HOWARD SH 350 (0693-01-036)

Items: 59

County: HOWARD
Length: N/A
Highway: SH 350
District: ABILENE
Control Number: 0693-01-036
DBE Goal: N/A
Project: STP 2020(030)
Guaranty: N/A
Time: 354 WORKING DAYS
Engineer's Estimate: $11,862,181.66
Date: 12/04/2019 (6 years ago)
Contract Number: N/A
Type: RER-REHABILITATION OF EXISTING ROAD
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$11,862,181.66
1
$13,149,840.01
Over/Under Est: 10.86% $1,287,658.35
Over/Under Est: 23.56% $2,794,636.59
Amt Left: 11.46% $1,506,978.24

Bid Items & Bid Tabulations

59 Total 0 of 59
HOWARD  |  SH 350  |  ABILENE  |  0693-01-036  |  12/04/2019  |  $11,862,181.66  |  STP 2020(030)  |  RER-REHAB OF EXIST ROAD  |  354 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RK HALL, LLC
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
REMOVING CONC (RIPRAP)
SY 79.000 $22.500 $98.510 $7.000
REMOVING STAB BASE AND ASPH PAV (6")
SY 145,556.000 $2.800 $3.860 $3.500
REMOVE STAB BASE AND ASPH PAV (2"-3")
SY 75,233.000 $2.950 $2.350 $3.000
EXCAVATION (ROADWAY)
CY 21,943.000 $8.550 $7.030 $10.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 32.000 $14.500 $217.110 $15.000
BACKFILL (TY B)
STA 464.750 $144.700 $370.530 $175.000
BLADING
HR 50.000 $110.000 $160.100 $250.000
BLOCK SODDING
SY 77.000 $4.150 $110.000 $3.000
PROOF ROLLING
HR 50.000 $75.000 $138.930 $150.000
CEMENT
TON 3,421.000 $149.000 $195.650 $140.000
CEMENT TREAT (EXIST MATL)(DC)(8")
SY 219,320.000 $3.000 $2.400 $3.500
PRIME COAT (MC-30)
GAL 65,796.000 $4.250 $4.210 $4.000
ASPH (MULTI OPTION)
GAL 100,887.000 $3.500 $3.570 $7.000
AGGR(TY-PB GR-4 SAC-B)
CY 1,907.000 $155.000 $156.650 $85.000
SUPERPAVE MIXTURES SP-B PG64-22
TON 48,250.000 $82.000 $99.510 $115.000
SUPERPAVE MIXTURES SP-D PG76-28
TON 24,125.000 $110.100 $110.780 $123.000
TACK COAT
GAL 258.000 $5.000 $8.280 $3.000
TEMPORARY SPL SHORING
SF 279.000 $30.000 $88.000 $50.000
RIPRAP (CONC)(5 IN)
CY 25.000 $475.000 $660.000 $475.000
RIPRAP (CONC)(6 IN)
CY 12.000 $425.000 $1,229.750 $535.000
RIPRAP (MOW STRIP)(4 IN)
CY 288.000 $540.000 $715.000 $625.000
RAIL (TY T631)
LF 620.000 $75.000 $103.400 $55.000
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 32.000 $505.000 $825.000 $600.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
EA 2.000 $5,000.000 $16,500.000 $7,500.000
REMOV STR (HEADWALL)
EA 2.000 $230.000 $1,650.000 $1,000.000
REMOVE STR (RAIL)
LF 620.000 $15.000 $27.500 $25.000
MOBILIZATION
LS 1.000 $988,738.000 $662,362.650 $1,400,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 22.000 $8,100.000 $17,411.950 $7,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 2,745.000 $37.000 $53.220 $28.000
ROCK FILTER DAMS (REMOVE)
LF 2,745.000 $12.000 $10.930 $8.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 21,642.000 $2.600 $2.640 $2.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 21,642.000 $0.650 $0.660 $1.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 5,450.000 $11.350 $5.500 $7.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 5,450.000 $1.300 $0.990 $1.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 22.000 $4,250.000 $4,316.470 $5,500.000
CONC CURB & GUTTER (TY I)
LF 73.000 $25.000 $49.500 $22.000
DRIVEWAYS (SURF TREAT)
SY 3,499.000 $14.000 $61.090 $12.000
MTL W-BEAM GD FEN (TIM POST)
LF 5,625.000 $24.500 $24.750 $25.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 18.000 $1,140.000 $1,320.000 $1,100.000
REMOVE METAL BEAM GUARD FENCE
LF 4,872.000 $3.300 $1.930 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 18.000 $340.000 $330.000 $200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 18.000 $3,260.000 $3,190.000 $2,700.000
GUARDRAIL END TREATMENT (REMOVE)
EA 18.000 $329.500 $220.000 $270.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 11.000 $425.000 $770.000 $460.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 35.000 $1,015.000 $858.000 $585.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 3.000 $1,200.000 $1,012.000 $660.000
REMOVE SM RD SN SUP&AM
EA 14.000 $49.000 $99.000 $85.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 20.000 $71.500 $55.000 $65.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 95.000 $52.630 $33.000 $25.000
REFL PAV MRK TY II (W) 24" (SLD)
LF 332.000 $3.750 $3.300 $2.750
REFL PAV MRKR TY II-A-A
EA 1,122.000 $4.250 $4.400 $3.000
ELIM EXT PAV MRK & MRKS (4")
LF 1,460.000 $0.900 $0.500 $0.350
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $15,000.000 $16,964.900 $6,000.000
RE PM W/RET REQ TY II (W)4"(BRK)
LF 1,072.000 $0.210 $0.120 $0.750
RE PM W/RET REQ TY II (W)4"(SLD)
LF 90,327.000 $0.210 $0.120 $1.000
RE PM W/RET REQ TY II (Y)4"(BRK)
LF 5,560.000 $0.150 $0.120 $1.000
RE PM W/RET REQ TY II (Y)4"(SLD)
LF 60,608.000 $0.280 $0.120 $1.000
TMA (STATIONARY)
DAY 14.000 $215.000 $383.930 $200.000
TMA (MOBILE OPERATION)
DAY 14.000 $310.000 $496.270 $200.000
Totals: $11,862,181.655 $13,149,840.018 $14,656,818.250