HOUSTON CR (0911-28-049)

Items: 45

County: HOUSTON
Length: N/A
Highway: CR
District: LUFKIN
Control Number: 0911-28-049
DBE Goal: N/A
Project: BR 2B20(103)
Guaranty: N/A
Time: 152 WORKING DAYS
Engineer's Estimate: $1,758,952.05
Date: 06/04/2021 (5 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (4)
E
Engineer's Estimate
$1,758,952.05
$1,693,606.18
Over/Under Est: -3.72% -$65,345.87
Over/Under Est: -1.77% -$31,213.15
Amt Left: 2.02% $34,132.72
$1,736,717.25
Over/Under Est: -1.26% -$22,234.80
Amt Left: 2.55% $43,111.07
Delta: -0.52% -$8,978.35
Over/Under Est: -0.1% -$1,773.07
Amt Left: 3.75% $63,572.80
Delta: -1.18% -$20,461.73

Bid Items & Bid Tabulations

45 Total 0 of 45
HOUSTON  |  CR  |  LUFKIN  |  0911-28-049  |  06/04/2021  |  $1,758,952.05  |  BR 2B20(103)  |  BRIDGE REPL  |  152 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
STATELINE CONSTRUCTION, LLC
HODGES AND SON CONSTRUCTION COMPANY, INC.
A. L. HELMCAMP, INC.
FUQUA CONSTRUCTION CO., INC.
PREPARING ROW
STA 16.110 $1,800.000 $895.000 $2,800.000 $3,800.000 $5,000.000
EXCAVATION (ROADWAY)
CY 3,117.000 $8.000 $12.000 $15.000 $14.000 $8.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 388.000 $15.000 $26.000 $30.000 $25.000 $8.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 30.000 $40.000 $66.000 $75.000 $60.000 $30.000
BROADCAST SEED (TEMP) (WARM)
SY 2,467.000 $0.500 $0.550 $0.500 $0.500 $0.900
BROADCAST SEED (TEMP) (COOL)
SY 2,467.000 $0.500 $0.550 $0.500 $0.500 $0.900
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 4,933.000 $0.750 $0.620 $1.500 $0.350 $0.900
VEGETATIVE WATERING
MG 197.400 $15.000 $16.250 $1.000 $12.000 $12.000
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 863.000 $1.600 $2.190 $2.500 $1.300 $2.400
FL BS (CMP IN PLC)(TY D GR 1-2) (6")
SY 2,853.000 $25.000 $41.000 $30.000 $20.000 $15.640
CEM STABIL BKFL
CY 166.000 $225.000 $295.000 $225.000 $260.000 $149.000
SHEET PILING (PZ - 27)
SF 1,575.000 $40.000 $51.950 $48.000 $50.000 $45.000
DRILL SHAFT (24 IN)
LF 840.000 $200.000 $161.000 $115.000 $160.000 $178.000
DRILL SHAFT (30 IN)
LF 360.000 $300.000 $179.000 $145.000 $230.000 $228.000
CL C CONC (ABUT)
CY 68.000 $1,125.000 $815.000 $1,200.000 $1,500.000 $1,200.000
CL C CONC (CAP)
CY 44.200 $1,020.000 $922.250 $1,200.000 $1,700.000 $1,200.000
CL C CONC (COLUMN)
CY 5.600 $1,020.000 $1,800.000 $1,800.000 $1,800.000 $1,492.000
REINF CONC SLAB (BOX BEAM)
SF 4,186.000 $18.000 $15.750 $20.000 $23.000 $22.000
REINF CONC SLAB (SLAB BEAM)
SF 6,110.000 $20.000 $16.950 $20.000 $27.000 $22.000
SHEAR KEY
CY 21.200 $365.000 $300.000 $800.000 $700.000 $450.000
PRESTR CONC BOX BEAM (4B20)
LF 634.000 $210.000 $185.000 $215.000 $175.000 $202.340
PRESTR CONC BOX BEAM (5B20)
LF 317.000 $210.000 $185.000 $215.000 $205.000 $202.340
PRESTR CONC SLAB BEAM (5SB15)
LF 1,160.000 $205.000 $185.000 $215.000 $170.000 $202.340
RIPRAP (CONC)(5 IN)
CY 5.000 $420.000 $800.000 $700.000 $600.000 $350.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 775.000 $135.000 $141.250 $100.000 $110.000 $140.000
RAIL (TY T631LS)
LF 870.000 $65.000 $74.000 $60.000 $37.000 $114.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 2.000 $610.000 $800.000 $3,000.000 $1,300.000 $1,500.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 3.000 $17,000.000 $32,500.000 $15,000.000 $12,000.000 $10,000.000
MOBILIZATION
LS 1.000 $165,000.000 $82,500.000 $165,000.000 $100,000.000 $130,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $1,600.000 $4,500.000 $2,000.000 $4,000.000 $680.380
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 230.000 $30.000 $32.500 $1.000 $37.000 $42.000
ROCK FILTER DAMS (REMOVE)
LF 230.000 $10.000 $10.000 $1.000 $9.000 $12.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 886.000 $3.000 $2.950 $1.000 $3.000 $5.400
TEMP SEDMT CONT FENCE (REMOVE)
LF 886.000 $1.000 $0.950 $1.000 $1.000 $1.800
MTL W-BEAM GD FEN (TIM POST)
LF 517.500 $25.000 $32.000 $25.000 $24.000 $25.800
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 6.000 $1,200.000 $1,775.000 $1,500.000 $1,200.000 $1,260.000
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $2,800.000 $3,450.000 $2,800.000 $2,500.000 $2,736.000
WIRE FENCE (TY C)
LF 566.000 $15.000 $16.000 $20.000 $8.000 $14.300
WIRE FENCE (WATER GAP)
LF 114.000 $45.000 $17.000 $45.000 $70.000 $50.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 2.000 $275.000 $400.000 $500.000 $170.000 $180.000
REMOVE SM RD SN SUP&AM
EA 6.000 $80.000 $85.000 $100.000 $45.000 $48.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 12.000 $25.000 $20.000 $30.000 $22.000 $24.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 6.000 $30.000 $30.000 $30.000 $28.000 $30.000
THERMOPLASTIC PIPE(18 IN)(PP)(TYPE III)
LF 42.000 $48.000 $0.000 $0.000 $0.000 $0.000
1
RC PIPE (CL III)(18 IN)
LF 42.000 $48.000 $58.000 $100.000 $65.000 $80.000
Totals: $1,760,968.050 $1,693,606.180 $1,727,738.900 $1,736,717.250 $1,757,178.980