HOWARD IH 20 (0005-05-109)

Items: 66

County: HOWARD
Length: N/A
Highway: IH 20
District: ABILENE
Control Number: 0005-05-109
DBE Goal: N/A
Project: NH 2018(341)
Guaranty: N/A
Time: 92 WORKING DAYS
Engineer's Estimate: $7,326,675.75
Date: 12/05/2017 (8 years ago)
Contract Number: N/A
Type: SPOT BASE REPAIR, 1-CST, 2"SMA-D OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$7,326,675.75
$6,798,902.46
Over/Under Est: -7.2% -$527,773.29
$8,986,550.69
Over/Under Est: 22.66% $1,659,874.94
Amt Left: 32.18% $2,187,648.23

Bid Items & Bid Tabulations

66 Total 0 of 66
HOWARD  |  IH 20  |  ABILENE  |  0005-05-109  |  12/05/2017  |  $7,326,675.75  |  NH 2018(341)  |  SPOT BASE REPAIR, 1-CST, 2"SMA-D OVE...  |  92 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
PRICE CONSTRUCTION, LTD.
FNF CONSTRUCTION, INC.
EMBANKMENT (ORIGINAL)(ORD COMP)(TY B)
CY 500.000 $15.000 $38.450 $40.000
BLADING
HR 20.000 $200.000 $161.960 $263.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 50,339.000 $0.150 $0.140 $0.200
EMULS ASPH (EROSN CONT)(SS-1)
GAL 7,551.000 $5.500 $2.920 $3.250
ASPH (MULTI OPTION)
GAL 97,522.000 $3.700 $2.740 $3.500
AGGR(TY-B GR-4 SAC-B)
CY 1,847.000 $90.000 $125.560 $200.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-28
TON 23,324.000 $130.000 $117.680 $128.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 21,444.000 $45.000 $37.610 $68.000
PLANE ASPH CONC PAV (2")
SY 168,350.000 $1.250 $1.040 $2.250
PLANE ASPH CONC PAV (2 1/2")
SY 43,645.000 $1.500 $1.460 $2.500
DRILL SHAFT (SIGN MTS) (12 IN)
LF 42.000 $40.000 $120.860 $150.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 59.000 $145.000 $164.800 $200.000
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 263.000 $80.000 $78.010 $99.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 159.000 $125.000 $236.220 $235.000
CONC STR REPAIR (STANDARD)
SF 48.000 $195.000 $164.800 $272.000
RIPRAP (MOW STRIP)(4 IN)
CY 1,566.000 $500.000 $473.540 $600.000
CONCRETE OVERLAY (3 IN)
SY 1,719.000 $140.000 $158.210 $82.000
CLEAN EXIST STR
LS 2.000 $10,000.000 $10,986.970 $12,000.000
RETROFIT RAIL (TY T551)
LF 40.600 $200.000 $1,076.720 $600.000
SAW GROOVING
SY 1,719.000 $5.500 $5.490 $8.000
MILLING CONCRETE SLAB (3IN)
SY 1,719.000 $5.500 $21.970 $19.000
MOBILIZATION
LS 1.000 $652,790.000 $195,203.380 $875,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $9,500.000 $9,470.850 $51,700.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 180.000 $5.000 $7.170 $4.250
BIODEG EROSN CONT LOGS (REMOVE)
LF 180.000 $1.000 $4.280 $1.250
TURNOUTS (RAP)
SY 240.000 $8.500 $52.450 $27.000
RUMBLE STRIPS (SHOULDER)
LF 92,362.000 $0.250 $0.120 $0.120
MTL W-BEAM GD FEN (TIM POST)
LF 5,250.000 $18.300 $18.500 $20.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 6.000 $1,600.000 $1,922.720 $2,100.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 10.000 $1,033.000 $949.270 $1,000.000
MTL BM GD FEN TRANS (NON - SYM)
EA 5.000 $700.000 $714.150 $800.000
REMOVE METAL BEAM GUARD FENCE
LF 5,250.000 $3.000 $1.650 $3.200
REMOVE TERMINAL ANCHOR SECTION
EA 10.000 $175.000 $109.870 $310.000
CABLE BARRIER SYSTEM (TL-4)
LF 34,851.000 $3.700 $10.600 $9.000
CABLE BARRIER TERMINAL SECTION (TL-4)
EA 6.000 $2,546.000 $2,636.870 $5,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 11.000 $2,150.000 $2,422.630 $2,600.000
GUARDRAIL END TREATMENT (REMOVE)
EA 11.000 $325.000 $219.740 $310.000
ALUMINUM SIGNS (TY A)
SF 20.000 $20.000 $23.350 $20.000
ALUMINUM SIGNS (TY G)
SF 653.000 $20.000 $24.450 $23.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 11.000 $350.000 $933.890 $870.000
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 1.000 $500.000 $1,043.760 $1,000.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 4.000 $585.000 $1,290.970 $1,200.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 2.000 $1,400.000 $3,845.440 $3,600.000
REMOVE SM RD SN SUP&AM
EA 12.000 $65.000 $109.870 $110.000
REMOVE BRDG MNT CLEARANCE SIGN ASSM
EA 2.000 $330.000 $329.610 $310.000
INSTALL LRSS (STRUCT STEEL)
LB 3,776.000 $4.000 $5.770 $6.000
REMOVE LRSA
EA 7.000 $740.000 $824.020 $780.000
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
EA 25.000 $68.000 $82.400 $77.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 11.000 $18.000 $27.470 $21.000
INSTL DEL ASSM (D-SY)SZ 2(WC)GND
EA 29.000 $75.000 $82.400 $77.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 11.000 $15.000 $27.470 $21.000
INSTL DEL ASSM (D-DW)SZ 2(WC)GND
EA 68.000 $38.000 $82.400 $77.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 25.000 $60.000 $82.400 $77.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 35.000 $25.000 $27.470 $37.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 7,476.000 $1.250 $1.490 $2.250
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 363.000 $1.200 $1.100 $0.350
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,778.000 $1.000 $0.770 $0.700
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 975.000 $2.500 $2.750 $4.100
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 12,600.000 $0.380 $0.380 $0.350
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 50,469.000 $0.300 $0.310 $0.350
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 50,800.000 $0.350 $0.310 $0.350
PREFAB PAV MRK TY C (W) (NUMBER)
EA 3.000 $320.000 $494.410 $900.000
REFL PAV MRKR TY II-C-R
EA 784.000 $4.000 $3.020 $4.100
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 587.000 $66.000 $83.500 $60.000
BRIDGE JOINT REPLACEMENT (SEJ)
LF 306.000 $410.000 $774.580 $330.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $13,000.000 $5,688.910 $25,000.000
Totals: $7,326,675.750 $6,798,902.462 $8,986,550.690