HOUSTON SH 21 (0117-06-047)

Items: 124

County: HOUSTON
Length: N/A
Highway: SH 21
District: LUFKIN
Control Number: 0117-06-047
DBE Goal: N/A
Project: BR 2022(446)
Guaranty: N/A
Time: 418 WORKING DAYS
Engineer's Estimate: $26,829,047.20
Date: 04/07/2022 (4 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (6)
E
Engineer's Estimate
$26,829,047.20
$27,844,040.21
Over/Under Est: 3.78% $1,014,993.01
$31,549,115.82
Over/Under Est: 17.59% $4,720,068.62
Amt Left: 13.31% $3,705,075.61
Over/Under Est: 21.63% $5,802,839.33
Amt Left: 17.2% $4,787,846.32
Delta: -3.43% -$1,082,770.71
Over/Under Est: 24.51% $6,576,511.69
Amt Left: 19.97% $5,561,518.68
Delta: -2.37% -$773,672.36
Over/Under Est: 28.43% $7,626,918.92
Amt Left: 23.75% $6,611,925.91
Delta: -3.14% -$1,050,407.23
Over/Under Est: 46.37% $12,439,381.95
Amt Left: 41.03% $11,424,388.94
Delta: -13.97% -$4,812,463.03
Subcontractor Percentage Amount
LINDAMOOD, INC. 3.48% $979,635.74
HERMANOS STEEL, LLC 0.96% $270,244.34
CEN TEX HYDROSEED, INC. 0.70% $197,053.17
STRIPE LINES, INC. 0.42% $118,231.90
PRIMATE CONSTRUCTION, LP 0.14% $39,410.63
DUSTIN ALLEN, INC. 0.14% $39,410.63
SURFACE PREPARATION TECHNOLOGIES, LLC 0.02% $5,630.09
PINNACLE GRINDING AND GROOVING LLC 0.02% $5,630.09
A-CORE CONCRETE CUTTING, INC. 0.02% $5,630.09
Total: 5.90% $1,660,876.68

Bid Items & Bid Tabulations

124 Total 0 of 124
HOUSTON  |  SH 21  |  LUFKIN  |  0117-06-047  |  04/07/2022  |  $26,829,047.20  |  BR 2022(446)  |  BRIDGE REPL  |  418 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
A. L. HELMCAMP, INC.
WEBBER, LLC
ZACHRY CONSTRUCTION CORPORATION
HARPER BROTHERS CONSTRUCTION LLC
LONGVIEW BRIDGE AND ROAD, LTD.
R CONSTRUCTION CIVIL, LLC
PREPARING ROW
STA 63.100 $1,500.000 $1,050.000 $49,603.800 $51,505.550 $6,575.000 $15,000.000 $29,000.000
REMOVING CONC (PAV)
SY 4,367.000 $6.000 $29.000 $7.630 $6.620 $10.000 $14.000 $6.000
REMOVING STAB BASE & ASPH PAV(14")
SY 18,004.000 $5.000 $3.000 $5.220 $9.000 $5.000 $5.850 $4.000
REMOVING STAB BASE & ASPH PAV (8")
SY 4,367.000 $6.000 $5.400 $4.810 $4.190 $3.500 $5.350 $4.000
EXCAVATION (ROADWAY)
CY 32,778.000 $8.000 $7.000 $6.760 $4.700 $5.000 $14.200 $12.000
EXCAVATION (SPECIAL)
CY 429.000 $25.000 $15.000 $7.790 $4.260 $15.000 $25.000 $30.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 106,350.000 $10.000 $13.250 $12.040 $11.050 $11.500 $11.000 $18.000
FURNISHING AND PLACING TOPSOIL (4")
SY 63,168.000 $1.000 $1.300 $0.780 $0.570 $0.500 $2.800 $1.500
ROLL SODDING
SY 500.000 $3.150 $5.250 $5.000 $5.000 $11.460 $6.600 $7.000
BROADCAST SEED (TEMP) (WARM)
SY 31,584.000 $0.150 $0.130 $0.120 $0.120 $0.160 $0.200 $0.150
BROADCAST SEED (TEMP) (COOL)
SY 31,584.000 $0.150 $0.130 $0.120 $0.120 $0.160 $0.200 $0.150
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 63,168.000 $0.500 $0.360 $0.340 $0.340 $0.160 $0.420 $0.350
VEGETATIVE WATERING
MG 2,526.800 $8.000 $5.000 $33.000 $20.000 $16.000 $22.000 $15.000
