|
|
PREPARING ROW
|
STA
|
98.100
|
$2,000.000
|
$375.580
|
$1,000.000
|
$2,000.000
|
$6,600.000
|
$500.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
1,155.000
|
$8.000
|
$7.450
|
$18.500
|
$22.000
|
$11.500
|
$15.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
228.000
|
$10.000
|
$7.060
|
$9.800
|
$30.000
|
$10.400
|
$10.000
|
|
|
REMOVING CONC (MISC)
|
SY
|
10.800
|
$15.000
|
$54.900
|
$18.500
|
$70.000
|
$105.000
|
$80.000
|
|
|
REMOVING CONC (WHEELCHAIR RAMP)
|
SY
|
19.000
|
$25.000
|
$31.180
|
$23.500
|
$40.000
|
$31.000
|
$34.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
34,806.700
|
$8.000
|
$7.110
|
$16.500
|
$15.000
|
$14.300
|
$15.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
192.390
|
$20.000
|
$26.590
|
$20.000
|
$18.000
|
$18.500
|
$40.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
1,627.700
|
$8.000
|
$8.360
|
$13.000
|
$11.000
|
$19.700
|
$9.000
|
|
|
BLOCK SODDING
|
SY
|
14,145.550
|
$2.000
|
$5.030
|
$4.350
|
$3.800
|
$5.550
|
$9.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
36,878.090
|
$0.200
|
$0.200
|
$0.270
|
$0.160
|
$0.130
|
$1.000
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
36,878.090
|
$0.100
|
$0.180
|
$0.260
|
$0.160
|
$0.130
|
$1.000
|
|
|
VEGETATIVE WATERING
|
MG
|
1,717.000
|
$15.000
|
$39.310
|
$27.000
|
$20.000
|
$38.000
|
$85.000
|
|
|
SPRINKLING (HOT PAVMT)
|
MG
|
1,000.000
|
$10.000
|
$37.570
|
$27.000
|
$10.000
|
$59.000
|
$60.000
|
|
|
FL BS (CMP IN PLC) (TY D GR 4) (1")
|
SY
|
70,682.010
|
$1.500
|
$1.040
|
$2.200
|
$2.000
|
$1.950
|
$6.450
|
|
|
REWRK BS MATL (TY B)(10")(DENS CONT)
|
SY
|
43,758.000
|
$6.000
|
$2.220
|
$6.350
|
$2.700
|
$3.750
|
$3.000
|
|
|
CEMENT
|
TON
|
596.380
|
$150.000
|
$133.010
|
$165.000
|
$190.000
|
$137.000
|
$200.000
|
|
|
CEM TRT (MX EXST MTL & NW BS)(DC)(6")
|
SY
|
70,682.010
|
$2.000
|
$4.580
|
$2.650
|
$2.000
|
$2.450
|
$5.600
|
|
|
PRIME COAT (MC-30)
|
GAL
|
14,136.400
|
$4.000
|
$3.520
|
$4.000
|
$5.500
|
$3.750
|
$5.000
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1H)
|
GAL
|
4,794.150
|
$3.000
|
$3.150
|
$3.500
|
$3.300
|
$3.350
|
$5.000
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
6,269.270
|
$3.000
|
$5.010
|
$3.300
|
$3.300
|
$3.200
|
$5.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
41,822.570
|
$3.000
|
$2.900
|
$3.300
|
$3.300
|
$4.050
|
$5.000
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
885.130
|
$150.000
|
$199.340
|
$135.000
|
$110.000
|
$135.550
|
$145.000
|
|
|
D-GR HMA TY-B PG70-28
|
TON
|
16,011.230
|
$85.000
|
$103.040
|
$90.000
|
$92.000
|
$143.650
|
$120.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG70-28
|
TON
|
8,091.070
|
$115.000
|
$145.260
|
$138.000
|
$140.000
|
$174.000
|
$200.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
|
SY
|
213.500
|
$50.000
|
$57.050
|
$80.000
|
$150.000
|
$71.000
|
$85.000
|
|
|
CEM STABIL BKFL
|
CY
|
190.300
|
$200.000
|
$95.030
|
$235.000
|
$200.000
|
$232.000
|
$200.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
0.800
|
$1,000.000
|
$1,732.940
|
$1,600.000
|
$3,200.000
|
$1,580.000
|
$3,000.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
14.900
|
$450.000
|
$774.920
|
$480.000
|
$800.000
|
$475.000
|
$3,000.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
466.900
|
$450.000
|
$305.120
|
$455.000
|
$500.000
|
$445.000
|
$1,500.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
312.000
|
$250.000
|
$292.020
|
$425.000
|
$400.000
|
$422.000
|
$625.310
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
666.000
|
$80.000
|
$120.910
|
$85.500
|
$80.000
|
$84.000
|
$125.060
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
2.000
|
$3,000.000
|
$10,946.900
|
$3,200.000
|
$16,000.000
|
$3,160.000
|
$4,689.810
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (C)
|
EA
|
6.000
|
$4,000.000
|
$6,877.490
|
$4,800.000
|
$15,000.000
|
$4,750.000
|
$7,034.720
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
24.000
|
$1,500.000
|
$2,061.480
|
$1,300.000
|
$1,000.000
|
$1,265.000
|
$1,875.920
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
10.000
|
$2,000.000
|
$1,585.860
|
$3,200.000
|
$2,700.000
|
$920.000
|
$234.490
|
|
|
REMOV STR (PIPE)
|
EA
