HOPKINS FM0275 (6393-52-001)

Items: 21

County: HOPKINS
Length: N/A
Highway: FM0275
District: PARIS
Control Number: 6393-52-001
DBE Goal: N/A
Project: RMC - 639352001
Guaranty: N/A
Time: 43 W
Engineer's Estimate: $376,489.50
Date: 03/04/2022 (4 years ago)
Contract Number: N/A
Type: SAFETY STRUCTURE WIDENING
Mail/Deliver Bids To: N/A
JESSE HERRERA
DUSTIN LYDAY
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (2)
E
Engineer's Estimate
$376,489.50
$445,448.00
Over/Under Est: 18.32% $68,958.50
Over/Under Est: 80.88% $304,516.50
Amt Left: 52.88% $235,558.00

Bid Items & Bid Tabulations

21 Total 0 of 21
HOPKINS  |  FM0275  |  PARIS  |  6393-52-001  |  03/04/2022  |  $376,489.50  |  RMC - 639352001  |  SAFETY STRUCT WIDENING  |  43 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
HIGHWAY 19 CONSTRUCTION LLC
DIGG COMMERCIAL, LLC
PREPARING ROW
STA 4.000 $2,500.000 $2,500.000 $4,000.000
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 710.000 $25.000 $30.000 $180.000
STRAW/HAY MLCH SEED(PERM)(RURAL)(SANDY)
SY 2,350.000 $0.650 $1.000 $2.000
VEGETATIVE WATERING
MG 13.000 $30.000 $100.000 $54.000
CUT & RESTORING PAV
SY 292.000 $225.000 $350.000 $389.000
TRENCH EXCAVATION PROTECTION
LF 590.000 $10.000 $10.000 $1.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 12.000 $675.000 $550.000 $1,250.000
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 24.000 $725.000 $650.000 $1,460.000
RC PIPE (CL III)(24 IN)
LF 118.000 $70.000 $98.000 $137.000
RC PIPE (CL III)(48 IN)
LF 206.000 $165.000 $214.000 $323.000
HEADWALL (CH - PW - S) (DIA= 48 IN)
EA 4.000 $13,000.000 $12,000.000 $10,308.000
WINGWALL (PW - 1) (HW=4 FT)
EA 6.000 $10,000.000 $8,500.000 $11,700.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 2.000 $750.000 $1,100.000 $2,300.000
REMOV STR (WINGWALL)
EA 6.000 $800.000 $1,000.000 $3,000.000
REMOV STR (PIPE)
EA 3.000 $2,500.000 $5,000.000 $4,330.000
MOBILIZATION
LS 1.000 $33,272.000 $40,000.000 $63,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $3,500.000 $5,000.000 $4,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 840.000 $30.000 $45.000 $56.000
ROCK FILTER DAMS (REMOVE)
LF 840.000 $10.000 $10.000 $8.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 22.000 $50.000 $45.000 $50.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 16.000 $200.000 $10.000 $500.000
Totals: $376,489.500 $445,448.000 $681,006.000