SOIL RETENTION BLANKETS (CL 1) (TY D)
SY 3,979.000 $1.000 $1.000 $0.950 $0.940 $1.060 $1.560 $2.500
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 450.000 $65.000 $70.000 $40.060 $86.890 $120.000 $107.000 $120.000
FL BS (RDWY DEL) (TY D GR 1-2)
TON 11,505.000 $55.000 $35.000 $21.400 $28.530 $42.000 $48.600 $60.000
CEMENT
TON 609.000 $150.000 $215.000 $176.980 $179.580 $200.000 $241.600 $200.000
CEMENT TREAT (NEW BASE) (8")
SY 4,129.000 $2.500 $2.500 $2.160 $4.670 $7.000 $2.500 $3.500
CEMENT TREAT (NEW BASE 14")
SY 13,356.000 $5.750 $4.000 $3.390 $7.710 $8.000 $3.300 $4.000
CEMENT TREAT (SUBGRADE)(12")
SY 17,188.000 $3.000 $3.000 $2.330 $1.910 $4.000 $2.300 $4.000
ASPH (RC-250)
TON 24.000 $1,000.000 $1,910.000 $2,000.000 $2,020.850 $2,000.000 $1,235.000 $2,300.000
AGGR (TY-PE, E, L OR PL GR 3)
CY 22.000 $500.000 $1,240.000 $160.000 $161.670 $160.000 $365.000 $190.000
AGGR (TY E OR L GR 5)
CY 145.000 $500.000 $420.000 $160.000 $161.670 $160.000 $250.000 $190.000
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
CY 203.000 $500.000 $220.000 $160.000 $161.670 $160.000 $260.000 $190.000
ASPH (AC-15P OR CRS-2P)
TON 50.000 $1,000.000 $1,375.000 $1,814.000 $1,832.910 $1,814.000 $1,005.000 $2,000.000
CEM STABIL BKFL
CY 315.000 $210.000 $155.000 $161.410 $71.240 $135.000 $255.000 $100.000
TEMPORARY SPL SHORING
SF 3,120.000 $20.000 $59.000 $48.180 $45.270 $20.000 $57.500 $90.000
SHEET PILING (PZ - 22)
SF 2,884.000 $75.000 $70.000 $77.510 $54.330 $40.000 $70.000 $90.000
DRILL SHAFT (36 IN)
LF 9,727.000 $350.000 $173.000 $209.670 $179.730 $375.000 $315.000 $295.000
DRILL SHAFT (60 IN)
LF 540.000 $950.000 $725.000 $590.320 $491.100 $1,000.000 $1,100.000 $1,000.000
DRILL SHAFT (72 IN)
LF 640.000 $1,200.000 $1,360.000 $1,402.840 $1,200.000 $2,000.000 $2,410.000 $3,650.000
CL A CONC (MISC)
CY 73.000 $725.000 $850.000 $320.540 $727.820 $850.000 $855.000 $950.000
CL C CONC (ABUT)
CY 64.500 $1,000.000 $1,000.000 $1,378.510 $1,700.000 $1,400.000 $1,125.000 $2,500.000
CL C CONC (CAP)
CY 694.900 $1,000.000 $1,175.000 $1,279.880 $1,600.000 $1,400.000 $1,100.000 $1,500.000
CL C CONC (CAP)(MASS)
CY 291.600 $1,000.000 $2,055.000 $757.890 $1,800.000 $1,485.000 $1,150.000 $1,500.000
CL C CONC (COLUMN)
CY 473.400 $1,200.000 $1,015.000 $1,136.410 $1,325.000 $1,400.000 $1,160.000 $1,600.000
CL C CONC (COLUMN)(MASS)
CY 255.800 $1,200.000 $1,500.000 $937.840 $1,650.000 $1,485.000 $1,540.000 $1,300.000
CL C CONC (COLLAR)
EA 1.000 $1,500.000 $4,500.000 $1,234.780 $1,796.800 $2,500.000 $5,200.000 $2,500.000
REINF CONC SLAB
SF 210,220.000 $18.000 $19.100 $25.370 $22.000 $26.900 $20.150 $26.000
APPROACH SLAB
CY 72.200 $400.000 $860.000 $792.990 $649.410 $850.000 $770.000 $1,200.000
PRESTR CONC GIRDER (TX54)
LF 23,599.000 $140.000 $186.000 $166.170 $170.890 $225.000 $220.000 $215.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 1,816.000 $165.000 $95.000 $55.960 $250.000 $135.000 $205.000 $190.000
