Show Job Controls
Bid Cobra

HOWARD SH 176 (0548-04-021)

Items: 60

County: HOWARD
Length: N/A
Highway: SH 176
District: ABILENE
Control Number: 0548-04-021
DBE Goal: N/A
Project: STP 2020(361)
Guaranty: N/A
Time: 180 WORKING DAYS
Engineer's Estimate: $9,833,252.75
Date: 12/04/2019 (6 years ago)
Contract Number: N/A
Type: RESTORATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$9,833,252.75
1
$9,975,871.00
Over/Under Est: 1.45% $142,618.25
Over/Under Est: 6.62% $650,591.69
Amt Left: 5.09% $507,973.44

Bid Items & Bid Tabulations

60 Total 0 of 60
HOWARD  |  SH 176  |  ABILENE  |  0548-04-021  |  12/04/2019  |  $9,833,252.75  |  STP 2020(361)  |  RESTOR  |  180 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RK HALL, LLC
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
REMOVING CONC (CURB AND GUTTER)
LF 345.000 $10.000 $23.380 $4.000
BACKFILL (TY B)
STA 272.610 $135.000 $381.210 $250.000
CEMENT
TON 1,030.000 $160.000 $203.190 $145.000
CEMENT TREAT (EXIST MATL) (6")
SY 74,950.000 $3.000 $2.000 $3.000
PRIME COAT (AE-P)
GAL 14,991.000 $6.000 $5.130 $3.000
ASPH (AC-20-5TR)
GAL 48,532.000 $6.000 $3.750 $7.500
AGGR(TY-PB GR-4 SAC-B)
CY 1,173.000 $100.000 $211.020 $95.000
SUPERPAVE MIXTURES SP-B PG64-22
TON 24,734.000 $120.000 $112.670 $128.000
TACK COAT
GAL 22,846.000 $3.000 $4.090 $3.500
STONE-MTRX-ASPH SMAR-F SAC-A
TON 15,177.000 $130.000 $164.500 $175.000
TOM (ASPHALT) PG 76-22
TON 372.000 $800.000 $779.360 $700.000
TOM-C (AGGREGATE) SAC-A
TON 4,726.000 $100.000 $100.340 $125.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 2,696.000 $50.000 $65.330 $30.000
PLANE ASPH CONC PAV(0" TO 2")
SY 253.000 $7.000 $74.380 $2.000
PLANE ASPH CONC PAV (6")
SY 74,950.000 $5.000 $4.190 $6.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 24.000 $250.000 $385.000 $250.000
RIPRAP (CONC) (CL B) (4")
CY 1.100 $550.000 $10,360.570 $729.000
RIPRAP (MOW STRIP)(4 IN)
CY 56.000 $520.000 $770.000 $475.000
MOBILIZATION
LS 1.000 $900,000.000 $534,297.010 $1,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $18,000.000 $31,734.520 $7,500.000
CONC CURB & GUTTER (TY II)
LF 323.000 $30.000 $82.500 $22.000
RUMBLE STRIPS (SHOULDER)
LF 112,600.000 $0.150 $0.170 $0.200
RUMBLE STRIPS (CENTERLINE)
LF 55,972.000 $0.150 $0.250 $0.200
MTL W-BEAM GD FEN (TIM POST)
LF 1,500.000 $30.000 $26.400 $20.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $2,500.000 $2,750.000 $1,750.000
REMOVE METAL BEAM GUARD FENCE
LF 1,500.000 $8.000 $2.750 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 6.000 $420.000 $440.000 $200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $3,600.000 $3,630.000 $2,700.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $400.000 $550.000 $275.000
REPLACE LUMINAIRE W/LED (250W EQ)
EA 2.000 $1,000.000 $1,100.000 $600.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 3.000 $4,000.000 $6,600.000 $3,650.000
CONDT (PVC) (SCH 40) (2")
LF 626.000 $10.000 $5.500 $9.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 64.000 $30.000 $33.000 $25.000
ELEC CONDR (NO.8) INSULATED
LF 2,130.000 $2.000 $1.650 $1.250
GROUND BOX TY A (122311)W/APRON
EA 2.000 $1,000.000 $1,485.000 $900.000
ALUMINUM SIGNS (TY A)
SF 297.000 $35.000 $75.900 $25.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 20.000 $750.000 $1,128.600 $450.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 18.000 $850.000 $1,324.400 $585.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T-EXAL)
EA 1.000 $1,050.000 $1,518.000 $750.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $1,000.000 $1,521.300 $650.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 9.000 $220.000 $99.000 $65.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 15.000 $30.000 $38.500 $30.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 24,624.000 $5.000 $4.680 $4.000
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 85,596.000 $4.500 $4.680 $4.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 204,240.000 $0.500 $0.940 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 80.000 $1.200 $4.400 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 106.000 $15.000 $23.100 $6.500
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 5.000 $40.000 $55.000 $45.000
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
EA 4.000 $300.000 $605.000 $50.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 112,600.000 $0.700 $0.530 $0.300
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 11,800.000 $0.400 $0.530 $0.350
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 46,788.000 $0.700 $0.530 $0.350
REFL PAV MRKR TY II-A-A
EA 1,165.000 $3.600 $4.130 $3.000
REFL PAV MRKR TY II-C-R
EA 6.000 $3.000 $22.000 $3.500
ELIM EXT PAV MRK & MRKS (4")
LF 409,256.000 $1.000 $0.520 $0.300
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 1.000 $8,900.000 $14,300.000 $6,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $13,800.000 $2,994.030 $6,000.000
TMA (STATIONARY)
DAY 374.000 $240.000 $397.940 $250.000
TMA (MOBILE OPERATION)
DAY 28.000 $350.000 $514.380 $250.000
TEMP SPEED MONITOR SYS
EA 2.000 $18,000.000 $11,881.050 $15,119.270
Totals: $9,833,252.750 $9,975,871.015 $10,483,844.440