REMOVING CONC (RIPRAP)
|
CY
|
61.000
|
$175.000
|
$600.000
|
$300.000
|
$270.000
|
$380.230
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
17.000
|
$35.000
|
$60.000
|
$110.000
|
$90.000
|
$60.790
|
|
|
REMOVING CONC (CTB)
|
LF
|
50.000
|
$35.000
|
$25.000
|
$100.000
|
$120.000
|
$238.080
|
|
|
BACKFILL (TY A)
|
LF
|
5,962.000
|
$4.000
|
$10.000
|
$10.000
|
$13.000
|
$11.940
|
|
|
REWORK BS MTL (TY C) (10"-14")(OC)
|
SY
|
30.000
|
$5.000
|
$210.000
|
$150.000
|
$160.000
|
$365.290
|
|
|
PRIME COAT (AE-P)
|
GAL
|
24.000
|
$12.000
|
$28.000
|
$110.000
|
$55.000
|
$63.840
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
54.000
|
$10.000
|
$50.000
|
$110.000
|
$29.000
|
$26.650
|
|
|
AGGR(TY-B GR-3 SAC-B)
|
CY
|
2.000
|
$250.000
|
$5,800.000
|
$200.000
|
$3,900.000
|
$3,090.710
|
|
|
D-GR HMA(SQ) TY-D PG70-22
|
TON
|
16.000
|
$300.000
|
$2,500.000
|
$300.000
|
$815.000
|
$497.450
|
|
|
PLANE ASPH CONC PAV(0" TO 1")
|
SY
|
1,990.000
|
$4.000
|
$14.000
|
$15.000
|
$7.000
|
$11.300
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
116.000
|
$5.000
|
$52.000
|
$110.000
|
$56.000
|
$79.870
|
|
|
FLOWABLE BACKFILL
|
CY
|
5.000
|
$225.000
|
$900.000
|
$500.000
|
$628.000
|
$536.530
|
|
|
CL C CONC (VEH DEFL WALL)(HPC)
|
CY
|
1,178.100
|
$1,200.000
|
$1,100.000
|
$1,520.000
|
$1,550.000
|
$1,726.060
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
6,900.000
|
$25.000
|
$45.000
|
$35.250
|
$50.000
|
$72.740
|
|
|
SILICONE RESIN PAINT FINISH
|
SF
|
600.000
|
$10.000
|
$6.000
|
$10.000
|
$115.000
|
$20.450
|
|
|
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
|
SF
|
199.000
|
$60.000
|
$80.000
|
$150.000
|
$220.000
|
$225.960
|
|
|
CONC STR REPAIR (EPOXY MORTAR)
|
SF
|
751.000
|
$90.000
|
$125.000
|
$150.000
|
$80.000
|
$227.900
|
|
|
CONC STR REPAIR(DECK REP(PART DEPTH))
|
SF
|
53.000
|
$120.000
|
$120.000
|
$150.000
|
$300.000
|
$105.680
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
4,140.000
|
$190.000
|
$115.000
|
$150.000
|
$95.000
|
$149.250
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
450.000
|
$575.000
|
$700.000
|
$750.000
|
$750.000
|
$688.120
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
128.000
|
$600.000
|
$780.000
|
$750.000
|
$830.000
|
$707.530
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL3)
|
LF
|
728.000
|
$38.000
|
$25.000
|
$75.000
|
$90.000
|
$35.650
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL7)
|
LF
|
1,055.000
|
$25.000
|
$40.000
|
$15.000
|
$58.000
|
$41.820
|
|
|
CLEANING EXISTING JOINTS
|
LF
|
218.000
|
$6.000
|
$15.000
|
$15.000
|
$57.000
|
$30.680
|
|
|
MULTI-LAYER POLYMER OVERLAY
|
SY
|
1,990.000
|
$60.000
|
$38.000
|
$75.000
|
$110.000
|
$49.660
|
|
|
STR STEEL (SHEAR CONNECTOR)
|
LB
|
1,638.000
|
$15.000
|
$10.000
|
$7.500
|
$95.000
|
$49.570
|
|
|
CLEAN & PAINT EXIST STR (SPL PROT SYS)
|
LS
|
1.000
|
$350,000.000
|
$585,000.000
|
$650,000.000
|
$700,000.000
|
$279,745.000
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
540.000
|
$46.000
|
$145.000
|
$120.000
|
$320.000
|
$557.330
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
65.000
|
$92.000
|
$200.000
|
$75.000
|
$125.000
|
