|
|
|
PREPARING ROW
|
STA
|
843.000
|
$750.000
|
$350.000
|
$400.000
|
$1,200.000
|
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
242.000
|
$10.000
|
$35.000
|
$50.000
|
$50.000
|
|
|
|
OBLITERATING ABANDONED ROAD
|
SY
|
2,822.000
|
$6.000
|
$4.000
|
$20.000
|
$5.000
|
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
23,109.000
|
$15.000
|
$15.150
|
$10.000
|
$18.000
|
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
2.000
|
$150.000
|
$600.000
|
$3,000.000
|
$400.000
|
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
8,208.000
|
$25.000
|
$18.000
|
$18.000
|
$50.000
|
|
|
|
BACKFILL (TY A OR B)
|
STA
|
844.000
|
$275.000
|
$275.000
|
$300.000
|
$500.000
|
|
|
|
BLADING
|
LF
|
54,435.000
|
$2.000
|
$1.000
|
$1.500
|
$5.000
|
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2) (6")
|
SY
|
103,002.000
|
$20.000
|
$15.500
|
$16.000
|
$25.000
|
|
|
|
PRIME COAT (SS-1H)
|
GAL
|
18,741.000
|
$8.000
|
$6.000
|
$6.500
|
$6.250
|
|
|
|
EMULS ASPH (EROSN CONT)(MULTI)
|
GAL
|
7,643.000
|
$6.000
|
$6.000
|
$6.500
|
$6.250
|
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
2,500.000
|
$80.000
|
$75.000
|
$40.000
|
$65.000
|
|
|
|
PLANE ASPH CONC PAV (0"- 2 1/2")
|
SY
|
1,166.000
|
$4.500
|
$9.000
|
$7.000
|
$6.000
|
|
|
|
PLANE ASPH CONC PAV (0" TO 1/2" MICRO)
|
SY
|
10,000.000
|
$7.000
|
$4.000
|
$18.000
|
$5.000
|
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
1,071.000
|
$80.000
|
$80.000
|
$40.000
|
$70.000
|
|
|
|
FLOWABLE BACKFILL
|
CY
|
1,605.000
|
$175.000
|
$280.000
|
$200.000
|
$250.000
|
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
509.000
|
$3.000
|
$1.750
|
$15.000
|
$5.500
|
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,898.000
|
$25.000
|
$6.000
|
$40.000
|
$22.000
|
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
42.000
|
$400.000
|
$510.000
|
$560.000
|
$520.000
|
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
16.000
|
$450.000
|
$320.000
|
$353.000
|
$335.000
|
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
93.500
|
$430.000
|
$550.000
|
$375.000
|
$700.000
|
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
0.700
|
$600.000
|
$1,400.000
|
$5,000.000
|
$2,500.000
|
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
97.000
|
$120.000
|
$300.000
|
$200.000
|
$180.000
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
49.000
|
$500.000
|
$525.000
|
$450.000
|
$700.000
|
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
86.000
|
$275.000
|
$325.000
|
$350.000
|
$700.000
|
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
368.000
|
$95.000
|
$82.000
|
$68.000
|
$110.000
|
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
2,519.000
|
$100.000
|
$105.000
|
$120.000
|
$155.000
|
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
1,142.000
|
$180.000
|
$195.000
|
$225.000
|
$295.000
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
1.000
|
$8,700.000
|
$7,500.000
|
$15,000.000
|
$15,000.000
|
|
|
|
WINGWALL (PW - 1) (HW=3 FT)
|
EA
|
1.000
|
$9,500.000
|
$8,500.000
|
$15,000.000
|
$15,000.000
|
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
1.000
|
$22,000.000
|
$25,000.000
|
$40,000.000
|
$35,000.000
|
|
|
|
SET (TY I) (24 IN) (3: 1) (C)
|
EA
|
10.000
|
$1,100.000
|
$4,500.000
|
$3,200.000
|
$3,500.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
10.000
|
$1,500.000
|
$1,600.000
|
$2,700.000
|
$2,500.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
56.000
|
$2,000.000
|
$1,650.000
|
$3,000.000
|
$3,000.000
|
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
31.000
|
$3,500.000
|
$4,200.000
|
$3,800.000
|
$5,500.000
|
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
10.000
|
$2,000.000
|
$1,600.000
|
$10,000.000
|
$10,000.000
|
|
|
|
REMOV STR (PIPE)
|
LF
|
3,824.000
|
$50.000
|
$16.000
|
$12.000
|
$25.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,935,000.000
|
$1,230,000.000
|
$2,200,000.000
|
$2,000,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
21.000
|
$15,000.000
|
$14,000.000
|
$20,000.000
|
$18,000.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
639.000
|
$65.000
|
$100.000
|
$60.000
|
$65.000
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
639.000
|
$5.000
|
$22.000
|
$10.000
|
$20.000
|
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
