930
|
|
|
RIPRAP (STONE COMMON)(DRY)(8 IN)
|
CY
|
206.000
|
$205.000
|
$194.150
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
2,409.000
|
$255.000
|
$189.940
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
103.000
|
$600.000
|
$831.220
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
964.000
|
$370.000
|
$562.370
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,858.000
|
$88.500
|
$108.410
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
628.000
|
$109.000
|
$159.700
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
916.000
|
$150.000
|
$183.060
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
316.000
|
$182.000
|
$224.610
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
61.000
|
$350.000
|
$380.850
|
|
|
RC PIPE (CL III)(54 IN)
|
LF
|
158.000
|
$250.000
|
$413.570
|
|
|
RC PIPE (CL III)(60 IN)
|
LF
|
498.000
|
$495.000
|
$519.260
|
|
|
RC PIPE (CL IV)(36 IN)
|
LF
|
18.000
|
$240.000
|
$354.980
|
|
|
INLET (COMPL)(TY S)
|
EA
|
1.000
|
$6,400.000
|
$4,301.130
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
1.000
|
$7,500.000
|
$4,924.540
|
|
|
MANH (COMPL)(PRM)(60IN)
|
EA
|
2.000
|
$8,200.000
|
$4,560.880
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
3.000
|
$7,000.000
|
$5,854.690
|
|
|
INLET (COMPL)(PCO)(3FT)(NONE)
|
EA
|
2.000
|
$6,800.000
|
$4,815.670
|
|
|
INLET (COMPL)(PCO)(3FT)(LEFT)
|
EA
|
10.000
|
$7,000.000
|
$5,542.990
|
|
|
INLET (COMPL)(PCO)(3FT)(RIGHT)
|
EA
|
11.000
|
$6,700.000
|
$5,542.990
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
7.000
|
$6,500.000
|
$5,859.670
|
|
|
INLET (COMPL)(ARMOR CURB SLOT)
|
EA
|
7.000
|
$7,175.000
|
$2,938.690
|
|
|
HEADWALL (CH - FW - 0) (DIA= 36 IN)
|
EA
|
6.000
|
$18,000.000
|
$6,234.160
|
|
|
HEADWALL (CH - FW - 15) (DIA= 36 IN)
|
EA
|
2.000
|
$8,500.000
|
$7,792.700
|
|
|
HEADWALL (CH - FW - 15) (DIA= 60 IN)
|
EA
|
1.000
|
$14,000.000
|
$24,936.650
|
|
|
HEADWALL (CH - FW - 30) (DIA= 48 IN)
|
EA
|
2.000
|
$12,000.000
|
$18,702.490
|
|
|
HEADWALL (CH - FW - 30) (DIA= 54 IN)
|
EA
|
2.000
|
$13,000.000
|
$20,572.730
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
1.000
|
$7,500.000
|
$6,234.160
|
|
|
HEADWALL (CH - PW - 0) (DIA= 60 IN)
|
EA
|
1.000
|
$20,000.000
|
$16,624.430
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
4.000
|
$20,500.000
|
$10,390.270
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$2,200.000
|
$2,078.050
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$2,200.000
|
$2,078.060
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$2,250.000
|
$4,156.110
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
4.000
|
$4,000.000
|
$18,702.490
|
|
|
REMOV STR (HEADWALL)
|
EA
|
7.000
|
$2,000.000
|
$2,968.650
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,336,518.570
|
$6,262,734.580
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
23.000
|
$10,000.000
|
$7,896.600
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
1,535.000
|
$100.000
|
$76.650
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,535.000
|
$20.000
|
$25.650
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$32.000
|
$63.610
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$12.000
|
$25.650
|
|
|
EMBANK (EROSN & SEDMT CONT, IN PLACE)
|
CY
|
2,261.000
|
$29.000
|
$15.590
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
8,580.000
|
$7.910
|
$12.270
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
8,580.000
|
$5.490
|
$12.270
|
|
|
CONC CURB (MONO) (TY I)
|
LF
|
229.000
|
$24.000
|
$10.390
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
13,771.000
|
$25.000
|
$16.620
|
|
|
CONC SIDEWALKS (4")
|
SY
|
372.000
|
$75.000
|
$114.290
|
|
|
CONC SIDEWALKS (5")
|
SY
|
1,178.000
|
$90.000
|
$197.420
|
|
|
CURB RAMPS (TY 2)
|
EA
|
2.000
|
$2,200.000
|
$2,909.280
|
|
|
CURB RAMPS (TY 10)
|
EA
|
3.000
|
$1,800.000
|
$2,909.280
|
|
|
CURB RAMPS (TY 20)
|
EA
|
3.000
|
$3,000.000
|
$4,363.910
|
|
|
CURB RAMPS (TY 21)
|
EA
|
1.000
|
$2,600.000
|
$3,324.890
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
1,649.000
|
$41.000
|
$37.400
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
7.000
|
$2,000.000
|
$2,221.440
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
