PREPARING ROW
|
STA
|
125.760
|
$875.000
|
$500.410
|
$931.130
|
$1,200.000
|
$2,000.000
|
$3,000.000
|
|
|
DISPOSAL OF WATER WELLS
|
EA
|
1.000
|
$2,600.000
|
$3,500.000
|
$1,000.000
|
$3,500.000
|
$5,000.000
|
$7,500.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
55.000
|
$15.000
|
$19.000
|
$14.000
|
$24.000
|
$20.000
|
$35.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
564.000
|
$16.200
|
$19.000
|
$14.000
|
$14.500
|
$15.000
|
$23.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
22.000
|
$5.200
|
$15.000
|
$10.000
|
$30.000
|
$15.000
|
$25.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (11")
|
SY
|
443.000
|
$4.500
|
$19.000
|
$9.000
|
$12.000
|
$20.000
|
$8.000
|
|
|
REMOV STAB BASE AND ASPH PAV (10"-18")
|
SY
|
2,499.000
|
$5.000
|
$19.500
|
$9.230
|
$12.000
|
$13.000
|
$11.000
|
|
|
OBLITERATING ABANDONED ROAD
|
STA
|
9.390
|
$1,500.000
|
$7,300.000
|
$1,712.780
|
$1,650.000
|
$5,500.000
|
$1,000.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
35,377.000
|
$9.000
|
$7.500
|
$8.800
|
$5.750
|
$6.000
|
$9.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
32,253.000
|
$8.100
|
$8.250
|
$8.580
|
$7.000
|
$12.000
|
$8.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
44,168.000
|
$0.100
|
$0.060
|
$0.050
|
$0.120
|
$0.110
|
$0.100
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
44,168.000
|
$0.100
|
$0.060
|
$0.060
|
$0.130
|
$0.110
|
$0.100
|
|
|
STRAW/HAY MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
88,335.000
|
$0.300
|
$0.190
|
$0.200
|
$0.380
|
$0.350
|
$0.200
|
|
|
VEGETATIVE WATERING
|
MG
|
530.000
|
$8.000
|
$24.000
|
$9.520
|
$2.000
|
$12.000
|
$24.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
19,577.000
|
$1.750
|
$0.890
|
$1.000
|
$1.050
|
$1.500
|
$1.200
|
|
|
FL BS (CMP IN PLC)(TY A GR 4)(FNAL POS)
|
CY
|
4,948.000
|
$40.000
|
$62.000
|
$57.030
|
$63.000
|
$45.000
|
$71.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 4) (6")
|
SY
|
28,002.000
|
$8.500
|
$10.000
|
$9.560
|
$10.500
|
$13.000
|
$13.000
|
|
|
FL BS (RDWY DEL) (TY A GR 4)
|
TON
|
117.000
|
$35.000
|
$33.000
|
$45.210
|
$50.000
|
$55.000
|
$41.000
|
|
|
FL BS (COMP IN PLACE)(TY A)(GR 4)(11")
|
SY
|
919.000
|
$11.000
|
$19.000
|
$27.150
|
$23.000
|
$32.000
|
$27.000
|
|
|
REWORK BS MTL (TY C) (11") (ORD COMP)
|
SY
|
9,533.000
|
$2.750
|
$6.000
|
$2.280
|
$2.000
|
$5.000
|
$3.500
|
|
|
CEMENT
|
TON
|
839.000
|
$135.000
|
$145.000
|
$135.000
|
$170.000
|
$150.000
|
$180.000
|
|
|
CEMENT TREAT (NEW BASE) (6")
|
SY
|
28,603.000
|
$1.750
|
$2.100
|
$1.790
|
$1.750
|
$2.000
|
$3.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
29,203.000
|
$3.150
|
$2.800
|
$2.250
|
$1.800
|
$2.000
|
$3.000
|
|
|
CEMENT TREAT (MX EXST MTL & NW BS)(8")
|
SY
|
13,651.000
|
$2.600
|
$2.800
|
$2.140
|
$2.250
|
$2.000
|
$3.500
|
|
|
PRIME COAT (MC-30)
|
GAL
|
5,786.000
|
$4.000
|
$3.860
|
$4.450
|
$4.500
|
$6.000
|
$6.000
|
|
|
PRIME COAT (RC-250)
|
GAL
|
3,639.000
|
$4.500
|
$7.500
|
$5.400
|
$5.000
|
$6.000
|
$5.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
29,696.000
|
$3.200
|
$4.380
|
$4.390
|
$3.250
|
$3.750
|
$4.000
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
108.000
|
$105.000
|
$85.000
|
$120.130
|
$165.000
|
$90.000
|
$150.000
|
|
|
AGGR (TY-B GR-4 OR TY-L GR-4 SAC-B)
|
CY
|
241.000
|
$120.000
|
$90.000
|
$124.080
|
$125.000
|
$90.000
|
$110.000
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
399.000
|
$120.000
|
$90.000
|
$121.230
|
$120.000
|
$90.000
|
$110.000
|
|
|
D-GR HMA TY-C PG64-22
|