311.000
|
$24.000
|
$36.500
|
$30.000
|
$50.000
|
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
311.000
|
$5.000
|
$10.000
|
$10.000
|
$20.000
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
42,704.000
|
$3.700
|
$3.150
|
$4.000
|
$4.500
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
42,704.000
|
$1.000
|
$1.050
|
$1.000
|
$1.000
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,410.000
|
$5.000
|
$7.500
|
$6.000
|
$5.000
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,410.000
|
$2.000
|
$1.650
|
$6.000
|
$1.500
|
|
|
|
CONSTRUCTING DETOURS
|
SY
|
1,931.000
|
$50.000
|
$35.000
|
$40.000
|
$45.000
|
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
1,260.000
|
$15.000
|
$12.000
|
$50.000
|
$25.000
|
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
48,720.000
|
$3.000
|
$2.550
|
$3.000
|
$5.000
|
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
1,260.000
|
$15.000
|
$11.000
|
$20.000
|
$25.000
|
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
462.000
|
$20.000
|
$65.000
|
$50.000
|
$35.000
|
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
289.000
|
$20.000
|
$50.000
|
$50.000
|
$35.000
|
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
165,545.000
|
$0.200
|
$0.190
|
$1.000
|
$0.150
|
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
166,872.000
|
$0.250
|
$0.140
|
$1.000
|
$0.150
|
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
450.000
|
$32.000
|
$30.000
|
$35.000
|
$60.000
|
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
2.000
|
$1,600.000
|
$2,100.000
|
$3,400.000
|
$3,000.000
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$3,300.000
|
$3,500.000
|
$4,400.000
|
$3,200.000
|
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
116.000
|
$900.000
|
$725.000
|
$1,000.000
|
$1,300.000
|
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
6.000
|
$1,000.000
|
$750.000
|
$1,200.000
|
$800.000
|
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
6.000
|
$10,000.000
|
$10,000.000
|
$25,000.000
|
$10,000.000
|
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
13.000
|
$700.000
|
$750.000
|
$1,000.000
|
$400.000
|
|
|
|
RELOCATE RD IL ASM (TRANS-BASE)
|
EA
|
2.000
|
$2,500.000
|
$4,550.000
|
$5,030.000
|
$4,600.000
|
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
490.000
|
$30.000
|
$19.900
|
$22.000
|
$21.000
|
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
489.000
|
$35.000
|
$32.000
|
$35.000
|
$34.000
|
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
2,475.000
|
$3.500
|
$2.950
|
$3.500
|
$3.150
|
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
195.000
|
$4.000
|
$3.150
|
$3.750
|
$3.250
|
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
1,032.000
|
$4.500
|
$4.700
|
$5.500
|
$4.750
|
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
8.000
|
$1,525.000
|
$1,850.000
|
$2,050.000
|
$1,950.000
|
|
|
|
REMOVE GROUND BOX
|
EA
|
2.000
|
$300.000
|
$250.000
|
$275.000
|
$300.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
47.000
|
$750.000
|
$900.000
|
$1,000.000
|
$950.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
9.000
|
$800.000
|
$1,190.000
|
$1,290.000
|
$1,250.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
|
EA
|
1.000
|
$900.000
|
$1,400.000
|
$1,600.000
|
$1,450.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
6.000
|
$1,000.000
|
$1,200.000
|
$1,290.000
|
$1,250.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
3.000
|
$1,000.000
|
$1,335.000
|
$1,580.000
|
$1,400.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
|
EA
|
1.000
|
$1,100.000
|
$1,990.000
|
$2,200.000
|
$1,050.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
6.000
|
$1,165.000
|
$1,300.000
|
$1,400.000
|
$1,350.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
6.000
|
$1,200.000
|
$1,300.000
|
$1,400.000
|
$1,350.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
|
EA
|
2.000
|
$1,300.000
|
$1,415.000
|
$2,000.000
|
$1,500.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
6.000
|
$1,350.000
|
$1,400.000
|
$1,500.000
|
$1,400.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
72.000
|
$135.000
|
$225.000
|
$250.000
|
$250.000
|
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
72.000
|
$70.000
|
$75.000
|
$450.000