400.000
|
$10.000
|
$3.120
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
7.000
|
$3,500.000
|
$4,255.850
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$400.000
|
$335.610
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
6.000
|
$1,100.000
|
$1,870.250
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
6.000
|
$12,700.000
|
$10,047.390
|
|
|
WIRE FENCE (TY A)
|
LF
|
12,427.000
|
$20.000
|
$19.220
|
|
|
IN RD IL (TY SA) 40T-12 (250W EQ) LED
|
EA
|
52.000
|
$6,000.000
|
$6,849.470
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
12,135.000
|
$25.000
|
$34.540
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
570.000
|
$36.000
|
$56.680
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
31,216.000
|
$3.250
|
$3.270
|
|
|
ELEC CONDR (NO.2) INSULATED
|
LF
|
8,899.000
|
$5.000
|
$5.150
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
20.000
|
$1,675.000
|
$2,301.440
|
|
|
ELC SRV TY D 120/240 060(NS)GS(N)GC(O)
|
EA
|
1.000
|
$9,000.000
|
$10,598.070
|
|
|
ELC SRV TY D 120/240 100(NS)GS(N)GC(O)
|
EA
|
2.000
|
$9,200.000
|
$11,319.160
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
52.000
|
$1,000.000
|
$1,248.910
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$1,160.000
|
$1,723.750
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
4.000
|
$1,360.000
|
$1,758.030
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
2.000
|
$1,800.000
|
$2,063.510
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
10.000
|
$1,500.000
|
$3,794.940
|
|
|
INS OH SN SUP(30 FT BAL TEE)
|
EA
|
2.000
|
$53,500.000
|
$69,525.570
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
582.000
|
$2.500
|
$2.180
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,983.000
|
$1.900
|
$2.390
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
538.000
|
$3.500
|
$2.910
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
4.000
|
$230.000
|
$181.830
|
|
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
|
EA
|
34.000
|
$56.000
|
$57.150
|
|
RE PM TY I (ACC PRK)(WHT)(SYMBOL ONLY)
|
EA
|
4.000
|
$650.000
|
$57.150
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
23,220.000
|
$0.900
|
$1.000
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
15,786.000
|
$1.250
|
$1.920
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
12,360.000
|
$1.400
|
$1.920
|
|
REFL PAV MRKR TY I-A
|
EA
|
529.000
|
$5.000
|
$4.520
|
|
REFL PAV MRKR TY I-C
|
EA
|
627.000
|
$6.000
|
$4.520
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
169.000
|
$7.000
|
$4.520
|
|
|
LANDSCAPE AMENITY (TY 1)
|
EA
|
38.000
|
$500.000
|
$405.220
|
|
|
LANDSCAPE AMENITY (TY 2)
|
EA
|
71.000
|
$250.000
|
$405.220
|
|
|
LANDSCAPE AMENITY (TY 3)
|
EA
|
195.000
|
$100.000
|
$405.220
|
|
|
LANDSCAPE AMENITY (TY 4)
|
EA
|
1.000
|
$6,680.000
|
$20,780.540
|
|
|
LANDSCAPE AMENITY (TY 5)
|
EA
|
2.000
|
$8,400.000
|
$10,390.270
|
|
|
LANDSCAPE AMENITY (TY 6)
|
EA
|
2.000
|
$93,000.000
|
$10,390.270
|
|
|
LANDSCAPE AMENITY (TY 7)
|
EA
|
2.000
|
$24,300.000
|
$10,390.270
|
|
|
LOOSE AGGR FOR GROUNDCOVER (TYPE I)
|
CY
|
40.000
|
$250.000
|
$598.480
|
|
|
LOOSE AGGR FOR GROUNDCOVER (TYPE II)
|
CY
|
65.000
|
$100.000
|
$534.060
|
|
|
LOOSE AGGR FOR GROUNDCOVER (TYPE III)
|
CY
|
75.000
|
$280.000
|
$592.250
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
20,706.000
|
$133.000
|
$144.680
|
|
|
WHEEL STOPS
|
EA
|
4.000
|
$136.000
|
$1,039.030
|
|
|
SAFETY REST AREA
|
LS
|
1.000
|
$10,846,802.110
|
$30,008,285.000
|
|
|
PATCHING MILLED CONCRETE RUMBLE STRIPS
|
LF
|
3,365.000
|
$50.000
|
$46.760
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$9,560.000
|
$15,585.410
|
|
|
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)
|
EA
|
3.000
|
$3,200.000
|
$1,511.780
|
|
|
INSTALL DMS (POLE MTD CABINET)
|
EA
|
2.000
|
$31,000.000
|
$54,487.610
|
|
|
ITS POLE (55 FT)(90 MPH)
|
EA
|
3.000
|
$26,250.000
|
$33,014.040
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 2)
|
EA
|
3.000
|
$7,600.000
|
$6,787.960
|
|
|
SYSTEM INTEGRATION
|
LS
|
1.000
|
$100,000.000
|
$39,483.020
|
|
|
INSTALLATION OF CELLULAR MODEM
|
EA
|
5.000
|
$2,200.000
|
$1,326.840
|
|
Totals: |
$36,843,188.380
|
$67,770,417.973
|