Show Job Controls
Bid Cobra

HOWARD FM 846 (1872-02-019)

Items: 32

County: HOWARD
Length: N/A
Highway: FM 846
District: ABILENE
Control Number: 1872-02-019
DBE Goal: N/A
Project: STP 2022(337)HES
Guaranty: N/A
Time: 24 WORKING DAYS
Engineer's Estimate: $857,084.90
Date: 02/04/2022 (4 years ago)
Contract Number: N/A
Type: INSTALL/REPLACE SIGNS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (3)
E
Engineer's Estimate
$857,084.90
1
$995,017.15
Over/Under Est: 16.09% $137,932.25
Over/Under Est: 22.11% $189,524.30
Amt Left: 5.19% $51,592.05
Over/Under Est: 25.19% $215,927.18
Amt Left: 7.84% $77,994.93
Delta: -2.52% -$26,402.88

Bid Items & Bid Tabulations

32 Total 0 of 32
HOWARD  |  FM 846  |  ABILENE  |  1872-02-019  |  02/04/2022  |  $857,084.90  |  STP 2022(337)HES  |  INSTL/REPLACE SIGNS  |  24 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RK HALL, LLC
DELHUR INDUSTRIES, INC.
WG ENGINEERING & CONSTRUCTION, LLC
REMOVING STAB BASE AND ASPH PAV (2")
SY 131.000 $7.500 $10.500 $12.000 $12.000
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 713.000 $25.000 $34.580 $60.000 $19.000
BACKFILL (TY B)
STA 19.000 $250.000 $800.000 $240.000 $405.000
MOBILIZATION
LS 1.000 $77,916.900 $95,636.150 $172,681.950 $68,950.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 2.000 $8,000.000 $20,000.000 $17,500.000 $8,500.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 850.000 $5.000 $5.420 $3.600 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 850.000 $2.000 $3.000 $1.200 $1.100
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 140.000 $6.000 $13.900 $12.000 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 140.000 $2.000 $7.350 $2.400 $5.000
DRIVEWAYS (ACP)
SY 882.000 $60.000 $59.850 $50.695 $60.000
RUMBLE STRIPS (SHOULDER)
LF 12,200.000 $0.250 $0.290 $0.176 $1.200
RUMBLE STRIPS (CENTERLINE)
LF 6,100.000 $0.250 $0.290 $0.176 $1.400
GROUND BOX TY BATTERY (162915)W/APRON
EA 4.000 $2,500.000 $4,600.000 $4,400.000 $2,800.000
ALUMINUM SIGNS (TY A)
SF 45.000 $50.000 $57.500 $55.000 $42.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 6.000 $750.000 $968.300 $926.200 $1,400.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 17.000 $1,000.000 $702.650 $672.100 $1,305.000
REMOVE SM RD SN SUP&AM
EA 18.000 $150.000 $121.610 $110.000 $750.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 613.000 $2.000 $5.480 $1.100 $1.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 12,040.000 $0.500 $0.630 $0.715 $2.000
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 3,480.000 $0.400 $0.630 $0.825 $3.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 7,445.000 $0.500 $0.630 $0.770 $2.000
REFL PAV MRKR TY II-A-A
EA 160.000 $5.000 $8.050 $11.000 $10.000
VEH SIG SEC (12")LED(YEL)
EA 8.000 $250.000 $862.500 $825.000 $300.000
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 4.000 $8,000.000 $13,225.000 $12,650.000 $6,853.520
SP MIXES SP-C PG64-22 (LEVEL-UP)
TON 1,549.000 $150.000 $152.000 $145.043 $125.000
SP MIXES SP-D SAC-B PG70-22
TON 1,672.000 $150.000 $165.000 $152.253 $220.000
TACK COAT
GAL 2,677.000 $5.000 $6.580 $3.205 $8.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,000.000 $4,569.450 $22,000.000 $9,450.000
TMA (STATIONARY)
DAY 22.000 $200.000 $386.080 $300.000 $270.000
TMA (MOBILE OPERATION)
DAY 2.000 $250.000 $934.910 $1,800.110 $300.000
LEAD LED CHEVRON
EA 4.000 $3,000.000 $5,055.400 $4,835.600 $6,595.000
LED CHEVRON
EA 30.000 $2,000.000 $2,047.000 $1,958.000 $3,585.000
Totals: $857,084.900 $995,017.150 $1,046,609.218 $1,073,012.080