HOWARD SH 176 (0548-04-025)

Items: 64

County: HOWARD
Length: N/A
Highway: SH 176
District: ABILENE
Control Number: 0548-04-025
DBE Goal: 550.0%
Project: BR 2B24(204)
Guaranty: N/A
Time: 235 WORKING DAYS
Engineer's Estimate: $2,614,459.80
Date: 06/06/2024 (2 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
RYAN SAYLES
LARISSA HALFORD
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$2,614,459.80
$2,389,847.63
Over/Under Est: -8.59% -$224,612.17
Over/Under Est: -2% -$52,277.80
Amt Left: 7.21% $172,334.37
$2,578,954.35
Over/Under Est: -1.36% -$35,505.45
Amt Left: 7.91% $189,106.72
Delta: -0.65% -$16,772.35
Over/Under Est: 19.77% $516,905.57
Amt Left: 31.03% $741,517.74
Delta: -21.42% -$552,411.02
$4,637,808.36
Over/Under Est: 77.39% $2,023,348.56
Amt Left: 94.06% $2,247,960.73
Delta: -48.11% -$1,506,442.99
Subcontractor Percentage Amount
TUCAN CONTRACTING, LLC 22.18% $562,042.65
GREGORY PILE DRIVING, INC. 9.44% $239,210.22
HJC FARMS, INC. 6.34% $160,656.01
ACE'S WELDING & FABRICATION LLC 4.96% $125,686.72
FC TRAFFIC CONTROL, INC. 2.28% $57,775.35
TORO BRAVO CONSTRUCTION, LLC 2.24% $56,761.75
DAVIS MOTOR CRANE SERVICE, INC. 1.85% $46,879.12
TEXOP CONSTRUCTION 0.89% $22,552.66
TRP CONSTRUCTION GROUP, LLC 0.86% $21,792.46
PROFESSIONAL TRAFFIC CONTROL LLC 0.44% $11,149.63
Total: 51.48% $1,304,506.57

