Show Job Controls
Bid Cobra

HOOD FM 167 (1598-01-024)

Items: 150

County: HOOD
Length: 9.1760 MILES
Highway: FM 167
District: FORT WORTH
Control Number: 1598-01-024
DBE Goal: 8.0%
Project: F 2025(873)
Guaranty: $100,000.00
Time: 334 WORKING DAYS
Engineer's Estimate: $14,523,093.89
Date: 07/02/2025 (11 months ago)
Contract Number: 7253207
Type: HAZARD ELIMINATION & SAFETY
Project ID: A00201583
Contract Type: Federal
Project Description: BRIDGE REPLACEMENT, WIDEN, REHAB, DRAINAGE, RUMBLE AND STRIPING
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$14,523,093.89
$14,553,381.79
Over/Under Est: 0.21% $30,287.90
Over/Under Est: 0.76% $109,676.88
Amt Left: 0.55% $79,388.98
Over/Under Est: 13.66% $1,984,512.41
Amt Left: 13.43% $1,954,224.51
Delta: -12.81% -$1,874,835.53
Over/Under Est: 32.45% $4,712,276.38
Amt Left: 32.17% $4,681,988.48
Delta: -16.52% -$2,727,763.97
Subcontractor Percentage Amount
NORTHEASTERN PAVERS, LLC 32.83% $4,777,875.24
COPPELL CONSTRUCTION CO., INC. 11.04% $1,606,693.35
JR WEST TEXAS CONCRETE LLC 8.77% $1,276,331.58
DUSTIN ALLEN, INC. 0.90% $130,980.44
TEXAS SHAFTS, INC. 0.73% $106,239.69
HERMANOS STEEL, LLC 0.73% $106,239.69
D. I. J. CONSTRUCTION, INC. 0.53% $77,132.92
G J SEEDING, LLC 0.16% $23,285.41
SK CONCRETE SERVICES LLC 0.06% $8,732.03
CHEROKEE SERVICES 0.05% $7,276.69
SCOTT DERR PAINTING CO, LLC 0.04% $5,821.35
Total: 55.84% $8,126,608.39

Bid Items & Bid Tabulations

150 Total 0 of 150
HOOD  |  FM 167  |  FORT WORTH  |  1598-01-024  |  07/02/2025  |  $14,523,093.89  |  F 2025(873)  |  HAZARD ELIM & SAFETY  |  334 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAY MILLS CONTRACTING, INCORPORATED
KNIFE RIVER CORPORATION - SOUTH
GREY SKY CONSTRUCTION LLC
INDUS ROAD & BRIDGE, INC.
PREPARING ROW
STA 208.000 $725.000 $1,500.000 $1,000.000 $7,000.000 $9,203.690
PREP ROW (TREE REMOVE) (0"-12" DIA)
EA 5.000 $500.000 $600.000 $740.000 $2,000.000 $600.000
PREP ROW (TREE REMOVE) (12"-24" DIA)
EA 3.000 $3,000.000 $750.000 $1,477.000 $3,500.000 $1,500.000
PREP ROW (TREE REMOVE) (24"-36" DIA)
EA 2.000 $3,000.000 $1,500.000 $1,931.000 $5,000.000 $2,600.000
REMOV CONC (MOWSTRIP)
LF 421.000 $15.000 $22.000 $25.000 $50.000 $22.000
REMOV CONC (RIPRAP)
CY 5.000 $80.000 $100.000 $170.000 $200.000 $120.000
REMOV CONC (DRIVEWAYS)
SY 2,128.000 $25.000 $27.000 $51.000 $20.000 $30.000
EXCAV (ROADWAY)
CY 11,190.000 $20.000 $25.000 $25.000 $20.000 $40.000
SUBGR WIDEN (DC)
SY 2,114.000 $50.000 $9.000 $20.000 $30.000 $22.000
EMBANK (FNL)(DC)(TY B)
CY 6,941.000 $50.000 $21.000 $25.000 $30.000 $20.000
BACKFILL (TY A)
STA 202.600 $400.000 $550.000 $248.000 $250.000 $395.000
BLADING
HR 40.000 $50.000 $250.000 $148.000 $150.000 $200.000
COMPOST MANUF TOPSOIL (4")
SY 35,649.000 $6.000 $2.000 $1.300 $4.000 $2.500
DRILL SEED (PERM_RURAL_CLAY)
AC 7.380 $850.000 $2,150.000 $875.000 $1,000.000 $740.000
DRILL SEED (TEMP_WARM)
AC 7.380 $850.000 $1,850.000 $705.000 $1,000.000 $740.000
DRILL SEED (TEMP_COOL)
AC 0.700 $850.000 $5,000.000 $1,265.000 $6,000.000 $740.000
STRAW/HAY MLCH SEED(TEMP_COOL)
AC 0.700 $1,500.000 $8,000.000 $5,440.000 $6,000.000 $1,200.000
