HOPKINS FM 900 (0680-05-014)

Items: 80

County: HOPKINS
Length: N/A
Highway: FM 900
District: PARIS
Control Number: 0680-05-014
DBE Goal: N/A
Project: STP 2B23(053)HES
Guaranty: N/A
Time: 223 WORKING DAYS
Engineer's Estimate: $2,950,739.80
Date: 08/02/2023 (2 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
JESSE HERRERA
DUSTIN LYDAY
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$2,950,739.80
$3,356,595.02
Over/Under Est: 13.75% $405,855.22
Over/Under Est: 24.09% $710,873.66
Amt Left: 9.09% $305,018.44
Over/Under Est: 50.73% $1,496,780.39
Amt Left: 32.5% $1,090,925.17
Delta: -21.46% -$785,906.73
Subcontractor Percentage Amount
BAHENA CONSTRUCTION CO., INC. 15.31% $508,669.45
CATOCON, INC. 6.02% $200,012.42
STRIPING TECHNOLOGY, L.P. 5.18% $172,103.71
MURRAY CONSTRUCTION 1.96% $65,120.32
DUSTIN ALLEN, INC. 0.89% $29,569.94
PANOLA SIGN & BARRICADE, INC. 0.76% $25,250.74
A-CORE CONCRETE CUTTING OF TEXAS, INC. 0.49% $16,280.08
Total: 30.61% $1,017,006.66