TON
|
2,219.000
|
$77.000
|
$91.500
|
$89.500
|
$100.000
|
$98.000
|
$97.000
|
|
|
D-GR HMA TY-D SAC-A PG64-22
|
TON
|
6,584.000
|
$82.000
|
$91.650
|
$89.650
|
$100.000
|
$98.000
|
$97.000
|
|
|
D-GR HMA TY-D PG64-22(LEVEL-UP)
|
TON
|
1,487.000
|
$61.000
|
$99.650
|
$97.650
|
$115.000
|
$110.000
|
$107.000
|
|
|
PLANE ASPH CONC PAV (0" TO 5")
|
SY
|
6,717.000
|
$2.000
|
$4.170
|
$1.770
|
$3.350
|
$4.000
|
$3.000
|
|
|
PLAN & TEXT ASPH CONC PAV (2" TO 7")
|
SY
|
2,847.000
|
$2.500
|
$5.650
|
$2.540
|
$6.000
|
$5.000
|
$3.500
|
|
|
CUT & RESTORING PAV
|
SY
|
58.000
|
$103.000
|
$150.000
|
$150.000
|
$135.000
|
$100.000
|
$85.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
308.000
|
$240.000
|
$200.000
|
$200.000
|
$240.000
|
$350.000
|
$130.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
854.000
|
$3.500
|
$15.000
|
$15.000
|
$4.500
|
$10.000
|
$5.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,022.000
|
$30.000
|
$55.000
|
$45.000
|
$40.000
|
$45.000
|
$55.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
90.000
|
$425.000
|
$425.000
|
$425.000
|
$485.000
|
$425.000
|
$580.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
80.800
|
$425.000
|
$425.000
|
$425.000
|
$440.000
|
$425.000
|
$580.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
112.000
|
$125.000
|
$105.000
|
$189.390
|
$155.000
|
$150.000
|
$130.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
630.000
|
$150.000
|
$105.000
|
$205.700
|
$130.000
|
$150.000
|
$130.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
276.000
|
$405.000
|
$425.000
|
$425.000
|
$490.000
|
$425.000
|
$580.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
660.000
|
$23.000
|
$26.000
|
$30.000
|
$40.000
|
$35.000
|
$36.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
30.000
|
$60.000
|
$45.000
|
$45.000
|
$55.000
|
$45.000
|
$78.000
|
|
|
CONC BOX CULV (8 FT X 7 FT)
|
LF
|
267.000
|
$675.000
|
$750.000
|
$750.000
|
$640.000
|
$800.000
|
$800.000
|
|
|
CONC BOX CULV (9 FT X 8 FT)
|
LF
|
138.000
|
$900.000
|
$1,000.000
|
$1,000.000
|
$790.000
|
$1,100.000
|
$1,000.000
|
|
|
CONC BOX CULV(5'X 6.5')
|
LF
|
53.000
|
$480.000
|
$650.000
|
$650.000
|
$665.000
|
$650.000
|
$800.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
392.000
|
$39.000
|
$45.000
|
$45.000
|
$42.000
|
$45.000
|
$53.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
536.000
|
$62.000
|
$60.000
|
$60.000
|
$55.000
|
$55.000
|
$78.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
50.000
|
$74.000
|
$75.000
|
$75.000
|
$80.000
|
$75.000
|
$125.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
378.000
|
$108.000
|
$100.000
|
$100.000
|
$95.000
|
$100.000
|
$170.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 36 IN)
|
EA
|
2.000
|
$10,920.000
|
$7,500.000
|
$7,500.000
|
$11,000.000
|
$9,000.000
|
$6,500.000
|
|
|
WINGWALL (PW - 1) (HW=11 FT)
|
EA
|
1.000
|
$40,110.000
|
$36,000.000
|
$36,000.000
|
$35,000.000
|
$35,000.000
|
$60,000.000
|
|
|
WINGWALL (PW - 1) (HW=12 FT)
|
EA
|
1.000
|
$46,935.000
|
$39,000.000
|
$39,000.000
|
$36,000.000
|
$40,000.000
|
$70,000.000
|
|
|
WINGWALL (PW - 2) (HW=10 FT)
|
EA
|
1.000
|
$30,030.000
|
$25,000.000
|
$25,000.000
|
$27,000.000
|
$28,000.000
|
$45,000.000
|
|
|
WINGWALL (PW - 2) (HW=12 FT)
|
EA
|
1.000
|
$48,615.000
|
$40,000.000
|
$40,000.000
|
$45,000.000
|
$40,000.000
|
$72,000.000
|
|
|
WINGWALL (SW - 0) (HW=9 FT)
|
EA
|
2.000
|
$9,765.000
|
$12,000.000
|
$12,000.000
|
$7,000.000
|
$9,000.000
|
$15,000.000
|
|
|
