HOUSTON SL 304 (1854-01-051)

Items: 78

County: HOUSTON
Length: 0.0000 MILES
Highway: SL 304
District: LUFKIN
Control Number: 1854-01-051
DBE Goal: 2.5%
Project: F 2B24(103)
Guaranty: $100,000.00
Time: 263 WORKING DAYS
Engineer's Estimate: $14,652,486.20
Date: 10/01/2024 (1 year ago)
Contract Number: 10243011
Type: RESURFACE ROADWAY
Project ID: A00196794
Project Description: HMA OVERLAY
Mail/Deliver Bids To: N/A
JESSE SISCO
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$14,652,486.20
$13,181,849.79
Over/Under Est: -10.04% -$1,470,636.41
Over/Under Est: -7.76% -$1,136,509.65
Amt Left: 2.53% $334,126.76
$17,569,943.65
Over/Under Est: 19.91% $2,917,457.45
Amt Left: 33.29% $4,388,093.86
Delta: -29.99% -$4,053,967.10
Subcontractor Percentage Amount
PINTO CONSTRUCTION CO., INC. 7.49% $1,047,586.58
J & M CONTRACTING, COMPANY 2.67% $373,438.74
INTERSTATE BARRICADES & MARKINGS, INC. 2.10% $293,715.86
MISSOURI PETROLEUM PRODUCTS COMPANY LLC 1.82% $254,553.75
AMERICAN REMEDIATION OPTIONS, INC. 1.12% $156,648.46
DUSTROL, INC. 0.44% $61,540.47
WEST TEXAS ROCK RESOURCES, LLC 0.17% $23,777.00
NORTEX CONCRETE LIFT & STABILIZATION, INC. 0.13% $18,182.41
Total: 15.94% $2,229,443.27

