Show Job Controls
Bid Cobra

HUDSPETH IH 10 (0002-06-062)

Items: 55

County: HUDSPETH
Length: N/A
Highway: IH 10
District: EL PASO
Control Number: 0002-06-062
DBE Goal: N/A
Project: F 2023(118)
Guaranty: N/A
Time: 60 WORKING DAYS
Engineer's Estimate: $5,305,331.55
Date: 09/07/2022 (3 years ago)
Contract Number: N/A
Type: PREVENTIVE MAINTENANCE
Mail/Deliver Bids To: N/A
CHRISTOPHER WEBER
ALDO MADRID
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$5,305,331.55
$4,777,419.05
Over/Under Est: -9.95% -$527,912.50
Over/Under Est: 20.95% $1,111,616.85
Amt Left: 34.32% $1,639,529.35
Over/Under Est: 29.9% $1,586,050.95
Amt Left: 44.25% $2,113,963.45
Delta: -7.39% -$474,434.10

Bid Items & Bid Tabulations

55 Total 0 of 55
HUDSPETH  |  IH 10  |  EL PASO  |  0002-06-062  |  09/07/2022  |  $5,305,331.55  |  F 2023(118)  |  PREVENT MAINT  |  60 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DAN WILLIAMS COMPANY
LESNA CONSTRUCTION, INC.
INTERNATIONAL EAGLE ENTERPRISES, INC.
EXCAVATION (SPECIAL)
CY 2.000 $400.000 $700.000 $850.000 $1,000.000
BACKFILL (TY A OR B)
STA 255.000 $275.000 $250.000 $275.000 $275.000
EMULS ASPH (EROSN CONT)(MULTI)
GAL 635.000 $6.000 $20.000 $7.500 $15.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 5,381.000 $65.000 $50.000 $70.000 $60.000
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 4,289.000 $1.330 $6.500 $6.000 $10.000
PLANE ASPH CONC PAV(MICRO-MLLING)(1")
SY 107,624.000 $0.770 $0.900 $4.500 $8.000
DRILL SHAFT (42 IN)
LF 84.000 $565.000 $570.000 $650.000 $625.000
DRILL SHAFT (54 IN)
LF 76.000 $565.000 $575.000 $700.000 $625.000
RIPRAP (CONC)(4 IN)
CY 9.000 $490.000 $850.000 $900.000 $700.000
RIPRAP (MOW STRIP)(4 IN)
CY 26.000 $475.000 $625.000 $700.000 $550.000
MOBILIZATION
LS 1.000 $296,688.020 $52,000.000 $400,000.000 $600,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $15,000.000 $2,500.000 $15,000.000 $25,000.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 42,240.000 $0.190 $0.130 $0.260 $2.000
MTL W-BEAM GD FEN (STEEL POST)
LF 300.000 $37.000 $45.000 $45.000 $45.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,460.000 $1,450.000 $2,000.000 $2,500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,370.000 $3,200.000 $3,800.000 $3,800.000
CONDT (PVC) (SCH 40) (2")
LF 400.000 $33.000 $29.850 $35.000 $33.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 710.000 $40.000 $42.000 $60.000 $48.000
ELEC CONDR (NO.6) INSULATED
LF 1,000.000 $4.000 $3.260 $4.500 $5.000
ELEC CONDR (NO.4) INSULATED
LF 1,215.000 $4.200 $3.950 $5.000 $6.500
ELEC CONDR (NO.2) INSULATED
LF 1,650.000 $5.250 $4.700 $5.000 $6.000
GROUND BOX TY A (122311)W/APRON
EA 11.000 $1,550.000 $2,225.000 $2,700.000 $3,200.000
ELC SRV TY D 120/240 060(NS)GS(N)GC(O)
EA 3.000 $8,000.000 $9,880.000 $12,000.000 $12,000.000