SET (TY II) (12 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$465.000
|
$475.000
|
$475.000
|
$520.000
|
$500.000
|
$800.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$540.000
|
$550.000
|
$550.000
|
$555.000
|
$500.000
|
$900.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
36.000
|
$550.000
|
$625.000
|
$625.000
|
$600.000
|
$575.000
|
$900.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$720.000
|
$750.000
|
$750.000
|
$755.000
|
$700.000
|
$950.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
28.000
|
$880.000
|
$950.000
|
$950.000
|
$950.000
|
$900.000
|
$950.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,800.000
|
$2,000.000
|
$2,000.000
|
$1,500.000
|
$1,800.000
|
$1,300.000
|
|
|
CAST-IN-PLACE TRENCH DRAIN
|
LF
|
50.000
|
$350.000
|
$600.000
|
$275.000
|
$265.000
|
$500.000
|
$360.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$1,000.000
|
$900.000
|
$900.000
|
$1,500.000
|
$1,000.000
|
$1,100.000
|
|
|
REMOV STR (PIPE)
|
LF
|
30.000
|
$16.500
|
$15.000
|
$15.000
|
$44.000
|
$15.000
|
$26.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
54.000
|
$57.000
|
$50.000
|
$50.000
|
$100.000
|
$55.000
|
$78.000
|
|
|
REMOV STR (PIPE)
|
EA
|
4.000
|
$285.000
|
$200.000
|
$200.000
|
$650.000
|
$500.000
|
$370.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$429,000.000
|
$226,900.000
|
$331,004.440
|
$300,000.000
|
$600,000.000
|
$610,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$5,000.000
|
$4,009.000
|
$4,300.000
|
$3,000.000
|
$8,000.000
|
$15,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
640.000
|
$35.000
|
$65.000
|
$37.500
|
$70.000
|
$35.000
|
$40.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
640.000
|
$10.000
|
$10.000
|
$7.000
|
$38.000
|
$10.000
|
$3.500
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
178.000
|
$21.000
|
$19.000
|
$16.000
|
$22.000
|
$25.000
|
$25.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
178.000
|
$11.000
|
$8.000
|
$5.000
|
$12.000
|
$5.000
|
$2.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
132.000
|
$200.000
|
$50.000
|
$100.900
|
$200.000
|
$125.000
|
$75.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
14,179.000
|
$2.700
|
$1.350
|
$2.000
|
$3.500
|
$3.200
|
$3.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
14,179.000
|
$1.200
|
$0.420
|
$0.500
|
$2.200
|
$1.000
|
$1.000
|
|
|
ONE-WAY TRAF CONT (PILOT CAR)
|
HR
|
400.000
|
$88.000
|
$35.000
|
$50.740
|
$100.000
|
$50.000
|
$110.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
1.000
|
$6,800.000
|
$5,800.000
|
$5,500.000
|
$7,500.000
|
$30,000.000
|
$7,000.000
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
240.000
|
$12.000
|
$50.000
|
$25.000
|
$25.000
|
$50.000
|
$37.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
120.000
|
$10.000
|
$50.000
|
$25.000
|
$14.000
|
$10.000
|
$32.000
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
480.000
|
$12.000
|
$1.000
|
$25.000
|
$25.000
|
$10.000
|
$25.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
27.000
|
$3.500
|
$25.000
|
$25.000
|
$50.000
|
$20.000
|
$27.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
326.000
|
$80.000
|
$100.000
|
$85.000
|
$85.000
|
$90.000
|
$110.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,758.000
|
$29.000
|
$23.330
|
$26.090
|
$34.000
|
$55.000
|
$35.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
2,337.500
|
$22.000
|
$23.850
|
$22.750
|
$26.000
|
$26.000
|
$24.000
|
|
|
SHORT RADIUS
|
LF
|
37.500
|
$60.000
|
$40.000
|
$42.000
|
$50.000
|
$50.000
|
$44.000