VEGETATIVE WATERING
TGL 2,620.000 $30.000 $35.000 $1.000 $20.000 $1.000
PROOF ROLLING
HR 48.000 $130.000 $200.000 $93.000 $150.000 $160.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 5,179.000 $60.000 $80.000 $100.000 $70.000 $90.000
FL BS (RDWY DEL)(TY A GR 1-2)(FNAL POS)
CY 333.000 $50.000 $60.000 $100.000 $70.000 $100.000
REWORK BS MTL (TY C)(9”)(DENS CONT)
SY 2,036.000 $8.000 $15.000 $20.000 $6.000 $28.000
CEMENT
TON 401.000 $250.000 $280.000 $240.000 $350.000 $341.000
CEMENT TRT (EXIST MATL)(6")
SY 37,483.000 $4.250 $6.000 $4.000 $6.000 $5.000
ASPH (RC-250)
GAL 15,215.000 $8.500 $4.500 $8.500 $5.000 $9.000
AGGR (TY-B, GR-5)(SAC-B)
CY 428.000 $280.000 $135.000 $250.000 $350.000 $615.000
D-GR HMA TY-B PG64-22
TON 7,326.000 $175.000 $135.000 $143.000 $165.000 $142.000
D-GR HMA TY-D PG64-22
TON 4,394.000 $175.000 $135.000 $143.000 $185.000 $150.000
D-GR HMA TY-D PG64-22 (LEVEL-UP)
TON 6,038.000 $200.000 $190.000 $200.000 $185.000 $150.000
TACK COAT
GAL 15,140.000 $5.000 $0.010 $0.010 $6.000 $6.500
SP MIXES SP-C SAC-A PG70-28
TON 9,367.000 $200.000 $185.000 $194.000 $185.000 $200.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 800.000 $95.000 $120.000 $123.000 $100.000 $600.000
PLANE & TEXT ASPH CONC PAV(2" TO 4")
SY 44,051.000 $4.750 $3.750 $5.800 $6.000 $5.000
PLANE ASPH CONC PAV(11")
SY 732.000 $8.000 $24.000 $25.000 $30.000 $16.000
CUT & RESTORING PAV
SY 276.000 $70.000 $190.000 $350.000 $200.000 $230.000
CEM STABIL BKFL
CY 136.000 $250.000 $565.000 $310.000 $350.000 $260.000
TEMPORARY SPL SHORING
SF 3,596.000 $35.000 $34.000 $45.000 $85.000 $53.000
DRILL SHAFT (24 IN)
LF 600.000 $350.000 $305.000 $300.000 $250.000 $185.000
CL C CONC (ABUT)(HPC)
CY 30.000 $2,000.000 $2,800.000 $2,500.000 $1,500.000 $1,300.000
CL C CONC (CAP)(HPC)
CY 24.100 $2,000.000 $2,250.000 $2,500.000 $1,800.000 $1,900.000
CL C CONC (COLUMN)(HPC)
CY 18.000 $2,000.000 $2,250.000 $1,700.000 $2,000.000 $1,900.000
REINF CONC SLAB (SLAB BEAM)(HPC)
SF 4,846.000 $25.000 $42.250 $35.000 $25.000 $25.000
APPROACH SLAB
CY 76.000 $1,000.000 $1,350.000 $850.000 $1,000.000 $850.000
PRESTR CONC SLAB BEAM (4SB12)
LF 1,083.500 $200.000 $305.000 $250.000 $250.000 $250.000
PRESTR CONC SLAB BEAM (5SB12)
LF 98.500 $250.000 $345.000 $250.000 $250.000 $375.000
PENETRATING CONCRETE SURFACE TREATMENT
SY 414.000 $75.000 $17.000 $35.000 $25.000 $35.000
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 9.000 $500.000 $450.000 $1,000.000 $1,000.000 $320.000
RIPRAP (CONC)(4 IN)
CY 6.200 $700.000 $700.000 $1,022.000 $550.000 $550.000
RIPRAP (MOW STRIP)(4 IN)
CY 220.000 $600.000 $725.000 $559.000 $550.000 $700.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 100.000 $200.000 $135.000 $170.000 $150.000 $350.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 1,775.000 $190.000 $280.000 $186.000 $180.000 $220.000
CLEANING AND SEALING EXISTING JOINTS
LF 84.000 $80.000 $95.000 $110.000 $100.000 $35.000
RAIL (TY T223)(HPC)
LF 224.000 $150.000 $295.000 $160.000 $250.000 $140.000
ARMOR JOINT (SEALED)
LF 88.000 $150.000 $235.000 $190.000 $1,000.000 $270.000
CONC BOX CULV (5 FT X 3 FT)
