Show Job Controls
Bid Cobra

HOWARD IH0020 (6451-89-001)

Items: 32

County: HOWARD
Length: N/A
Highway: IH0020
District: ABILENE
Control Number: 6451-89-001
DBE Goal: N/A
Project: RMC - 645189001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $1,757,056.55
Date: 10/06/2023 (2 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
RYAN SAYLES
LARISSA HALFORD
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$1,757,056.55
$1,384,501.00
Over/Under Est: -21.2% -$372,555.55
$1,479,706.00
Over/Under Est: -15.78% -$277,350.55
Amt Left: 6.88% $95,205.00
$1,665,084.67
Over/Under Est: -5.23% -$91,971.88
Amt Left: 20.27% $280,583.67
Delta: -12.53% -$185,378.67

Bid Items & Bid Tabulations

32 Total 0 of 32
HOWARD  |  IH0020  |  ABILENE  |  6451-89-001  |  10/06/2023  |  $1,757,056.55  |  RMC - 645189001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
AUSTIN BARRICADE COMPANY, L.L.C.
DIGG COMMERCIAL, LLC
HJC FARMS, INC.
MOBILIZATION (CALLOUT)
EA 35.000 $1,000.000 $1.000 $1.000 $250.000
MOBILIZATION (EMERGENCY)
EA 100.000 $500.000 $1.000 $1.000 $1,000.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 10.000 $1,700.000 $800.000 $1.000 $226.000
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 5.000 $800.000 $250.000 $1.000 $200.000
MTL BM GD FEN TRANS (31"-28")(25')
EA 6.000 $350.000 $880.000 $1.000 $185.000
REMOVE TERMINAL ANCHOR SECTION
EA 22.000 $350.000 $1.000 $1.000 $25.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 111.000 $40.000 $19.000 $1.000 $24.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 8.000 $33.000 $90.000 $1.000 $24.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 11,900.000 $30.000 $20.000 $1.000 $23.500
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 82.000 $25.000 $48.000 $1.000 $17.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 50.000 $20.000 $48.000 $1.000 $33.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 875.000 $25.000 $38.000 $1.000 $27.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 827.000 $50.000 $35.000 $1.000 $22.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 466.000 $100.000 $35.000 $1.000 $60.000
REPAIR STEEL POST WITH BASE PLATE
EA 10.000 $100.000 $180.000 $1.000 $150.000
INSTALL BLOCKOUT (TYPE SPECIFIED)
EA 873.000 $20.000 $10.000 $1.000 $13.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 350.000 $40.000 $50.000 $1.000 $48.250
REPLACE SINGLE GDRAIL TERMINAL POST
EA 33.000 $100.000 $104.000 $1.000 $310.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 95.000 $4,000.000 $3,325.000 $1.000 $3,550.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 9.000 $1,000.000 $1,244.000 $500.000 $650.000
REM & RESET SGT IMPACT HEAD
EA 7.000 $350.000 $302.000 $500.000 $200.000
REMOVE AND REPLACE DAT
EA 3.000 $1,400.000 $4,500.000 $1.000 $1,226.000
REPLACE POSTS (TL-4)
EA 2,258.000 $230.000 $185.000 $1.000 $275.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 36.000 $165.000 $150.000 $1.000 $1.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 1.000 $150.000 $500.000 $1,500.000 $50.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 61.000 $1,200.000 $500.000 $1.000 $2,000.000
REPLACE CABLE (TL-4)
LF 5,017.000 $5.000 $1.000 $1.000 $0.010
CHECK / RE-TENSION CABLE
EA 4.000 $175.000 $3,525.000 $1,500.000 $200.000
REPAIR (TRACC)
LF 9.000 $34.000 $100.000 $300.000 $1.000
REPAIR (FASTRACC)
LF 46.000 $1,000.000 $100.000 $200.000 $1.000
CONCRETE RAIL REPAIR (MISC)
LF 35.000 $223.330 $150.000 $1.000 $500.000
TMA (STATIONARY)
DAY 186.000 $305.000 $1,000.000 $7,683.000 $250.000
Totals: $1,757,056.550 $1,384,501.000 $1,479,706.000 $1,665,084.670