ELASTOMERIC BEARING (E7)
EA 5.000 $1,200.000 $4,700.000 $4,565.900 $7,201.390 $6,000.000 $5,450.000 $7,000.000
ELASTOMERIC BEARING (F7)
EA 5.000 $2,200.000 $4,700.000 $4,565.900 $7,201.390 $6,000.000 $5,450.000 $7,000.000
SLIDING ELASTOMERIC BEARING (ES 4)
EA 5.000 $3,200.000 $3,400.000 $3,168.900 $5,984.840 $4,300.000 $3,775.000 $7,000.000
ELASTOMERIC BEARING(EE4)
EA 5.000 $1,355.000 $2,400.000 $2,149.200 $4,337.830 $3,125.000 $2,550.000 $7,000.000
STR STEEL (PLATE GIRDER)
LB 1,377,993.000 $2.500 $2.550 $1.960 $2.050 $2.900 $2.800 $3.050
RAIL (TY SSTR)
LF 9,188.000 $55.000 $73.000 $53.000 $51.710 $65.000 $50.000 $70.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 583.000 $120.000 $106.000 $148.670 $160.700 $200.000 $205.000 $215.000
SEALED EXPANSION JOINT (5 IN) (SEJ - M)
LF 104.000 $125.000 $106.000 $141.130 $160.700 $200.000 $207.000 $240.000
GABIONS (3' X 3')(GALV)
CY 54.000 $215.000 $318.000 $152.660 $192.290 $450.000 $300.000 $800.000
RC PIPE (CL III)(24 IN)
LF 110.000 $100.000 $72.000 $83.810 $77.050 $160.000 $82.000 $150.000
RC PIPE (CL III)(30 IN)
LF 16.000 $150.000 $105.000 $199.320 $216.900 $200.000 $184.000 $190.000
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 1.000 $8,500.000 $9,035.000 $8,993.840 $6,757.220 $9,500.000 $8,000.000 $15,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 4.000 $2,000.000 $1,560.000 $2,290.920 $3,203.950 $1,500.000 $1,400.000 $3,500.000
PIPE (PVC) (SCH 80) (4 IN)
LF 2,271.000 $125.000 $12.000 $71.560 $25.560 $75.000 $20.000 $80.000
REMOV STR (BRIDGE 1000 FT OR GREATER)
EA 1.000 $1,500,000.000 $2,000,000.000 $400,000.000 $1,446,068.190 $1,505,000.000 $1,000,000.000 $2,200,000.000
REMOV STR (PIPE)
EA 2.000 $400.000 $785.000 $14.440 $715.900 $1,500.000 $2,100.000 $1,500.000
REMOVE STR (CONC)
EA 2.000 $750.000 $13,500.000 $14,172.090 $1,581.810 $25,000.000 $10,500.000 $40,000.000
REMOV STR (SMALL FENCE)
LF 4,366.000 $4.000 $3.000 $2.960 $2.110 $2.000 $5.000 $2.000
MOBILIZATION
LS 1.000 $2,000,000.000 $1,700,000.000 $3,130,000.000 $3,250,000.000 $500,000.000 $2,600,000.000 $3,800,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 38.000 $2,500.000 $2,000.000 $378.880 $2,968.510 $5,000.000 $2,100.000 $3,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 520.000 $35.000 $35.000 $31.000 $33.350 $39.280 $49.500 $45.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 1,000.000 $50.000 $68.000 $45.000 $65.680 $125.670 $72.600 $145.000
ROCK FILTER DAMS (REMOVE)
LF 1,520.000 $10.000 $10.000 $8.000 $10.000 $21.610 $10.560 $7.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 400.000 $25.000 $25.000 $27.000 $25.000 $37.980 $31.680 $45.000
CONSTRUCTION EXITS (REMOVE)
SY 400.000 $7.000 $12.000 $8.000 $12.000 $8.720 $10.560 $10.000
CONSTRUCTION PERIMETER FENCE
LF 1,499.000 $40.000 $3.500 $4.000 $3.500 $5.000 $6.600 $5.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 11,839.000 $3.000 $3.000 $2.900 $2.900 $3.040 $3.760 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 11,839.000 $1.000 $0.750 $0.600 $0.750 $0.510 $1.120 $0.500