Bid Items & Bid Tabulations

64 Total 0 of 64
HOWARD  |  SH 176  |  ABILENE  |  0548-04-025  |  06/06/2024  |  $2,614,459.80  |  BR 2B24(204)  |  BRIDGE REPL  |  235 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TALBERT COMPANIES LLC
DELGADO'S CONTRACTORS, LLC
SKYLINE BRIDGE LLC
PROJECT ALLIED RESOURCES, LLC
GILVIN-TERRILL, LTD.
REMOVING CONC (PAV)
SY 874.000 $30.000 $23.050 $20.000 $30.000 $15.000 $20.000
REMOVING STAB BASE & ASPH PAV(14")
SY 393.000 $20.000 $21.900 $20.000 $35.000 $67.000 $70.000
EXCAVATION (CHANNEL)
CY 5,504.000 $30.000 $38.330 $40.000 $15.000 $22.900 $26.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 64.000 $30.000 $61.520 $80.000 $150.000 $135.000 $250.000
BROADCAST SEED (TEMP) (WARM)
SY 1,912.000 $1.250 $2.040 $1.000 $1.750 $1.250 $1.250
BROADCAST SEED (TEMP) (COOL)
SY 1,912.000 $1.250 $2.040 $1.000 $1.750 $1.260 $1.250
STRAW/HAY MLCH SEED(PERM)(RURAL)(SANDY)
SY 3,824.000 $1.250 $0.510 $1.000 $1.750 $3.060 $1.250
VEGETATIVE WATERING
MG 64.000 $50.000 $166.640 $150.000 $1.000 $86.000 $50.000
PLANE ASPH CONC PAV(0" TO 2")
SY 367.000 $30.000 $43.800 $12.000 $65.000 $60.000 $75.000
CEM STABIL BKFL
CY 105.000 $350.000 $356.630 $300.000 $350.000 $529.000 $500.000
TEMPORARY SPL SHORING
SF 600.000 $30.000 $74.820 $45.000 $40.000 $102.000 $150.000
DRILL SHAFT (36 IN)
LF 1,175.000 $300.000 $213.530 $375.000 $375.000 $335.000 $500.000
CL C CONC (ABUT)
CY 53.000 $1,600.000 $1,368.750 $1,500.000 $1,600.000 $2,600.000 $2,600.000
CL C CONC (CAP)
CY 36.000 $1,600.000 $1,478.250 $1,500.000 $2,000.000 $3,390.000 $2,600.000
CL C CONC (COLUMN)
CY 11.000 $1,600.000 $1,478.250 $1,500.000 $2,200.000 $3,110.000 $2,600.000
REINF CONC SLAB
SF 9,660.000 $16.000 $27.380 $35.000 $35.000 $41.500 $60.000
APPROACH SLAB
CY 37.000 $525.000 $1,478.250 $1,000.000 $1,100.000 $2,300.000 $3,000.000
PRESTR CONC GIRDER (TX28)
LF 1,251.000 $175.000 $177.180 $250.000 $250.000 $297.000 $300.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 302.000 $300.000 $372.300 $275.000 $225.000 $395.000 $500.000
RIPRAP (MOW STRIP)(4 IN)
CY 27.000 $600.000 $678.900 $750.000 $825.050 $1,670.000 $1,150.000
RAIL (TY SSTR)
LF 468.000 $900.000 $168.730 $200.000 $175.000 $154.000 $200.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 92.000 $120.000 $175.000 $250.000 $300.000 $408.000 $375.000
CLEAN EXIST CULVERTS
EA 4.000 $3,000.000 $2,737.500 $3,000.000 $2,000.000 $3,450.000 $4,500.000
REMOV STR (WINGWALL)
EA 2.000 $1,200.000 $2,299.500 $2,500.000 $2,750.000 $12,700.000 $40,000.000
REMOV STR (PIPE)
LF 100.000 $15.000 $43.800 $25.000 $50.000 $167.000 $82.000
REMOV STR (BOX CULVERT)
LF 1,006.000 $100.000 $43.800 $40.000 $50.000 $34.100 $450.000
REMOVE STR (RAIL)
LF 342.000 $60.000 $43.800 $25.000 $10.000 $56.000 $50.000
MOBILIZATION
LS 1.000 $225,253.000 $230,500.000 $190,000.000 $225,000.000 $341,000.000 $450,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $10,000.000 $12,592.500 $2,500.000 $2,800.000 $7,490.000 $37,500.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,330.000 $6.000 $7.670 $7.000 $6.000 $9.300 $3.750
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,330.000 $30.000 $2.190 $1.000 $4.000 $2.640 $1.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 14.000 $9,000.000 $4,927.500 $8,000.000 $9,000.000 $1,050.000 $6,000.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 380.000 $36.000 $43.800 $120.000 $50.000 $86.000 $125.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 360.000 $24.000 $32.850 $20.000 $75.000 $77.000 $30.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 380.000 $28.000 $43.800 $20.000 $75.000 $86.000 $30.000
RUMBLE STRIPS (SHOULDER)
LF 1,182.000 $0.600 $5.220 $7.000 $7.000 $8.900 $10.000
RUMBLE STRIPS (CENTERLINE)
LF 591.000 $0.600 $10.440 $7.000 $5.000 $8.900 $10.000
MTL W-BEAM GD FEN (TIM POST)
LF 300.000 $32.000 $29.570 $32.000 $32.000 $60.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,500.000 $2,885.330 $2,400.000 $2,500.000 $3,690.000 $2,500.000
REMOVE METAL BEAM GUARD FENCE
LF 475.000 $4.000 $3.290 $3.000 $5.000 $4.200 $5.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $325.000 $328.500 $400.000 $500.000 $420.000 $400.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,600.000 $3,558.750 $4,000.000 $3,600.000 $4,990.000 $3,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $400.000 $328.500 $400.000 $1,000.000 $420.000 $400.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $3,000.000 $2,737.500 $2,000.000 $3,500.000 $1,970.000 $2,500.000
CRASH CUSH ATTEN (REMOVE)
EA 3.000 $1,500.000 $1,642.500 $1,500.000 $1,500.000 $1,720.000 $2,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 3.000 $10,000.000 $8,760.000 $15,000.000 $12,000.000 $15,800.000 $10,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $1,000.000 $1,040.250 $1,000.000 $1,500.000 $1,330.000 $1,250.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $43.000 $21.900 $40.000 $50.000 $28.000 $35.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 8.000 $100.000 $109.500 $100.000 $150.000 $140.000 $120.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 12.000 $75.000 $60.230 $2.000 $50.000 $77.000 $42.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 4,000.000 $1.500 $2.850 $3.000 $3.150 $3.640 $2.600
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 48.000 $20.000 $21.900 $22.000 $25.000 $28.000 $20.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 480.000 $1.500 $2.850 $3.000 $3.150 $3.640 $2.600
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 600.000 $2.000 $1.920 $5.000 $6.000 $7.000 $2.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 1,096.000 $2.500 $5.480 $6.000 $6.000 $7.000 $5.000
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 140.000 $2.500 $5.480 $6.000 $6.000 $7.000 $5.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 548.000 $2.500 $5.480 $6.000 $6.000 $7.000 $5.000
REFL PAV MRKR TY II-A-A
EA 6.000 $6.000 $54.750 $55.000 $150.000 $70.000 $50.000
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
LF 2,209.000 $1.000 $0.550 $5.000 $5.000 $0.590 $18.540
D-GR HMA TY-C PG76-22
TON 199.000 $250.000 $438.000 $350.000 $500.000 $498.000 $450.000
TACK COAT
GAL 72.000 $100.000 $38.330 $15.000 $40.000 $24.600 $25.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $20,865.250 $15,000.000 $15,000.000 $9,530.000 $20,000.000
TMA (STATIONARY)
DAY 16.000 $200.000 $219.000 $400.000 $250.000 $352.000 $950.000
TMA (MOBILE OPERATION)
DAY 3.000 $400.000 $558.320 $400.000 $500.000 $514.000 $950.000
Totals: $2,614,459.800 $2,389,847.630 $2,562,182.000 $2,578,954.350 $3,131,365.370 $4,637,808.360