Bid Items & Bid Tabulations

80 Total 0 of 80
HOPKINS  |  FM 900  |  PARIS  |  0680-05-014  |  08/02/2023  |  $2,950,739.80  |  STP 2B23(053)HES  |  HAZARD ELIM & SAFETY  |  223 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
A. K. GILLIS & SONS, LLC
HIGHWAY 19 CONSTRUCTION LLC
D. L. LENNON INCORPORATED - CONTRACTOR
PREPARING ROW
STA 241.380 $550.000 $928.560 $1,000.000 $1,024.560
REMOVING CONC (DRIVEWAYS)
SY 18.000 $17.000 $15.000 $25.000 $15.000
EXCAVATION (CHANNEL)
CY 27.000 $30.000 $100.000 $25.000 $40.000
SUBGRADE WIDENING (ORD COMP)
STA 241.380 $190.000 $253.210 $300.000 $1,000.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY A)
CY 135.000 $35.000 $100.000 $30.000 $15.000
BACKFILL (TY A)
STA 241.380 $250.000 $301.230 $500.000 $950.000
ROAD GRADER WORK (ORD COMP)
STA 241.380 $220.000 $253.210 $350.000 $1,000.000
BROADCAST SEED (TEMP) (WARM)
SY 26,820.000 $0.250 $0.180 $0.400 $0.150
BROADCAST SEED (TEMP) (COOL)
SY 26,820.000 $0.250 $0.180 $0.400 $0.150
STRAW/HAY MLCH SEED(PERM)(RURAL)(SANDY)
SY 53,640.000 $0.500 $0.450 $0.750 $0.310
VEGETATIVE WATERING
MG 322.000 $20.000 $3.190 $10.000 $100.000
ASPH (AC-20XP)
GAL 32,077.000 $6.000 $5.480 $4.540 $12.000
ASPH (RC-250)
GAL 19,525.000 $6.000 $5.910 $4.980 $12.000
AGGR(TY-B GR-5 SAC-A)
CY 498.000 $130.000 $146.250 $180.000 $350.000
AGGR(TY-PB GR-3 SAC-A)
CY 664.000 $100.000 $199.520 $210.000 $350.000
CUT & RESTORING PAV
SY 194.000 $100.000 $100.000 $250.000 $100.000
CUT & RESTORE ASPH PAVING
SY 34.000 $200.000 $100.000 $250.000 $100.000
FLOWABLE BACKFILL
CY 91.000 $250.000 $250.000 $280.000 $250.000
TRENCH EXCAVATION PROTECTION
LF 42.000 $24.000 $15.000 $10.000 $15.000
TEMPORARY SPL SHORING
SF 2,084.000 $55.000 $10.000 $55.000 $55.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 89.000 $250.000 $283.690 $180.000 $315.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 20.000 $450.000 $309.800 $180.000 $825.000
RIPRAP (MOW STRIP)(4 IN)
CY 53.000 $500.000 $550.000 $550.000 $550.000
CONC BOX CULV (5 FT X 3 FT)
LF 84.000 $700.000 $675.000 $750.000 $675.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 10.000 $700.000 $600.000 $600.000 $600.000
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
LF 8.000 $1,000.000 $650.000 $1,000.000 $650.000
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 8.000 $700.000 $750.000 $1,000.000 $750.000
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
LF 22.000 $1,000.000 $900.000 $1,000.000 $900.000
CONC BOX CULV (9 FT X 3 FT)(EXTEND)
LF 8.000 $1,200.000 $1,000.000 $1,300.000 $1,000.000
RC PIPE (CL III)(12 IN)
LF 110.000 $40.000 $50.000 $75.000 $50.000
RC PIPE (CL III)(18 IN)
LF 492.000 $50.000 $56.000 $80.000 $56.000
RC PIPE (CL III)(24 IN)
LF 16.000 $70.000 $90.000 $110.000 $90.000
RC PIPE (CL III)(30 IN)
LF 32.000 $160.000 $125.000 $180.000 $125.000
HEADWALL (CH - FW - 0) (DIA= 30 IN)
EA 2.000 $3,000.000 $6,500.000 $5,500.000 $6,500.000
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 2.000 $6,500.000 $7,500.000 $5,500.000 $7,500.000
WINGWALL (FW - 0) (HW=4 FT)
EA 4.000 $10,000.000 $8,000.000 $15,000.000 $8,000.000
WINGWALL (FW - S) (HW=4 FT)
EA 3.000 $10,000.000 $8,500.000 $16,000.000 $8,500.000
WINGWALL (PW - 2) (HW=3 FT)
EA 2.000 $8,000.000 $8,500.000 $10,000.000 $8,500.000
WINGWALL (PW - 2) (HW=4 FT)
EA 1.000 $8,000.000 $12,000.000 $12,000.000 $12,000.000
WINGWALL (PW - 2) (HW=6 FT)
EA 2.000 $15,000.000 $20,000.000 $16,000.000 $20,000.000
SET (TY II) (12 IN) (RCP) (6: 1) (P)
EA 16.000 $600.000 $550.000 $630.000 $550.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 62.000 $1,000.000 $800.000 $800.000 $800.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 8.000 $1,500.000 $1,500.000 $1,325.000 $1,500.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 2.000 $2,200.000 $2,800.000 $2,500.000 $2,800.000
REMOV & RE - LAY PIPE (24 IN)
LF 22.000 $50.000 $45.000 $100.000 $45.000
CLEAN EXIST CULVERTS
EA 10.000 $3,000.000 $1,000.000 $1,000.000 $1,000.000
REMOV STR (WINGWALL)
EA 12.000 $1,500.000 $1,000.000 $1,000.000 $1,000.000
REMOV STR (PIPE)
LF 556.000 $35.000 $10.000 $50.000 $10.000
REMOV STR (BOX CULVERT)
LF 94.000 $160.000 $75.000 $100.000 $75.000
MOBILIZATION
LS 1.000 $261,265.000 $215,272.000 $300,000.000 $65,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $2,500.000 $7,800.000 $2,500.000 $9,189.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 900.000 $35.000 $50.000 $45.000 $40.000
ROCK FILTER DAMS (REMOVE)
LF 900.000 $8.000 $10.000 $10.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,140.000 $3.000 $5.000 $4.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,140.000 $1.000 $2.000 $1.000 $1.000
DRIVEWAYS (CONC)
SY 18.000 $115.000 $100.000 $150.000 $135.000
DRIVEWAYS (ACP)
SY 194.000 $45.000 $61.430 $45.000 $102.000
TURNOUTS (ACP)
SY 375.000 $80.000 $99.400 $102.000 $107.500
DRIVEWAYS (BASE)
SY 902.000 $15.000 $30.530 $45.000 $60.000
MTL W-BEAM GD FEN (STEEL POST)
LF 700.000 $30.000 $26.000 $33.000 $27.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,000.000 $2,850.000 $3,500.000 $2,800.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 20.000 $160.000 $280.000 $450.000 $300.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 1.000 $200.000 $300.000 $550.000 $400.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 87.000 $600.000 $565.000 $850.000 $750.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $850.000 $800.000 $1,100.000 $1,200.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $800.000 $980.000 $900.000 $1,600.000
REMOVE SM RD SN SUP&AM
EA 89.000 $80.000 $75.000 $100.000 $100.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 28.000 $75.000 $60.000 $45.000 $55.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 76.000 $5.000 $10.000 $10.000 $10.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,000.000 $1.500 $2.250 $1.000 $5.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 25.000 $7.000 $10.000 $23.000 $10.000
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 48,894.000 $1.000 $1.000 $1.060 $1.000
REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL)
LF 13,533.000 $1.000 $1.000 $1.100 $1.000
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
LF 31,874.000 $1.000 $1.000 $1.060 $1.000
ELIM EXT PAV MRK & MRKS (4")
LF 420.000 $75.000 $2.000 $4.000 $2.000
TEMP TRAF SIGNALS
EA 2.000 $30,000.000 $15,000.000 $7,500.000 $6,000.000
D-GR HMA TY-B PG64-22
TON 6,246.000 $115.000 $170.520 $163.000 $167.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 4,752.000 $4.500 $11.000 $7.000 $11.000
PREFORMED CENTERLINE RUMBLE STRIP
LF 4,752.000 $4.500 $5.000 $7.000 $5.000
TMA (STATIONARY)
DAY 125.000 $300.000 $150.000 $250.000 $350.000
Totals: $2,950,739.800 $3,356,595.050 $3,661,613.460 $4,447,520.193