CONSTRUCTING DETOURS
SY 2,111.000 $50.000 $75.000 $70.410 $68.490 $75.000 $132.000 $75.000
DRIVEWAYS (SURF TREAT)
SY 1,204.000 $50.000 $28.000 $12.000 $21.830 $35.000 $60.000 $45.000
RUMBLE STRIPS (SHOULDER)
LF 7,742.000 $0.150 $0.790 $0.750 $0.190 $0.200 $0.700 $0.500
RUMBLE STRIPS (CENTERLINE)
LF 3,828.000 $0.400 $0.790 $0.750 $0.400 $0.400 $1.430 $0.750
MTL W-BEAM GD FEN (TIM POST)
LF 550.000 $25.000 $28.000 $26.250 $26.250 $29.500 $39.530 $50.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $3,000.000 $1,875.000 $1,785.000 $1,800.000 $2,135.000 $2,488.200 $2,500.000
REMOVE METAL BEAM GUARD FENCE
LF 780.000 $8.000 $2.000 $2.000 $2.250 $2.000 $3.300 $4.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,000.000 $3,200.000 $2,990.000 $3,100.000 $3,200.000 $3,894.000 $3,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $400.000 $262.000 $250.000 $200.000 $150.000 $330.000 $600.000
WIRE FENCE (TY A)
LF 4,062.000 $20.000 $7.650 $20.000 $16.000 $17.000 $16.500 $6.000
GATE (TY 1)
EA 1.000 $1,500.000 $1,185.000 $2,000.000 $2,500.000 $2,700.000 $1,650.000 $2,000.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 3.000 $210.000 $342.000 $225.000 $250.000 $225.000 $429.000 $300.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $600.000 $689.000 $590.000 $550.000 $590.000 $865.920 $700.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 3.000 $700.000 $920.000 $815.000 $750.000 $815.000 $1,156.320 $1,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 4.000 $950.000 $1,028.000 $725.000 $693.780 $725.000 $1,292.280 $900.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 11.000 $450.000 $435.000 $345.000 $300.000 $345.000 $547.800 $400.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 3.000 $575.000 $564.000 $475.000 $421.230 $475.000 $708.840 $600.000
IN SM RD SN SUP&AM (RAIL MOUNT)
EA 1.000 $2,100.000 $4,100.000 $4,000.000 $3,500.000 $4,000.000 $5,148.000 $5,000.000
RELOCATE SM RD SN SUP&AM TY TWT
EA 1.000 $400.000 $415.000 $285.000 $285.000 $285.000 $521.400 $400.000
REMOVE SM RD SN SUP&AM
EA 21.000 $100.000 $110.000 $90.000 $86.660 $90.000 $138.600 $100.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 91.000 $20.000 $25.000 $24.000 $24.000 $25.000 $19.800 $30.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 9.000 $25.000 $35.000 $34.000 $25.000 $25.500 $36.300 $30.000
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
EA 3.000 $75.000 $131.000 $125.000 $125.000 $125.000 $165.000 $150.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 13,611.000 $0.200 $0.270 $0.260 $0.600 $1.000 $1.320 $1.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 13,012.000 $0.200 $0.270 $0.260 $0.600 $1.000 $1.320 $1.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 366.000 $3.000 $6.830 $6.500 $4.000 $5.000 $6.600 $5.000