|
$75.000
|
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
86.000
|
$27.000
|
$35.000
|
$50.000
|
$20.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
11.000
|
$30.000
|
$35.000
|
$80.000
|
$40.000
|
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
307,320.000
|
$1.300
|
$0.650
|
$0.400
|
$0.200
|
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
307,320.000
|
$1.300
|
$0.650
|
$0.400
|
$0.200
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
9,398.000
|
$2.000
|
$1.900
|
$2.400
|
$1.000
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
6,265.000
|
$1.500
|
$1.900
|
$1.750
|
$1.000
|
|
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
1,596.000
|
$1.300
|
$0.950
|
$1.000
|
$2.100
|
|
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
955.000
|
$3.500
|
$4.000
|
$4.650
|
$4.500
|
|
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
12,347.000
|
$0.700
|
$0.490
|
$0.600
|
$0.750
|
|
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
8,899.000
|
$0.850
|
$0.750
|
$0.850
|
$1.150
|
|
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
167,967.000
|
$0.900
|
$0.650
|
$0.750
|
$1.050
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
2,692.000
|
$0.400
|
$0.490
|
$0.900
|
$0.850
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
164,243.000
|
$0.700
|
$0.450
|
$0.550
|
$0.750
|
|
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
44.000
|
$13.000
|
$18.000
|
$27.000
|
$29.000
|
|
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
12.000
|
$190.000
|
$240.000
|
$300.000
|
$240.000
|
|
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
10.000
|
$490.000
|
$550.000
|
$600.000
|
$570.000
|
|
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
6.000
|
$250.000
|
$295.000
|
$340.000
|
$325.000
|
|
|
|
REFL PAV MRKR TY I-C
|
EA
|
452.000
|
$4.500
|
$5.000
|
$6.000
|
$5.000
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,323.000
|
$4.500
|
$3.250
|
$3.500
|
$4.800
|
|
|
|
REMOVE SHOULDER TEXTURING
|
LF
|
122,485.000
|
$2.000
|
$2.250
|
$4.000
|
$0.150
|
|
|
|
D-GR HMA TY-B SAC-B PG64-22
|
TON
|
19,936.000
|
$105.000
|
$120.000
|
$110.000
|
$122.000
|
|
|
|
TACK COAT
|
GAL
|
4,906.000
|
$7.500
|
$7.000
|
$5.500
|
$6.250
|
|
|
|
D-GR HMA TY-D PG 64-22 (EXEMPT)
|
TON
|
2,000.000
|
$120.000
|
$170.000
|
$130.000
|
$124.000
|
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
66,755.000
|
$140.000
|
$140.000
|
$126.000
|
$142.000
|
|
|
|
INSTALL ELECTRICAL SPLICE
|
EA
|
7.000
|
$180.000
|
$475.000
|
$505.000
|
$200.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$9,000.000
|
$14,000.000
|
$20,000.000
|
|
|
|
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)
|
EA
|
2.000
|
$3,000.000
|
$7,600.000
|
$8,400.000
|
$8,000.000
|
|
|
|
CONDUIT (PREPARE)
|
LF
|
425.000
|
$4.500
|
$2.250
|
$2.500
|
$2.500
|
|
|
|
GROUND BOX (PREPARE)
|
EA
|
8.000
|
$450.000
|
$550.000
|
$610.000
|
$600.000
|
|
|
|
ITS POLE (55 FT)(90 MPH)
|
EA
|
2.000
|
$23,950.000
|
$26,500.000
|
$30,000.000
|
$27,000.000
|
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 2)
|
EA
|
2.000
|
$8,000.000
|
$12,250.000
|
$13,500.000
|
$13,000.000
|
|
|
|
INSTALLATION OF FES (FIELD CABINET)
|
EA
|
2.000
|
$1,850.000
|
$2,000.000
|
$2,220.000
|
$2,500.000
|
|
|
|
REMOVE EXISTING CABLES (POWER)
|
LF
|
560.000
|
$2.500
|
$2.000
|
$2.500
|
$2.500
|
|
|
|
TMA (STATIONARY)
|
DAY
|
188.000
|
$300.000
|
$300.000
|
$350.000
|
$250.000
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
43.000
|
$450.000
|
$500.000
|
$500.000
|
$250.000
|
|
|
|
ITS RVSD (DC ONLY) (INSTALL ONLY)
|
EA
|
2.000
|
$1,500.000
|
$1,505.000
|
$1,675.000
|
$1,550.000
|
|
|
|
SYSTEM INTEGRATION
|
LS
|
1.000
|
$250,000.000
|
$25,000.000
|
$28,000.000
|
$26,000.000
|
|
|
|
INSTALLATION OF CELLULAR MODEM
|
EA
|
2.000
|
$650.000
|
$3,755.000
|
$4,200.000
|
$4,000.000
|
|
1
|
|
UNDERSEAL COURSE
|
GAL
|
99,463.000
|
$7.500
|
$5.500
|
$6.000
|
$6.250
|
|
1A
|
|
ASPH (MULTI OPTION)
|
GAL
|
174,065.000
|
$2.500
|
$0.000
|
$0.000
|
$0.000
|
|
1A
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
4,520.000
|
$27.500
|
$0.000
|
$0.000
|
$0.000
|
|
1A
|
|
TACK COAT
|
GAL
|
74,600.000
|
$2.500
|
$0.000
|
$0.000
|
$0.000
|
|
Totals: |
$23,914,394.350
|
$21,060,676.340
|
$21,954,050.500
|
$24,891,695.950
|