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$875.000
|
$845.000
|
$975.000
|
$1,100.000
|
$1,100.000
|
$1,000.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
200.000
|
$23.500
|
$21.000
|
$27.000
|
$22.000
|
$25.000
|
$30.000
|
|
|
MTL THRIE-BEAM GD FEN (STEEL POST)
|
EA
|
16.000
|
$1,800.000
|
$2,200.000
|
$1,625.000
|
$2,150.000
|
$2,500.000
|
$1,700.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,175.000
|
$2.800
|
$3.000
|
$2.000
|
$2.200
|
$3.000
|
$2.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$200.000
|
$200.000
|
$400.000
|
$220.000
|
$300.000
|
$450.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
16.000
|
$270.000
|
$250.000
|
$300.000
|
$220.000
|
$300.000
|
$320.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
28.000
|
$2,230.000
|
$2,475.000
|
$2,775.000
|
$2,725.000
|
$2,700.000
|
$3,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
19.000
|
$323.000
|
$225.000
|
$300.000
|
$220.000
|
$300.000
|
$350.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
2.000
|
$12,500.000
|
$6,950.000
|
$11,300.000
|
$12,000.000
|
$12,000.000
|
$12,000.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$2,000.000
|
$1,100.000
|
$2,850.000
|
$2,200.000
|
$3,000.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,000.000
|
$600.000
|
$1,250.000
|
$550.000
|
$1,000.000
|
$1,000.000
|
|
|
WIRE FENCE (TY C)
|
LF
|
192.000
|
$11.200
|
$25.000
|
$10.000
|
$27.500
|
$30.000
|
$15.000
|
|
|
PIPE UNDERDRAINS (TY 7) (6")
|
LF
|
818.000
|
$30.000
|
$25.000
|
$26.380
|
$34.000
|
$50.000
|
$36.000
|
|
|
PIPE UNDERDRAINS (TY 8) (6")
|
LF
|
1,225.000
|
$35.000
|
$25.000
|
$26.380
|
$34.000
|
$50.000
|
$38.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 4
|
EA
|
5.000
|
$230.000
|
$155.000
|
$220.000
|
$225.000
|
$225.000
|
$220.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 4
|
EA
|
2.000
|
$260.000
|
$255.000
|
$270.000
|
$280.000
|
$300.000
|
$270.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
27.000
|
$510.000
|
$535.000
|
$520.000
|
$510.000
|
$500.000
|
$490.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
5.000
|
$590.000
|
$805.000
|
$695.000
|
$590.000
|
$600.000
|
$560.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
|
EA
|
1.000
|
$1,300.000
|
$720.000
|
$1,475.000
|
$1,025.000
|
$1,000.000
|
$980.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
2.000
|
$920.000
|
$1,400.000
|
$1,080.000
|
$1,085.000
|
$1,200.000
|
$1,100.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
2.000
|
$415.000
|
$500.000
|
$415.000
|
$380.000
|
$400.000
|
$360.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
34.000
|
$90.000
|
$100.000
|
$125.000
|
$70.000
|
$100.000
|
$70.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
17.000
|
$28.000
|
$16.000
|
$24.000
|
$16.500
|
$30.000
|
$31.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
67.000
|
$27.000
|
$29.000
|
$29.000
|
$22.000
|
$30.000
|
$31.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
10,707.000
|
$0.200
|
$0.250
|
$0.250
|
$0.280
|
$0.270
|
$0.250
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
10,960.000
|
$0.200
|
$0.250
|
$0.250
|
$0.280
|
$0.270
|
$0.250
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
240.000
|
$3.800
|
$5.000
|
$5.000
|
$5.500
|
$6.000
|
$5.500
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
3,248.000
|
$0.600
|
$1.000
|
$1.000
|
$1.100
|
$1.100
|
$1.100
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
51.000
|
$6.000
|
$8.000
|
$8.000
|
$8.800
|
$9.000
|
$9.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