ELC SRV TY D 120/240 100(NS)GS(N)GC(O)
EA 2.000 $9,000.000 $11,105.000 $13,000.000 $13,000.000
INS OH SN SUP(30 FT BAL TEE)
EA 2.000 $41,000.000 $60,000.000 $63,500.000 $67,000.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,708.000 $2.000 $2.050 $5.000 $4.000
REFL PAV MRK TY I (W)(NUMBER)(090MIL)
EA 2.000 $280.000 $250.000 $275.000 $350.000
REFL PAV MRK TY I(W)(ENTR GORE)(090MIL)
EA 2.000 $1,000.000 $1,425.000 $850.000 $2,500.000
REFL PAV MRK TY I(W)(EXIT GORE)(090MIL)
EA 2.000 $745.000 $1,675.000 $950.000 $2,700.000
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 25,389.000 $5.000 $0.750 $1.000 $1.100
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
LF 5,280.000 $0.630 $1.200 $1.000 $2.000
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 25,389.000 $0.500 $0.750 $1.000 $1.150
REFL PAV MRKR TY II-C-R
EA 316.000 $3.230 $6.350 $6.000 $10.000
STONE-MTRX-ASPH SMA-C SAC-A PG76-22
TON 14,798.000 $160.000 $153.000 $180.000 $167.000
TACK COAT
GAL 16,144.000 $6.500 $5.500 $7.500 $7.750
TBWC (MEMBRANE)
GAL 23,677.000 $7.000 $5.000 $7.500 $7.750
TBWC PG76-22 SAC-A TY C
TON 5,381.000 $150.000 $145.000 $175.000 $167.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 20.000 $100.000 $130.000 $875.000 $200.000
ITS SYSTEM SUPPORT EQUIPMENT
LS 1.000 $40,000.000 $60,000.000 $58,000.000 $62,000.000
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)
EA 4.000 $5,000.000 $1,055.000 $1,200.000 $1,300.000
INSTALL DMS (POLE MTD CABINET)
EA 2.000 $40,000.000 $40,000.000 $41,000.000 $46,000.000
ITS POLE (55 FT)(90 MPH)
EA 4.000 $24,000.000 $28,500.000 $29,000.000 $35,000.000
ITS POLE MNT CAB (TY 2)(CONF 2)
EA 4.000 $8,500.000 $7,900.000 $8,000.000 $10,000.000
INSTALLATION OF FES (FIELD CABINET)
EA 1.000 $1,800.000 $2,050.000 $2,200.000 $2,800.000
TMA (STATIONARY)
DAY 29.000 $300.000 $300.000 $325.000 $150.000
TMA (MOBILE OPERATION)
DAY 29.000 $450.000 $510.000 $600.000 $300.000
SYSTEM INTEGRATION
LS 1.000 $45,000.000 $45,000.000 $48,000.000 $51,000.000
INSTALLATION OF CELLULAR MODEM
EA 6.000 $750.000 $4,000.000 $4,100.000 $4,700.000
FUR & INST ROADWAY WEATHER INFO SYSTEM
EA 1.000 $120,000.000 $97,000.000 $98,000.000 $106,000.000
PRECIPITATION TYPE SENSOR
EA 1.000 $9,300.000 $11,000.000 $11,000.000 $12,500.000
AIR TEMPERATURE/RELATIVE HUMIDITY SENSO
EA 1.000 $2,000.000 $2,305.000 $2,500.000 $3,000.000
NON-INTRUSIVE PAVEMENT CONDITION SENSOR
EA 1.000 $21,000.000 $20,000.000 $22,000.000 $22,000.000
NON-INTRUSIVE PAVEMENT TEMP SENSOR
EA 1.000 $13,000.000 $15,250.000 $16,000.000 $17,300.000
WINDSPEED/DIRECTION SENSOR
EA 1.000 $4,600.000 $5,300.000 $5,500.000 $6,000.000
BAROMETRIC PRESSURE SENSOR
EA 1.000 $2,300.000 $2,650.000 $2,800.000 $3,200.000
Totals: $5,305,331.550 $4,777,419.050 $6,416,948.400 $6,891,382.500