LF 202.000 $525.000 $485.000 $368.000 $720.000 $420.000
CONC BOX CULV (6 FT X 4 FT)
LF 104.000 $800.000 $650.000 $1,035.000 $1,000.000 $620.000
CONC BOX CULV (8 FT X 4 FT)
LF 58.000 $945.000 $1,050.000 $780.000 $1,350.000 $800.000
CONC BOX CULV (8 FT X 8 FT)
LF 140.000 $1,250.000 $1,250.000 $955.000 $1,500.000 $950.000
CONC BOX CULV (10 FT X 5 FT)
LF 46.000 $1,600.000 $1,550.000 $1,144.000 $2,000.000 $1,250.000
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 70.000 $525.000 $800.000 $725.000 $1,000.000 $1,050.000
CONC BOX CULV (8 FT X 4 FT)(EXTEND)
LF 49.000 $945.000 $1,450.000 $851.000 $1,500.000 $1,250.000
CONC BOX CULV (8 FT X 8 FT)(EXTEND)
LF 78.000 $1,250.000 $1,800.000 $885.000 $1,650.000 $1,700.000
CONC BOX CULV (10 FT X 5 FT)(EXTEND)
LF 19.000 $1,600.000 $1,750.000 $1,155.000 $2,000.000 $1,890.000
RC PIPE (CL III)(18 IN)
LF 1,406.000 $120.000 $82.000 $73.850 $85.000 $68.000
RC PIPE (CL III)(24 IN)
LF 552.000 $130.000 $105.000 $170.500 $95.000 $185.000
RC PIPE (CL III)(30 IN)
LF 118.000 $160.000 $130.000 $227.000 $105.000 $220.000
RC PIPE (CL IV)(24 IN)
LF 248.000 $130.000 $120.000 $205.000 $110.000 $215.000
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 2.000 $13,000.000 $9,000.000 $10,245.000 $8,500.000 $11,000.000
WINGWALL (FW - 0) (HW=5 FT)
EA 1.000 $20,500.000 $10,000.000 $10,365.000 $12,500.000 $20,000.000
WINGWALL (PW - 2) (HW=4 FT)
EA 4.000 $14,000.000 $10,000.000 $9,570.000 $15,000.000 $30,000.000
WINGWALL (PW - 2) (HW=5 FT)
EA 3.000 $18,000.000 $17,000.000 $11,240.000 $16,500.000 $25,000.000
WINGWALL (PW - 2) (HW=6 FT)
EA 2.000 $22,500.000 $18,000.000 $12,950.000 $25,000.000 $35,000.000
WINGWALL (PW - 2) (HW=9 FT)
EA 2.000 $51,000.000 $18,000.000 $25,305.000 $45,000.000 $42,000.000
SET (TY I) (36 IN) (3: 1) (C)
EA 4.000 $7,500.000 $10,000.000 $14,205.000 $3,500.000 $22,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 80.000 $1,900.000 $1,500.000 $1,080.000 $1,000.000 $3,000.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 2.000 $2,400.000 $1,350.000 $2,273.000 $2,000.000 $2,900.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 6.000 $3,250.000 $1,500.000 $2,500.000 $2,000.000 $3,500.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 39.000 $2,200.000 $1,650.000 $2,841.000 $2,000.000 $3,600.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 4.000 $3,800.000 $2,550.000 $4,091.000 $3,000.000 $4,300.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(6:1) (P)
EA 4.000 $12,000.000 $12,750.000 $20,455.000 $12,000.000 $27,000.000
CLEAN EXIST CULVERTS
EA 11.000 $3,000.000 $3,700.000 $2,275.000 $2,500.000 $3,000.000
REMOV STR (SET)
EA 43.000 $894.620 $250.000 $740.000 $500.000 $1,000.000
REMOV STR (WINGWALL)
EA 8.000 $2,137.000 $1,150.000 $1,175.000 $2,500.000 $10,000.000
REMOV STR (PIPE)
LF 392.000 $50.830 $25.000 $45.450 $50.000 $50.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $70,000.000 $90,000.000 $70,000.000 $50,000.000 $130,000.000
REMOVE STR (DRIVEWAY CULVERT)
EA 49.000 $100.000 $250.000 $1,705.000 $500.000 $45.000
REMOVING ROCK RIPRAP
LF 10.000 $113.000 $85.000 $113.000 $100.000 $75.000