4,006.000
|
$0.600
|
$1.000
|
$1.000
|
$1.100
|
$1.100
|
$1.100
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,595.000
|
$1.300
|
$1.350
|
$2.000
|
$1.200
|
$2.000
|
$0.800
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
929.000
|
$0.700
|
$1.000
|
$1.000
|
$1.100
|
$1.100
|
$1.100
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
96.000
|
$5.800
|
$6.000
|
$6.000
|
$6.600
|
$7.000
|
$6.500
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
4.000
|
$90.000
|
$140.000
|
$140.000
|
$155.000
|
$160.000
|
$150.000
|
|
REFL PAV MRK TY I (W)(WORD)(090MIL)
|
EA
|
4.000
|
$125.000
|
$160.000
|
$160.000
|
$175.000
|
$180.000
|
$170.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
|
EA
|
5.000
|
$30.000
|
$75.000
|
$75.000
|
$82.000
|
$100.000
|
$80.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
2,887.000
|
$0.200
|
$0.200
|
$0.200
|
$0.220
|
$0.220
|
$0.220
|
|
|
PAVEMENT SEALER 8"
|
LF
|
312.000
|
$0.400
|
$1.000
|
$1.000
|
$1.100
|
$1.100
|
$1.100
|
|
|
PAVEMENT SEALER 24"
|
LF
|
23.000
|
$2.000
|
$2.500
|
$2.500
|
$2.750
|
$3.000
|
$2.700
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
2.000
|
$26.000
|
$40.000
|
$40.000
|
$44.000
|
$45.000
|
$45.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
2.000
|
$31.000
|
$60.000
|
$60.000
|
$66.000
|
$65.000
|
$65.000
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
5.000
|
$14.400
|
$30.000
|
$30.000
|
$33.000
|
$35.000
|
$32.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
27,185.000
|
$0.300
|
$0.450
|
$0.450
|
$0.500
|
$0.500
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
1,720.000
|
$0.300
|
$0.700
|
$0.700
|
$0.780
|
$0.800
|
$0.750
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
19,941.000
|
$0.300
|
$0.450
|
$0.450
|
$0.500
|
$0.500
|
$0.500
|
|
REFL PAV MRKR TY I-C
|
EA
|
48.000
|
$3.300
|
$5.000
|
$5.000
|
$5.500
|
$6.000
|
$5.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
624.000
|
$2.800
|
$4.000
|
$4.000
|
$4.400
|
$5.000
|
$4.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
4,867.000
|
$0.300
|
$0.250
|
$1.250
|
$0.280
|
$0.270
|
$1.800
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
2,887.000
|
$0.300
|
$0.100
|
$0.100
|
$0.110
|
$0.120
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
312.000
|
$0.200
|
$0.200
|
$0.200
|
$0.220
|
$0.220
|
$0.200
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
23.000
|
$0.200
|
$1.000
|
$1.000
|
$1.100
|
$1.100
|
$1.100
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
2.000
|
$13.600
|
$20.000
|
$20.000
|
$22.000
|
$25.000
|
$22.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
2.000
|
$17.200
|
$40.000
|
$40.000
|
$44.000
|
$45.000
|
$44.000
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
5.000
|
$7.800
|
$30.000
|
$30.000
|
$33.000
|
$35.000
|
$32.000
|
|
|
GEOGRID BASE REINFORCEMENT (TY II)
|
SY
|
28,603.000
|
$1.750
|
$2.390
|
$1.790
|
$1.500
|
$3.000
|
$1.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$12,500.000
|
$17,500.000
|
$12,000.000
|
$18,000.000
|
$20,000.000
|
$18,000.000
|
|
|
DEAD END ROADWAY BARRICADE
|
LF
|
42.000
|
$125.000
|
$50.000
|
$50.000
|
$75.000
|
$300.000
|
$85.000
|
|
|
TMA (STATIONARY)
|
DAY
|
50.000
|
$210.000
|
$350.000
|
$150.000
|
$110.000
|
$300.000
|
$500.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
96.000
|
$80.000
|
$150.000
|
$100.000
|
$16.500
|
$30.000
|
$68.000
|
|
Totals: |
$4,947,041.150
|
$5,134,494.647
|
$5,162,106.208
|
$5,273,937.570
|
$6,175,536.710
|
$6,552,731.490
|