$111.750
|
|
|
HEADER TYPE EXPANSION JOINT
|
CF
|
305.700
|
$350.000
|
$275.000
|
$350.000
|
$225.000
|
$581.380
|
|
|
JOINT SEALANT
|
LF
|
620.000
|
$11.000
|
$15.000
|
$15.000
|
$115.000
|
$23.910
|
|
|
SHOT BLASTING
|
SY
|
1,990.000
|
$7.000
|
$8.000
|
$10.000
|
$22.000
|
$6.210
|
|
|
REMOVE STR (CONC)
|
EA
|
28.000
|
$3,000.000
|
$3,000.000
|
$1,500.000
|
$2,700.000
|
$6,240.240
|
|
|
REMOV STR (APPROACH SLAB)
|
EA
|
2.000
|
$3,500.000
|
$10,500.000
|
$2,000.000
|
$13,000.000
|
$6,273.490
|
|
|
REMOV STR (BRIDGE SLAB)
|
LF
|
230.000
|
$500.000
|
$550.000
|
$100.000
|
$400.000
|
$138.980
|
|
|
REMOVE STR (RAIL)
|
LF
|
44.000
|
$21.000
|
$200.000
|
$85.000
|
$225.000
|
$286.670
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$540,884.700
|
$776,000.000
|
$780,000.000
|
$200,000.000
|
$1,182,023.200
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
17.000
|
$7,000.000
|
$21,200.000
|
$20,000.000
|
$8,000.000
|
$11,130.190
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
500.000
|
$2.500
|
$7.000
|
$5.000
|
$30.000
|
$4.090
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
500.000
|
$0.800
|
$2.000
|
$1.000
|
$11.000
|
$1.890
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
200.000
|
$5.000
|
$11.000
|
$7.500
|
$72.000
|
$13.790
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
200.000
|
$1.450
|
$2.000
|
$1.000
|
$25.000
|
$3.340
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
1,440.000
|
$29.000
|
$64.000
|
$65.000
|
$180.000
|
$59.460
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
15,870.000
|
$6.000
|
$25.000
|
$5.000
|
$16.000
|
$15.590
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
1,440.000
|
$11.000
|
$13.000
|
$5.000
|
$25.000
|
$42.230
|
|
|
PERM CTB(SGL SLOPE)(TY 1)(42)(HPC)
|
LF
|
3,592.000
|
$55.000
|
$130.000
|
$120.000
|
$250.000
|
$293.020
|
|
|
PERM CTB(SGL SLOPE)(TY 1)(54)(HPC)
|
LF
|
435.000
|
$80.000
|
$165.000
|
$135.000
|
$250.000
|
$413.490
|
|
|
PERM CTB(F-SHAPE)(TY 1)(HPC)
|
LF
|
50.000
|
$40.000
|
$100.000
|
$130.000
|
$250.000
|
$654.670
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
20.000
|
$50.000
|
$240.000
|
$40.000
|
$75.000
|
$91.420
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
126.000
|
$24.000
|
$25.000
|
$25.000
|
$30.000
|
$21.290
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$1,500.000
|
$1,800.000
|
$2,000.000
|
$2,500.000
|
$1,691.630
|
|
|
SHORT RADIUS
|
LF
|
498.000
|
$30.000
|
$30.000
|
$30.000
|
$40.000
|
$25.540
|
|
|
MTL BEAM GD FEN TRANS(THRIE BEAM)28"
|
EA
|
11.000
|
$1,600.000
|
$1,700.000
|
$1,500.000
|
$2,200.000
|
$1,550.570
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
3,048.000
|
$3.250
|
$2.000
|
$2.000
|
$5.000
|
$2.040
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
25.000
|
$350.000
|
$200.000
|
$120.000
|
$500.000
|
$146.240
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$2,600.000
|
$2,300.000
|
$2,500.000
|
$3,000.000
|
$2,164.770
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
11.000
|
$300.000
|
$300.000
|
$150.000
|
$300.000
|
$185.060
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
23.000
|
$16,000.000
|
$22,000.000