REMOV STR (MASONARY)
LF 126.000 $20.000 $25.000 $42.000 $100.000 $78.000
REMOV STR (WOOD STR)
LF 30.000 $30.000 $15.000 $75.000 $100.000 $45.000
MOBILIZATION
LS 1.000 $1,200,000.000 $1,150,000.000 $1,463,000.000 $1,500,000.000 $1,900,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 21.000 $9,500.000 $30,000.000 $10,000.000 $15,000.000 $35,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 42.000 $95.000 $125.000 $150.000 $150.000 $150.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $9,000.000 $20,000.000 $20,000.000 $20,000.000 $40,000.000
TMA (STATIONARY)
DAY 120.000 $280.000 $335.000 $300.000 $250.000 $400.000
ROCK FILTER DAMS (REMOVE)
LF 140.000 $15.000 $56.000 $63.000 $30.000 $70.000
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 100.000 $40.000 $33.000 $180.000 $50.000 $170.000
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
CY 100.000 $60.000 $60.000 $95.000 $50.000 $100.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 6,287.000 $4.500 $3.750 $8.650 $4.000 $7.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 6,287.000 $1.000 $2.250 $1.800 $2.000 $2.000
ROCK FILTER DAMS (INSTALL) (TY 2) 6:1
LF 140.000 $70.000 $74.000 $171.000 $30.000 $170.000
CONSTRUCTING DETOURS
SY 7,500.000 $70.000 $50.000 $75.000 $35.000 $125.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 5.000 $5,000.000 $6,500.000 $7,385.000 $9,500.000 $4,400.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 1,800.000 $60.000 $88.000 $102.000 $100.000 $120.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 5,000.000 $10.000 $18.000 $16.000 $20.000 $12.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 1,800.000 $15.000 $23.000 $23.000 $20.000 $14.000
INTERSECTIONS (ACP)
SY 974.000 $130.000 $185.000 $171.000 $55.000 $175.000
DRIVEWAYS (CONC)
SY 1,193.000 $100.000 $155.000 $126.000 $85.000 $185.000
DRIVEWAYS (ACP)
SY 941.000 $55.000 $56.000 $60.000 $45.000 $140.000
DRIVEWAYS (SURF TREAT)
SY 3,942.000 $40.000 $50.000 $30.000 $45.000 $36.000
TURNOUTS (ACP)
SY 592.000 $75.000 $95.000 $120.000 $55.000 $165.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 27,412.000 $0.250 $0.260 $0.350 $0.300 $0.200
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 14,779.000 $0.280 $0.260 $0.350 $0.300 $0.250
MTL W-BEAM GD FEN (TIM POST)
LF 1,780.500 $30.000 $28.000 $28.400 $30.000 $34.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $3,232.000 $2,550.000 $3,357.000 $1,850.000 $2,400.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 250.000 $40.000 $97.000 $99.000 $110.000 $130.000
REMOVE METAL BEAM GUARD FENCE
LF 1,105.000 $4.500 $3.500 $3.400 $3.000 $9.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $500.000 $278.000 $284.000 $500.000 $600.000
GUARDRAIL END TREATMENT (INSTALL)
EA 20.000 $3,500.000 $3,650.000 $3,700.000 $3,850.000 $4,300.000
GUARDRAIL END TREATMENT (REMOVE)
EA 6.000 $500.000 $280.000 $285.000 $1,500.000 $2,100.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 50.000 $2,000.000 $2,700.000 $2,102.000 $4,500.000 $3,800.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $1,500.000 $3,450.000 $995.000 $2,500.000 $2,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $9,500.000 $15,500.000 $9,640.000 $30,000.000 $12,000.000