Bid Items & Bid Tabulations

78 Total 0 of 78
HOUSTON  |  SL 304  |  LUFKIN  |  1854-01-051  |  10/01/2024  |  $14,652,486.20  |  F 2B24(103)  |  RESURF ROADWAY  |  263 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
BIG CREEK CONSTRUCTION, LTD.
FNH CONSTRUCTION, LLC
REMOV CONC (DRIVEWAYS)
SY 1,144.000 $37.000 $55.000 $50.000 $30.000
EXCAV (ROADWAY)
CY 8,821.000 $20.000 $14.350 $40.000 $25.000
EMBANK (VEH)(DC)(TY C)
CY 12,422.000 $35.000 $33.450 $40.000 $50.000
BACKFILL (TY B)
STA 626.800 $275.000 $291.960 $225.000 $250.000
SPEC EXCAV WORK (HYD EXCAVATOR)
HR 22.000 $200.000 $250.000 $130.000 $150.000
BLOCK SODDING
SY 5,526.000 $10.000 $7.700 $6.500 $10.000
BROADCAST SEED (TEMP_WARM)
SY 5,498.000 $2.000 $0.190 $0.500 $2.000
BROADCAST SEED (TEMP_COOL)
SY 5,498.000 $2.000 $0.190 $0.500 $2.000
VEGETATIVE WATERING
TGL 331.000 $20.000 $1.000 $25.000 $50.000
EMULS ASPH (EROSN CONT)(SS-1)
GAL 13,373.000 $10.000 $6.930 $5.000 $10.000
ASPH (AC-15P OR CRS-2P)
TON 197.000 $1,500.000 $1,110.000 $1,000.000 $1,500.000
AGGR (TY E OR L, PE OR PL GR 4)
CY 810.000 $277.000 $198.000 $225.000 $300.000
SP MIXES SP-C SAC-A PG70-22
TON 61,796.000 $150.000 $148.360 $137.000 $180.000
SP MIXES SP-C SAC-A PG70-22 (EXEMPT)
TON 224.000 $180.000 $246.380 $275.000 $200.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 1,500.000 $175.000 $141.530 $125.000 $120.000
PLANE ASPH CONC PAV(0" TO 2")
SY 7,799.000 $4.000 $4.960 $3.500 $30.000
PLANE ASPH CONC PAV(0" TO 3")
SY 10,560.000 $4.000 $4.630 $3.750 $30.000
FULL - DEPTH REPAIR CRCP (12")
CY 50.000 $1,000.000 $725.000 $1,500.000 $1,000.000
STRUCT EXCAV
CY 2.300 $9.000 $28.000 $250.000 $500.000
TEMPORARY SPL SHORING
SF 4,040.000 $40.000 $70.000 $60.000 $70.000
CL B CONC (FLUME)
CY 11.000 $1,400.000 $1,350.000 $2,000.000 $1,000.000
CL C CONC (MISC)
CY 9.000 $1,200.000 $3,500.000 $3,500.000 $1,500.000
RC PIPE (CL III)(18 IN)
LF 24.000 $110.000 $80.000 $100.000 $150.000
RC PIPE (CL III)(36 IN)
LF 34.000 $210.000 $400.000 $350.000 $350.000
HEADWALL (CH - FW - 30) (DIA= 36 IN)
EA 1.000 $15,000.000 $22,000.000 $20,000.000 $6,500.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 2.000 $1,800.000 $1,700.000 $1,500.000 $1,850.000
REMOV STR (HEADWALL)
EA 1.000 $1,500.000 $2,300.000 $2,500.000 $1,000.000
REMOV STR (PIPE)
EA 1.000 $1,500.000 $1,700.000 $1,500.000 $500.000
MOBILIZATION
LS 1.000 $1,500,000.000 $575,000.000 $1,300,000.000 $1,700,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 27.000 $3,500.000 $4,000.000 $5,000.000 $8,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $20,000.000 $15,000.000 $15,000.000 $16,500.000
TMA (STATIONARY)
DAY 213.000 $250.000 $150.000 $300.000 $250.000
TMA (MOBILE OPERATION)
DAY 50.000 $250.000 $25.000 $500.000 $550.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,250.000 $4.000 $3.300 $5.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,250.000 $1.000 $1.650 $1.000 $2.000
CONC CURB & GUTTER (TY IIA)
LF 600.000 $50.000 $110.000 $125.000 $65.000
DRIVEWAYS (CONC)
SY 413.000 $105.000 $275.000 $250.000 $125.000
DRIVEWAYS (ACP)
SY 7,427.000 $70.000 $32.100 $45.000 $55.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 54,935.000 $0.500 $0.310 $0.300 $0.500
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 27,468.000 $0.500 $0.400 $0.350 $0.500
MTL W-BEAM GD FEN (TIM POST)
LF 2,237.500 $35.000 $26.450 $35.000 $28.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,500.000 $1,850.000 $2,500.000 $1,850.000
REMOVE METAL BEAM GUARD FENCE
LF 2,650.000 $9.000 $2.750 $3.000 $5.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,500.000 $3,025.000 $3,000.000 $3,250.000
GUARDRAIL END TREATMENT (REMOVE)
EA 6.000 $450.000 $275.000 $400.000 $1,500.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 15.000 $625.000 $655.000 $670.000 $1,000.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 55.000 $300.000 $303.000 $250.000 $1,000.000
MAILBOX INSTALL-D (WC-POST) TY 3
EA 16.000 $350.000 $302.000 $550.000 $1,000.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 2.000 $650.000 $650.000 $800.000 $1,500.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000 $500.000 $435.000 $750.000 $1,250.000
REMOVE SM RD SN SUP&AM
EA 2.000 $175.000 $105.000 $100.000 $550.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 25.000 $35.000 $35.000 $50.000 $100.000
INSTL OM ASSM (OM-2Z)(WFLX)SRF(BI)
EA 1.000 $125.000 $300.000 $75.000 $100.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 319.000 $1.000 $0.280 $1.000 $10.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 9,276.000 $0.500 $0.280 $1.000 $2.000
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 3,005.000 $1.500 $2.500 $1.500 $2.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 32,277.000 $2.500 $2.500 $1.500 $2.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 807.000 $2.000 $2.000 $1.500 $6.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,077.000 $2.000 $2.000 $1.500 $6.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 2,023.000 $1.500 $0.950 $1.000 $6.000
REFL PAV MRK TY I (W)6"(BRK)(090MIL)
LF 6,677.000 $1.000 $0.720 $0.900 $2.000
REFL PAV MRK TY I (W)6"(SLD)(090MIL)
LF 136,004.000 $1.000 $0.710 $0.650 $0.850
REFL PAV MRK TY I (Y)6"(BRK)(090MIL)
LF 13,496.000 $1.000 $0.730 $1.000 $0.850
REFL PAV MRK TY I (Y)6"(SLD)(090MIL)
LF 116,459.000 $1.000 $0.720 $0.650 $0.850
PREFAB PM TY C (W)(24")(SLD)
LF 844.000 $20.000 $13.000 $15.000 $20.000
PREFAB PM TY C (W)(ARROW)
EA 37.000 $280.000 $217.000 $220.000 $250.000
PREFAB PM TY C (W)(WORD)
EA 15.000 $325.000 $275.000 $280.000 $250.000
REFL PAV MRKR TY I-C
EA 442.000 $6.000 $5.500 $5.000 $6.000
REFL PAV MRKR TY II-A-A
EA 2,742.000 $6.500 $5.500 $5.000 $6.000
ELIM EXT PM & MRKS (4")
LF 12,912.000 $1.000 $0.170 $0.500 $1.500
ELIM EXT PM & MRKS (8")
LF 880.000 $1.000 $0.330 $1.000 $6.000
ELIM EXT PM & MRKS (24")
LF 844.000 $5.000 $2.200 $5.000 $20.000
ELIM EXT PM & MRKS (ARROW)
EA 37.000 $85.000 $50.000 $50.000 $250.000
ELIM EXT PM & MRKS (WORD)
EA 15.000 $85.000 $50.000 $100.000 $250.000
UNDERSEAL COURSE
GAL 2,112.000 $5.000 $9.660 $5.500 $6.000
BONDING COURSE
GAL 22,832.000 $6.000 $5.500 $4.500 $3.000
SOIL DENS & RAISING CONC SLABS (HDPF)
LB 267.000 $9.000 $99.880 $75.000 $100.000
GEOGRID REINFORCE EMBANKMENTS (TY A)
SY 10,951.000 $3.000 $6.740 $5.000 $8.000
Totals: $14,652,486.200 $13,181,849.803 $13,515,976.550 $17,569,943.650