Show Job Controls
Bid Cobra

HOWARD VA (0908-12-027)

Items: 36

County: HOWARD
Length: N/A
Highway: VA
District: ABILENE
Control Number: 0908-12-027
DBE Goal: N/A
Project: C 908-12-27
Guaranty: N/A
Time: 37 WORKING DAYS
Engineer's Estimate: $361,731.00
Date: 05/05/2023 (3 years ago)
Contract Number: N/A
Type: STATE PARK IMPROVEMENTS
Mail/Deliver Bids To: N/A
RYAN SAYLES
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$361,731.00
Over/Under Est: 17.24% $62,378.00
Over/Under Est: 53.7% $194,263.00
Amt Left: 31.1% $131,885.00

Bid Items & Bid Tabulations

36 Total 0 of 36
HOWARD  |  VA  |  ABILENE  |  0908-12-027  |  05/05/2023  |  $361,731.00  |  C 908-12-27  |  STATE PARK IMPRVS  |  37 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BONTKE BROTHERS CONSTRUCTION COMPANY
PATHFIELD INVESTMENTS LLC
PREPARING ROW
STA 5.500 $5,000.000 $250.000 $5,000.000
EXCAVATION (ROADWAY)
CY 1,802.000 $40.000 $33.000 $70.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 681.000 $30.000 $35.000 $90.000
FURNISHING AND PLACING TOPSOIL (4")
SY 3,684.000 $8.000 $18.000 $10.000
CELL FBR MLCH SEED(PERM)(SPECIAL MIX)
SY 3,684.000 $5.000 $6.000 $9.000
VEGETATIVE WATERING
MG 32.000 $55.000 $550.000 $150.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 3,684.000 $2.000 $6.500 $3.500
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 261.000 $95.000 $105.000 $100.000
PRIME COAT (MC-30)
GAL 330.000 $15.000 $12.500 $44.000
ASPH (AC-20-5TR)
GAL 948.000 $12.000 $12.500 $20.000
AGGR(TY-B GR-4 SAC-B)
CY 22.000 $700.000 $250.000 $355.000
RIPRAP (CONC)(6 IN)
CY 49.000 $700.000 $550.000 $250.000
RC PIPE (CL V)(24 IN)
LF 28.000 $200.000 $185.000 $54.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $3,000.000 $4,500.000 $2,000.000
MOBILIZATION
LS 1.000 $27,677.000 $50,000.000 $30,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $8,000.000 $10,000.000 $12,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 25.000 $75.000 $8.000 $45.000
ROCK FILTER DAMS (REMOVE)
LF 25.000 $25.000 $5.000 $15.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 380.000 $8.000 $3.000 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 380.000 $2.000 $3.000 $5.000
GATE (SPECIAL)
EA 1.000 $500.000 $6,500.000 $8,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 5.000 $2,500.000 $800.000 $6.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 1.000 $2,500.000 $800.000 $6.000
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
EA 2.000 $50.000 $1,500.000 $40.000
PAVEMENT SEALER 4"
LF 130.000 $1.100 $4.000 $40.000
PAVEMENT SEALER (WORD)
EA 2.000 $65.000 $1,500.000 $28.000
PAVEMENT SEALER (SYMBOL)
EA 1.000 $75.000 $1,500.000 $50.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 646.000 $1.250 $6.000 $110.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 1.000 $800.000 $1,500.000 $110.000
PREFAB PAV MRK TY C (W) (WORD)
EA 3.000 $800.000 $1,500.000 $110.000
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
EA 8.000 $60.000 $15.000 $150.000
PRE PM TY C(ACC PRK)(BL&WH)(W/BORDR)SM
EA 1.000 $500.000 $2,000.000 $25.000
PAV SURF PREP FOR MRK (4")
LF 130.000 $1.250 $8.000 $4.000
PAV SURF PREP FOR MRK (WORD)
EA 2.000 $65.000 $500.000 $35.000
PAV SURF PREP FOR MRK (SYMBOL)
EA 1.000 $75.000 $500.000 $45.000
WHEEL STOPS
EA 20.000 $150.000 $150.000 $235.000
Totals: $361,731.000 $424,109.000 $555,994.000