GATE (INSTALL)(6'X16')
EA 2.000 $3,000.000 $2,500.000 $2,275.000 $20,000.000 $1,000.000
WIRE FENCE (TY C)
LF 50.000 $50.000 $50.000 $52.250 $20.000 $22.000
WIRE FENCE (SPECIAL)
LF 50.000 $75.000 $60.000 $53.400 $100.000 $95.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 3.000 $350.000 $675.000 $680.000 $1,500.000 $700.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 36.000 $340.000 $325.000 $312.000 $1,500.000 $350.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 2.000 $370.000 $325.000 $324.000 $1,500.000 $550.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 5.000 $370.000 $900.000 $910.000 $1,500.000 $800.000
RELOCATE EXISTING MAILBOX
EA 46.000 $500.000 $625.000 $615.000 $1,100.000 $400.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 33.000 $850.000 $750.000 $761.000 $1,500.000 $750.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 20.000 $1,000.000 $925.000 $926.000 $1,500.000 $900.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T-EXAL)
EA 2.000 $710.000 $1,100.000 $1,091.000 $1,500.000 $1,000.000
REMOVE SM RD SN SUP&AM
EA 4.000 $130.000 $170.000 $171.000 $500.000 $170.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 48.000 $25.500 $17.000 $17.000 $100.000 $23.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 21.000 $35.000 $32.000 $32.000 $100.000 $35.000
INSTL OM ASSM (OM-2X)(WC)GND
EA 17.000 $70.000 $73.000 $75.000 $100.000 $95.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 82,622.000 $0.800 $0.010 $0.910 $1.000 $1.300
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 39,686.000 $0.800 $0.010 $0.910 $1.000 $1.300
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 4,129.000 $1.500 $1.200 $1.140 $5.000 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 1,986.000 $1.500 $1.200 $1.140 $5.000 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,986.000 $1.500 $1.700 $1.140 $5.000 $1.200
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 650.000 $2.000 $15.000 $7.390 $20.000 $12.000
REFL PAV MRK TY I (W)(RR XING)(100MIL)
EA 2.000 $1,017.000 $1,300.000 $852.300 $1,500.000 $900.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 41,311.000 $1.350 $0.850 $1.140 $1.000 $0.900
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 665.000 $1.500 $0.950 $2.270 $1.000 $1.300
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 39,686.000 $1.350 $0.850 $1.140 $1.000 $0.700
REFL PAV MRKR TY II-A-A
EA 531.000 $7.900 $9.500 $6.820 $6.000 $7.000
FULL - WIDTH MOWING
CYC 5.000 $3,500.000 $3,200.000 $4,545.000 $5,000.000 $3,800.000
LITTER REMOVAL
CYC 15.000 $2,500.000 $2,700.000 $2,000.000 $5,000.000 $2,400.000
Totals: $14,523,093.890 $14,553,381.790 $14,632,770.770 $16,507,606.300 $19,235,370.270
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
RAILROAD FLAGGING: RAILROAD FORCE ACCOUNT WORK (NON-PART) $25,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $35,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $100,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $7,000.00
Total: $167,000.00