Show Job Controls
Bid Cobra

HOWARD IH0020 (6328-56-001)

Items: 58

County: HOWARD
Length: N/A
Highway: IH0020
District: ABILENE
Control Number: 6328-56-001
DBE Goal: N/A
Project: RMC - 632856001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $988,485.00
Date: 05/02/2018 (8 years ago)
Contract Number: N/A
Type: CALL OUT MBGF
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$988,485.00
$951,385.00
Over/Under Est: -3.75% -$37,100.00
Over/Under Est: 0.22% $2,215.00
Amt Left: 4.13% $39,315.00

Bid Items & Bid Tabulations

58 Total 0 of 58
HOWARD  |  IH0020  |  ABILENE  |  6328-56-001  |  05/02/2018  |  $988,485.00  |  RMC - 632856001  |  CALL OUT MBGF  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HJC FARMS, INC.
K-BAR SERVICES, INC.
REMOVING CONC (MISC)
CY 40.000 $76.000 $50.000 $150.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 200.000 $125.000 $65.000 $100.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 500.000 $134.000 $65.000 $100.000
CONC STR REPAIR (STANDARD)
SF 500.000 $117.000 $35.000 $150.000
RIPRAP (CONC)(5 IN)
CY 40.000 $446.000 $450.000 $380.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 100.000 $37.000 $85.000 $25.000
STR STEEL (RAILS / POSTS / PLATES)
LB 100.000 $52.000 $5.000 $10.000
HEADER TYPE EXPANSION JOINT
CF 50.000 $464.000 $500.000 $500.000
JOINT SEALANT
LF 200.000 $22.000 $45.000 $20.000
MOBILIZATION (CALLOUT)
EA 10.000 $37.000 $50.000 $100.000
MOBILIZATION (EMERGENCY)
EA 60.000 $143.000 $50.000 $20.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,044.000 $100.000 $600.000
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $142.000 $1.000 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 200.000 $24.000 $25.000 $20.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 10.000 $19.000 $15.000 $10.000
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
EA 10.000 $14.000 $15.000 $10.000
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 25.000 $5.000 $15.000 $20.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 13,000.000 $16.000 $20.000 $16.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 25.000 $24.000 $45.000 $70.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 20.000 $27.000 $45.000 $70.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 500.000 $34.000 $20.000 $30.000
RAISE RAIL ELEMENT
LF 10.000 $2.000 $6.000 $6.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 600.000 $34.000 $50.000 $40.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 400.000 $23.000 $60.000 $60.000
REALIGN POSTS
EA 200.000 $24.000 $18.000 $15.000
INSTALL BLOCKOUT (TYPE SPECIFIED)
EA 500.000 $9.000 $8.000 $6.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 200.000 $18.000 $40.000 $25.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 25.000 $51.000 $50.000 $60.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 5.000 $40.000 $1.000 $1.000
REPLACE TERMINAL ANCHOR POSTS
EA 20.000 $54.000 $1.000 $1.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 100.000 $2,594.000 $3,000.000 $2,800.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 10.000 $58.000 $850.000 $300.000
REM & RESET SGT IMPACT HEAD
EA 10.000 $103.000 $200.000 $300.000
REPLACE SGT CABLE ASSEMBLY
EA 5.000 $54.000 $1.000 $1.000
REPLACE SGT CABLE ANCHOR
EA 5.000 $56.000 $1.000 $1.000
REPLACE SGT STRUT
EA 5.000 $59.000 $1.000 $1.000
REPLACE SGT OBJECT MARKER
EA 10.000 $36.000 $1.000 $200.000
REPLACE POSTS (TL-4)
EA 500.000 $125.000 $200.000 $220.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 15.000 $136.000 $150.000 $150.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 2.000 $55.000 $10.000 $50.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 20.000 $1,163.000 $1,000.000 $800.000
REPLACE CABLE (TL-4)
LF 50.000 $2.000 $2.000 $11.000
CHECK / RE-TENSION CABLE
EA 10.000 $54.000 $160.000 $150.000
REMOVE AND REPLACE (TRACC)
EA 5.000 $4,000.000 $250.000 $500.000
REMOVE AND REPLACE (WIDE TRACC)
EA 5.000 $2,000.000 $250.000 $500.000
REMOVE AND REPLACE (NARROW REACT 350)
EA 5.000 $3,000.000 $250.000 $500.000
REPAIR (TRACC)
LF 50.000 $70.000 $50.000 $50.000
REPAIR (WIDE TRACC)
EA 50.000 $55.000 $50.000 $500.000
REPAIR (NARROW REACT 350)
LF 50.000 $100.000 $50.000 $50.000
REMOVE AND REPLACE (FASTRACC)
EA 5.000 $4,000.000 $250.000 $500.000
REPAIR (FASTRACC)
LF 50.000 $100.000 $50.000 $50.000
REPAIR (STEEL POST W/ W-BEAM - T101)
LF 10.000 $30.000 $30.000 $160.000
REPAIR (STL POST W/ DOUBLED W-BEAMS-T6)
LF 10.000 $55.000 $30.000 $160.000
CONCRETE RAIL REPAIR (MISC)
LF 20.000 $276.000 $250.000 $220.000
CONCRETE POST REPAIR
EA 10.000 $192.000 $10.000 $100.000
CONCRETE POST REPLACEMENT
EA 5.000 $290.000 $10.000 $100.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 100.000 $200.000 $25.000 $1.000
TMA (STATIONARY)
DAY 100.000 $275.000 $150.000 $250.000
Totals: $988,485.000 $951,385.000 $990,700.000