|
$14,500.000
|
$28,000.000
|
$13,435.470
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
74.000
|
$1,800.000
|
$2,000.000
|
$650.000
|
$1,800.000
|
$1,336.030
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$800.000
|
$3,000.000
|
$425.000
|
$1,100.000
|
$885.930
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$8,000.000
|
$8,000.000
|
$7,500.000
|
$15,000.000
|
$9,471.860
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
|
EA
|
8.000
|
$35.000
|
$35.000
|
$24.000
|
$65.000
|
$69.830
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BR)
|
EA
|
80.000
|
$15.000
|
$30.000
|
$11.000
|
$69.000
|
$176.860
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
76,320.000
|
$1.000
|
$0.950
|
$1.750
|
$1.000
|
$0.800
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
75,600.000
|
$1.000
|
$0.950
|
$1.750
|
$1.000
|
$0.790
|
|
|
PAVEMENT SEALER 4"
|
LF
|
2,600.000
|
$0.250
|
$0.730
|
$0.500
|
$0.600
|
$0.490
|
|
|
PAVEMENT SEALER 24"
|
LF
|
94.000
|
$3.000
|
$1.680
|
$3.000
|
$2.000
|
$2.910
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
14,251.000
|
$0.650
|
$0.500
|
$1.500
|
$1.000
|
$0.760
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
9,420.000
|
$0.650
|
$0.500
|
$1.500
|
$1.000
|
$0.660
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
6,000.000
|
$0.650
|
$0.500
|
$1.500
|
$1.000
|
$0.670
|
|
PREFAB PAV MRK TY B (W)(24")(SLD)
|
LF
|
94.000
|
$4.500
|
$27.930
|
$33.000
|
$18.000
|
$18.040
|
|
PREFAB PAV MRK TY B (Y)(4")(SLD)
|
LF
|
2,600.000
|
$4.500
|
$6.700
|
$6.250
|
$6.000
|
$5.230
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
19.000
|
$3.000
|
$5.590
|
$3.000
|
$8.000
|
$11.740
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
717.000
|
$4.000
|
$4.470
|
$3.000
|
$6.000
|
$3.910
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
14,213.000
|
$0.500
|
$6.000
|
$3.000
|
$1.000
|
$0.610
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
2,600.000
|
$0.200
|
$0.850
|
$0.600
|
$1.000
|
$0.470
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
94.000
|
$3.000
|
$2.800
|
$3.250
|
$2.000
|
$2.800
|
|
|
CONCRETE RAIL REPAIR (IN-KIND)
|
LF
|
12.000
|
$500.000
|
$1,250.000
|
$650.000
|
$450.000
|
$941.850
|
|
|
CNC CRACK REPAIR (DISCRETE)(GRAVITY)
|
LF
|
336.000
|
$25.000
|
$55.000
|
$40.000
|
$19.000
|
$105.670
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
55.000
|
$75.000
|
$55.000
|
$125.000
|
$58.000
|
$273.440
|
|
|
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
|
LF
|
170.000
|
$15.000
|
$55.000
|
$15.000
|
$33.000
|
$40.550
|
|
|
REP STL BRIDGE MEMBER(STRAIGHTEN MEMB)
|
EA
|
1.000
|
$3,000.000
|
$45,000.000
|
$5,000.000
|
$42,000.000
|
$20,588.720
|
|
|
CARBON FIBER REINF POLYMER PROTECTION
|
SF
|
1,173.000
|
$60.000
|
$74.000
|
$15.000
|
$132.000
|
$157.930
|
|
|
CONCRETE BEAM REPAIR (CFRP)
|
EA
|
41.000
|
$8,000.000
|
$5,100.000
|
$12,250.000
|
$4,100.000
|
$13,812.110
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
5.000
|
$12,000.000
|
$30,000.000
|
$15,000.000
|
$10,000.000
|
$36,611.630
|
|
Totals: |
$6,107,331.350
|
$7,767,027.740
|
$7,843,203.000
|
$8,680,642.500
|
$9,994,372.852
|