HOWARD US 87 (0069-01-062)

Items: 38

County: HOWARD
Length: 0.0000 MILES
Highway: US 87
District: ABILENE
Control Number: 0069-01-062
DBE Goal: 0.0%
Project: C 69-1-62
Guaranty: $56,000.00
Time: 54 WORKING DAYS
Engineer's Estimate: $2,777,234.75
Date: 11/05/2025 (7 months ago)
Contract Number: 11253017
Type: RESURFACE ROADWAY
Project ID: A00187119
Project Description: OVERLAY
Mail/Deliver Bids To: N/A
RYAN SAYLES
LARISSA HALFORD
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$2,777,234.75
1
$2,026,248.11
Over/Under Est: -27.04% -$750,986.64
$2,471,783.60
Over/Under Est: -11% -$305,451.15
Amt Left: 21.99% $445,535.49
$2,481,424.38
Over/Under Est: -10.65% -$295,810.37
Amt Left: 22.46% $455,176.27
Delta: -0.39% -$9,640.78
Over/Under Est: 10.26% $284,830.67
Amt Left: 51.12% $1,035,817.31
Delta: -23.40% -$580,641.04
Over/Under Est: 22.87% $635,253.75
Amt Left: 68.41% $1,386,240.39
Delta: -11.44% -$350,423.08
Subcontractor Percentage Amount
DOUBLE A CONTRACTING, L.P. 2.69% $54,506.07
HJC FARMS, INC. 2.46% $49,845.70
HOGAN MURRAY, INC. 2.41% $48,832.58
DUSTROL, INC. 1.09% $22,086.10
CONTRACTORS SERVICE, LTD. 0.69% $13,981.11
WEST TEXAS RUMBLE STRIP LLC 0.45% $9,118.12
Total: 9.79% $198,369.68

Bid Items & Bid Tabulations

38 Total 0 of 38
HOWARD  |  US 87  |  ABILENE  |  0069-01-062  |  11/05/2025  |  $2,777,234.75  |  C 69-1-62  |  RESURF ROADWAY  |  54 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RK HALL, LLC
CK NEWBERRY, LLC
REECE ALBERT, INC.
RAGLE CONSTRUCTION, INC.
BONTKE BROTHERS CONSTRUCTION COMPANY
BACKFILL (TY A)
STA 273.130 $250.000 $236.610 $250.000 $365.930 $414.000 $500.000
SP MIXES SP-C SAC-B PG70-22
TON 13,490.000 $145.000 $103.100 $125.000 $138.190 $153.500 $158.000
TACK COAT
GAL 17,303.000 $4.000 $3.100 $4.000 $2.200 $6.000 $12.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 2,750.000 $50.000 $46.320 $50.000 $61.210 $72.000 $115.000
PLANE ASPH CONC PAV(0" TO 2")
SY 1,823.000 $6.000 $10.140 $7.000 $9.440 $8.000 $25.000
RETROFIT RAIL (ADD HSS)
LF 64.500 $200.000 $243.850 $230.000 $237.600 $153.100 $350.000
MOBILIZATION
LS 1.000 $247,021.000 $126,959.460 $205,000.000 $97,794.660 $310,000.000 $250,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $20,000.000 $15,000.000 $20,000.000 $4,176.970 $24,000.000 $10,000.000
TMA (STATIONARY)
DAY 45.000 $300.000 $287.640 $350.000 $37.750 $346.000 $250.000
TMA (MOBILE OPERATION)
DAY 24.000 $350.000 $328.350 $750.000 $385.810 $675.000 $500.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 38,058.000 $0.250 $0.250 $0.200 $0.280 $0.070 $1.000
MTL W-BEAM GD FEN (TIM POST)
LF 375.000 $30.000 $30.060 $30.000 $29.290 $52.500 $40.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,500.000 $2,608.660 $2,500.000 $2,541.810 $1,600.000 $2,600.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,800.000 $1,531.170 $1,500.000 $1,491.940 $1,300.000 $1,550.000
MTL BM GD FEN TRANS (NON - SYM)
EA 2.000 $1,200.000 $1,190.910 $1,200.000 $1,160.390 $875.000 $1,200.000
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 4.000 $1,000.000 $907.360 $875.000 $884.110 $850.000 $1,050.000
REMOVE METAL BEAM GUARD FENCE
LF 400.000 $3.500 $2.270 $2.200 $2.210 $2.500 $5.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $270.000 $226.840 $215.000 $221.030 $200.000 $300.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 2.000 $350.000 $226.840 $215.000 $1,654.040 $150.000 $300.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,750.000 $3,856.280 $4,000.000 $3,757.460 $4,259.000 $3,800.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $350.000 $340.260 $350.000 $331.540 $200.000 $500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 26.000 $800.000 $715.500 $750.000 $738.230 $668.000 $1,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 14.000 $1,000.000 $879.800 $900.000 $972.520 $880.000 $1,500.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 13.000 $1,100.000 $1,060.000 $1,000.000 $1,232.230 $1,115.000 $1,500.000
REMOVE SM RD SN SUP&AM
EA 39.000 $125.000 $106.000 $105.000 $119.430 $100.000 $250.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
EA 9.000 $50.000 $56.710 $45.000 $55.260 $45.000 $200.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 8.000 $60.000 $74.200 $75.000 $59.680 $54.000 $200.000
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
EA 32.000 $70.000 $74.200 $75.000 $66.310 $60.000 $200.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 4,444.000 $2.000 $1.690 $0.500 $1.970 $1.000 $1.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 1,548.000 $1.250 $1.590 $1.000 $0.970 $0.880 $2.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 3,295.000 $1.250 $1.270 $1.000 $0.950 $0.860 $2.000
ALL-WTHER PM TY I (W)6"(SLD)(100MIL)
LF 26,812.000 $1.000 $0.690 $0.750 $0.590 $0.530 $1.000
ALL-WTHER PM TY I (W)6"(BRK)(100MIL)
LF 6,830.000 $1.000 $0.800 $0.800 $0.600 $0.540 $1.000
ALL-WTHER PM TY I (Y)6"(SLD)(100MIL)
LF 26,378.000 $1.000 $0.740 $0.750 $0.590 $0.530 $1.000
PREFAB PM TY C (W)(ARROW)
EA 1.000 $400.000 $477.000 $405.000 $221.030 $200.000 $1,000.000
PREFAB PM TY C (W)(WORD)
EA 1.000 $400.000 $530.000 $475.000 $274.070 $248.000 $1,000.000
REFL PAV MRKR TY II-C-R
EA 325.000 $6.000 $4.510 $8.000 $4.140 $3.750 $5.500
RECESSED REFL PAV MRKR TY II-C-R
EA 342.000 $35.000 $14.840 $95.000 $4.140 $3.750 $16.000
Totals: $2,777,234.750 $2,026,248.104 $2,471,783.600 $2,481,424.381 $3,062,065.420 $3,412,488.500