HOWARD IH 20 (0005-06-126)

Items: 45

County: HOWARD
Length: N/A
Highway: IH 20
District: ABILENE
Control Number: 0005-06-126
DBE Goal: 0.0%
Project: C 5-6-126
Guaranty: N/A
Time: 108 WORKING DAYS
Engineer's Estimate: $6,427,323.40
Date: 05/03/2024 (2 years ago)
Contract Number: N/A
Type: PREVENTIVE MAINTENANCE
Mail/Deliver Bids To: N/A
RYAN SAYLES
LARISSA HALFORD
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$6,427,323.40
1
$7,152,987.39
Over/Under Est: 11.29% $725,663.99
Subcontractor Percentage Amount
HJC FARMS, INC. 9.36% $669,519.62
INNOVATIVE ROADWAY SOLUTIONS, LLC 4.85% $346,919.89
FLAT LINE, INC. 2.27% $162,372.81
TEXOP CONSTRUCTION 1.74% $124,461.98
CONTRACTORS SERVICE, LTD. 0.51% $36,480.24
CHEROKEE SERVICES 0.34% $24,320.16
Total: 19.07% $1,364,074.70

Bid Items & Bid Tabulations

45 Total 0 of 45
HOWARD  |  IH 20  |  ABILENE  |  0005-06-126  |  05/03/2024  |  $6,427,323.40  |  C 5-6-126  |  PREVENT MAINT  |  108 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RK HALL, LLC
REMOVING CONCRETE(MOW STRIP)
LF 2,385.000 $9.000 $16.500
FOG SEAL (CSS-1H)
GAL 1,128.000 $24.000 $17.490
PLANE ASPH CONC PAV (1.5")
SY 226,145.000 $2.250 $3.380
RIPRAP (MOW STRIP)(4 IN)
CY 151.000 $700.000 $770.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 560.000 $52.000 $48.400
HEADER TYPE EXPANSION JOINT
CF 69.000 $760.000 $891.000
JOINT SEALANT
LF 400.000 $27.000 $19.800
MOBILIZATION
LS 1.000 $576,726.000 $672,315.920
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $14,000.000 $36,589.620
MTL W-BEAM GD FEN (TIM POST)
LF 100.000 $35.000 $28.050
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 13.000 $2,500.000 $3,820.230
MTL W-BEAM GD FEN ADJUSTMENT
LF 19,050.000 $10.000 $14.300
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 18.000 $1,500.000 $3,745.570
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 50.000 $45.000 $30.250
MTL BM GD FEN TRANS (NON - SYM)
EA 7.000 $1,100.000 $1,265.000
REMOVE METAL BEAM GUARD FENCE
LF 100.000 $5.000 $65.280
REMOVE TERMINAL ANCHOR SECTION
EA 18.000 $500.000 $220.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 13.000 $220.000 $220.000
GUARDRAIL END TREATMENT (INSTALL)
EA 25.000 $4,000.000 $5,981.980
GUARDRAIL END TREATMENT (REMOVE)
EA 25.000 $300.000 $220.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 29.000 $75.000 $63.800
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 61.000 $75.000 $63.800
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 198.000 $35.000 $52.800
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 29.000 $35.000 $52.800
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 166.000 $110.000 $135.300
INSTL DEL ASSM (D-SY)SZ 1(YFLX)GND
EA 55.000 $110.000 $135.300
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
EA 169.000 $110.000 $135.300
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 8,006.000 $4.000 $4.420
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 2,439.000 $1.600 $1.210
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 4,636.000 $1.200 $1.210
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 4,809.000 $2.750 $2.200
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 21,200.000 $0.800 $0.720
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 86,025.000 $0.800 $0.720
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 88,206.000 $0.800 $0.720
REFL PAV MRK TY I (W)12"(DOT)(100MIL)
LF 921.000 $3.000 $2.200
PREFAB PAV MRK TY C (W) (ARROW)
EA 6.000 $300.000 $275.000
PREFAB PAV MRK TY C (W) (NUMBER)
EA 11.000 $400.000 $330.000
PREFAB PAV MRK TY C (W) (WORD)
EA 6.000 $400.000 $330.000
REFL PAV MRKR TY II-C-R
EA 2,297.000 $5.000 $4.680
FRICTIONAL ASPH SURF PRESERV TRTMT
SY 157,255.000 $3.000 $2.430
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 18,657.000 $195.000 $203.010
TACK COAT
GAL 22,847.000 $6.000 $5.230
PORTABLE CHANGEABLE MESSAGE SIGN
EA 1.000 $26,000.000 $25,920.000
TMA (STATIONARY)
DAY 98.000 $500.000 $220.000
TMA (MOBILE OPERATION)
DAY 24.000 $600.000 $1,309.000
Totals: $6,427,323.400 $7,152,987.390