HOWARD IH 20 (0005-05-114)

Items: 21

County: HOWARD
Length: N/A
Highway: IH 20
District: ABILENE
Control Number: 0005-05-114
DBE Goal: N/A
Project: STP 1902(336)HES
Guaranty: N/A
Time: 187 WORKING DAYS
Engineer's Estimate: $7,228,973.60
Date: 08/06/2019 (6 years ago)
Contract Number: N/A
Type: MEDIAN CABLE BARRIER
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$7,228,973.60
$5,297,532.08
Over/Under Est: -26.72% -$1,931,441.52
$6,823,314.20
Over/Under Est: -5.61% -$405,659.40
Amt Left: 28.8% $1,525,782.12
$6,982,787.40
Over/Under Est: -3.41% -$246,186.20
Amt Left: 31.81% $1,685,255.32
Delta: -2.34% -$159,473.20

Bid Items & Bid Tabulations

21 Total 0 of 21
HOWARD  |  IH 20  |  ABILENE  |  0005-05-114  |  08/06/2019  |  $7,228,973.60  |  STP 1902(336)HES  |  MEDIAN CABLE BARRIER  |  187 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GRATIOT CONSTRUCTION, LTD.
HJC FARMS, INC.
VANN/ELLI, INC.
REMOVING CONC (RIPRAP)
SY 1,288.000 $50.000 $30.000 $11.000 $35.000
REMOVING CONC (FLUME)
SY 9.000 $50.000 $100.000 $40.000 $100.000
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 364.000 $10.000 $30.000 $5.000 $12.000
EXCAVATION (SPECIAL)
CY 6,288.000 $30.000 $18.000 $11.000 $35.000
EMBANKMENT (ORIGINAL)(ORD COMP)(TY B)
CY 930.000 $15.000 $27.000 $23.000 $38.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 245,298.000 $1.000 $0.120 $0.150 $0.300
EMULS ASPH (EROSN CONT)(SS-1)
GAL 36,794.000 $10.000 $2.300 $5.250 $6.500
RIPRAP (CONC)(4 IN)
CY 140.100 $716.000 $530.000 $600.000 $550.000
RIPRAP (MOW STRIP)(4 IN)
CY 6,288.000 $460.000 $420.500 $600.000 $475.000
ADJUSTING INLETS
EA 28.000 $2,000.000 $1,300.000 $4,000.000 $2,500.000
MOBILIZATION
LS 1.000 $600,000.000 $640,000.000 $250,000.000 $700,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $12,500.000 $5,600.000 $5,000.000 $8,500.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 3,520.000 $7.000 $5.500 $8.000 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,520.000 $2.000 $0.750 $1.500 $1.250
TURNOUTS (RAP)
SY 1,920.000 $32.000 $21.000 $35.000 $50.000
CABLE BARRIER SYSTEM (TL-4)
LF 169,812.000 $12.000 $6.760 $10.000 $11.500
CABLE BARRIER TERMINAL SECTION (TL-4)
EA 66.000 $3,000.000 $2,300.000 $4,000.000 $2,200.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 17.000 $1,000.000 $1,500.000 $1,225.000 $1,068.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $20,000.000 $7,500.000 $4,000.000 $12,000.000
TMA (STATIONARY)
DAY 374.000 $250.000 $225.000 $250.000 $300.000
TMA (MOBILE OPERATION)
DAY 78.000 $500.000 $470.000 $250.000 $500.000
Totals: $7,228,973.600 $5,297,532.080 $6,823,314.200 $6,982,787.400