Show Job Controls
Bid Cobra

HOWARD FM 700 (0668-02-020)

Items: 48

County: HOWARD
Length: N/A
Highway: FM 700
District: ABILENE
Control Number: 0668-02-020
DBE Goal: N/A
Project: NH 2020(619)
Guaranty: N/A
Time: 110 WORKING DAYS
Engineer's Estimate: $3,538,755.22
Date: 03/04/2020 (6 years ago)
Contract Number: N/A
Type: MILL, SPOT REPAIR AND OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$3,538,755.22
1
$4,167,074.00
Over/Under Est: 17.76% $628,318.78
Over/Under Est: 30.65% $1,084,537.83
Amt Left: 10.95% $456,219.05

Bid Items & Bid Tabulations

48 Total 0 of 48
HOWARD  |  FM 700  |  ABILENE  |  0668-02-020  |  03/04/2020  |  $3,538,755.22  |  NH 2020(619)  |  MILL, SPOT REPAIR AND OVERLAY  |  110 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RK HALL, LLC
TIERRA LEASE SERVICE, LLC
REMOVING CONC (MISC)
SY 93.000 $25.000 $569.340 $110.000
PROOF ROLLING
HR 72.000 $91.560 $153.510 $140.000
PRIME COAT (AE-P)
GAL 6,814.000 $4.000 $8.620 $6.000
ASPH (MULTI OPTION)
GAL 37,891.000 $3.750 $4.220 $4.500
AGGR(TY-PB GR-4 SAC-B)
CY 752.000 $115.000 $227.990 $300.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 9,171.000 $50.000 $82.340 $80.000
PLANE ASPH CONC PAV (2")
SY 105,254.000 $1.300 $1.690 $3.000
MOBILIZATION
LS 1.000 $321,705.000 $339,946.140 $300,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $6,000.000 $16,000.000 $5,000.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,388.000 $5.000 $7.510 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,388.000 $1.500 $2.990 $5.000
INTRSCT, DRVWAYS, & TURNOUT (ACP)
SY 13,541.000 $36.000 $28.230 $40.000
MTL W-BEAM GD FEN (TIM POST)
LF 5,454.000 $25.000 $28.750 $28.000
MTL W-BEAM GD FEN (STEEL POST)
LF 69.000 $37.500 $97.750 $45.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,200.000 $4,490.550 $3,000.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 6.000 $1,150.000 $1,840.000 $1,800.000
REMOVE METAL BEAM GUARD FENCE
LF 5,523.000 $3.250 $2.300 $10.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 6.000 $450.000 $230.000 $750.000
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $3,250.000 $3,565.000 $3,600.000
GUARDRAIL END TREATMENT (REMOVE)
EA 6.000 $330.000 $230.000 $750.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 12.000 $420.000 $845.250 $1,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 29.000 $630.000 $920.000 $1,100.000
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
EA 1.000 $1,050.000 $1,730.750 $1,000.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 3.000 $800.000 $1,230.500 $1,200.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 4.000 $1,000.000 $1,270.750 $1,500.000
REMOVE SM RD SN SUP&AM
EA 47.000 $50.000 $163.970 $200.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 192.000 $20.000 $50.170 $25.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 61.000 $50.000 $46.000 $20.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,553.000 $0.750 $1.080 $1.250
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 5,085.000 $0.470 $0.550 $0.580
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 22,250.000 $0.500 $0.550 $0.580
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 3,000.000 $0.400 $0.550 $0.580
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 21,455.000 $0.400 $0.550 $0.580
PREFAB PAV MRK TY B (W)(24")(SLD)
LF 726.000 $25.000 $46.000 $50.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 19.000 $200.000 $299.000 $300.000
PREFAB PAV MRK TY C (W) (WORD)
EA 10.000 $250.000 $425.500 $450.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 28.000 $30.000 $40.250 $45.000
REFL PAV MRKR TY I-C
EA 451.000 $3.000 $4.030 $4.200
REFL PAV MRKR TY II-A-A
EA 482.000 $2.750 $4.030 $4.200
TRAFFIC BUTTON TY W
EA 8,485.000 $3.000 $2.590 $2.750
TRAFFIC BUTTON TY Y
EA 8,225.000 $2.000 $2.590 $2.750
ELIM EXT PAV MRK & MRKS (4")
LF 19,360.000 $0.500 $1.970 $2.000
SP MIXES SP-D SAC-B PG76-22
TON 10,088.000 $140.000 $130.000 $150.000
TACK COAT
GAL 1,185.000 $10.000 $12.320 $4.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $18,745.030 $25,000.000
LONG CHANNEL MOUNT CURB SYS (INSTALL)
LF 575.000 $5.000 $86.250 $100.000
TMA (STATIONARY)
DAY 47.000 $250.000 $424.220 $600.000
TMA (MOBILE OPERATION)
DAY 90.000 $250.000 $548.340 $750.000
Totals: $3,538,755.220 $4,167,074.000 $4,623,293.050