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 1,000.000 $2.500 $4.460 $4.250 $4.000 $4.000 $5.280 $4.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 6,141.000 $0.750 $1.790 $1.700 $1.250 $1.500 $1.980 $1.500
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 7,608.000 $0.750 $1.790 $1.700 $1.250 $1.500 $1.980 $1.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 137.000 $10.000 $0.700 $1.000 $0.490 $0.020 $3.350 $0.750
REFL PAV MRK TY II (W) 4" (BRK)
LF 170.000 $0.150 $0.790 $0.750 $0.250 $1.000 $1.320 $1.000
REFL PAV MRK TY II (W) 4" (DOT)
LF 198.000 $0.500 $0.710 $0.680 $0.250 $1.000 $1.320 $1.500
REFL PAV MRK TY II (W) 4" (SLD)
LF 13,759.000 $0.150 $0.340 $0.320 $0.200 $0.300 $0.400 $0.500
REFL PAV MRK TY II (Y) 4" (SLD)
LF 13,598.000 $0.150 $0.340 $0.320 $0.200 $0.300 $0.400 $0.500
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 840.000 $0.500 $0.500 $0.480 $0.750 $1.000 $1.320 $1.000
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 23,303.000 $0.350 $0.440 $0.420 $0.500 $0.500 $0.660 $0.750
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 23,054.000 $0.350 $0.440 $0.420 $0.500 $0.500 $0.660 $0.750
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 49.000 $12.000 $13.910 $13.250 $15.160 $15.000 $19.800 $25.000
REFL PAV MRKR TY I-C
EA 96.000 $3.750 $5.250 $5.000 $4.550 $4.000 $5.280 $5.000
REFL PAV MRKR TY II-A-A
EA 289.000 $3.500 $5.250 $5.000 $4.550 $4.000 $5.280 $5.000
ELIM EXT PAV MRK & MRKS (4")
LF 6,695.000 $0.250 $0.320 $0.300 $0.760 $0.300 $0.400 $1.000
PAV SURF PREP FOR MRK (4")
LF 21,151.000 $0.500 $0.010 $0.010 $0.510 $0.200 $0.260 $0.500
D-GR HMA TY-B PG64-22
TON 3,527.000 $85.000 $116.000 $112.000 $100.000 $118.000 $114.000 $115.000
D-GR HMA TY-D PG70-22 (LEVEL-UP)
TON 1,814.000 $90.000 $137.000 $141.000 $130.000 $147.000 $140.000 $130.000
TACK COAT
GAL 3,521.000 $4.000 $5.000 $5.000 $5.000 $5.000 $5.200 $5.000
D-GR HMA TY-D PG 64-22 (EXEMPT)
TON 75.000 $100.000 $209.000 $343.000 $343.000 $349.000 $215.000 $375.000
SP MIXES SP-C SAC-A PG70-22
TON 2,519.000 $90.000 $138.000 $138.000 $138.000 $144.000 $137.000 $130.000
TACK COAT
GAL 2,290.000 $4.000 $5.000 $5.000 $5.050 $5.000 $5.650 $5.000
TIP TESTING(DRILL SHAFT)
EA 4.000 $5,100.000 $6,185.000 $6,750.000 $6,820.380 $6,000.000 $11,000.000 $10,000.000
TEMP CONSTRUCTION ACCESS
LS 1.000 $150,000.000 $500,000.000 $1,979,440.640 $1,676,870.850 $1,500,000.000 $2,000,000.000 $20,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $15,000.000 $19,539.130 $11,655.770 $18,500.000 $24,000.000 $10,000.000
TMA (STATIONARY)
DAY 154.000 $200.000 $150.000 $269.300 $176.200 $125.000 $365.000 $175.000
TMA (MOBILE OPERATION)
DAY 26.000 $200.000 $500.000 $758.720 $656.530 $300.000 $365.000 $175.000
REML & DISPL DRIFTWOOD & DEBRIS
LS 1.000 $10,000.000 $40,000.000 $10,728.660 $11,965.430 $40,000.000 $265,000.000 $50,000.000
Totals: $26,829,047.200 $27,844,040.210 $31,549,115.845 $32,631,886.537 $33,405,558.890 $34,455,966.120 $39,268,429.150