|
2.000
|
$2,000.000
|
$11,143.480
|
$215.000
|
$1,000.000
|
$210.000
|
$2,762.630
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$448,000.000
|
$663,928.720
|
$800,000.000
|
$870,000.000
|
$1,033,000.000
|
$840,800.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
17.000
|
$8,000.000
|
$4,662.140
|
$13,000.000
|
$25,000.000
|
$21,980.000
|
$5,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
70.000
|
$25.000
|
$32.430
|
$33.000
|
$40.000
|
$75.000
|
$200.750
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
70.000
|
$8.000
|
$19.670
|
$13.000
|
$7.000
|
$25.000
|
$147.020
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
148.000
|
$20.000
|
$22.260
|
$44.500
|
$30.000
|
$37.000
|
$40.060
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
148.000
|
$10.000
|
$8.970
|
$11.500
|
$5.000
|
$15.000
|
$23.180
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,330.000
|
$3.000
|
$2.800
|
$3.150
|
$4.000
|
$5.300
|
$13.670
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,330.000
|
$1.000
|
$1.060
|
$0.640
|
$1.000
|
$2.550
|
$2.760
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,290.000
|
$8.000
|
$4.760
|
$4.100
|
$6.500
|
$11.000
|
$30.400
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,290.000
|
$3.000
|
$0.790
|
$0.840
|
$2.000
|
$1.750
|
$4.640
|
|
|
CONSTRUCTING DETOURS
|
SY
|
20,107.000
|
$35.000
|
$31.940
|
$27.500
|
$48.000
|
$39.200
|
$75.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
189.400
|
$30.000
|
$45.780
|
$37.500
|
$35.000
|
$36.900
|
$120.000
|
|
|
INTERSECTIONS (CONC)
|
SY
|
607.840
|
$60.000
|
$98.760
|
$160.000
|
$150.000
|
$136.000
|
$300.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
9,055.480
|
$60.000
|
$68.510
|
$88.000
|
$100.000
|
$79.000
|
$130.000
|
|
|
TURNOUTS (ACP)
|
SY
|
139.380
|
$30.000
|
$62.650
|
$42.500
|
$70.000
|
$170.000
|
$100.000
|
|
|
CONC SIDEWALKS (6")
|
SY
|
3,428.240
|
$60.000
|
$54.190
|
$69.000
|
$40.000
|
$52.700
|
$95.000
|
|
|
CURB RAMPS (TY 1)
|
SY
|
49.490
|
$200.000
|
$171.570
|
$130.000
|
$60.000
|
$170.000
|
$700.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
2.000
|
$300.000
|
$237.890
|
$240.000
|
$250.000
|
$260.000
|
$350.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
3.000
|
$400.000
|
$290.750
|
$295.000
|
$300.000
|
$275.000
|
$420.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
10.000
|
$500.000
|
$650.220
|
$655.000
|
$650.000
|
$735.000
|
$950.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
4.000
|
$500.000
|
$507.490
|
$510.000
|
$510.000
|
$600.000
|
$700.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
22.000
|
$525.000
|
$560.360
|
$565.000
|
$560.000
|
$630.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$600.000
|
$755.950
|
$760.000
|
$760.000
|
$890.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
|
EA
|
1.000
|
$1,000.000
|
$1,030.850
|
$1,000.000
|
$1,100.000
|
$1,300.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
|
EA
|
2.000
|
$1,100.000
|
$930.400
|
$940.000
|
$930.000
|
$1,130.000
|
$1,300.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
36.000
|
$80.000
|
$79.300
|
$80.000
|
$80.000
|
$150.000
|
$90.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
26.000
|
$80.000
|
$84.580
|
$96.000
|
$95.000
|
$185.000
|
$140.690
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
12,123.000
|
$0.400
|
$0.130
|
$0.130
|
$0.130
|
$0.130
|
$0.340
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
69,418.000
|
$0.400
|
$0.130
|
$0.130
|
$0.130
|
$0.130
|
$0.310
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
1,030.000
|
$1.000
|
$0.260
|
$0.270
|
$0.270
|
$0.260
|
$0.630
|
|
|
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
|
LF
|
928.000
|
$3.000
|
$1.060
|
$1.050
|
$1.060
|
$1.050
|
$4.490
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
543.000
|
$4.000
|
$2.110
|
$2.150
|
$2.120
|
$2.110
|
$9.380
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
20.000
|
$100.000
|
$26.430
|
$26.500
|
$26.500
|
$26.350
|
$132.880
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
20.000
|
$100.000
|
$37.000
|
$37.500
|
$37.100
|
$36.890
|
$132.880
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
6,960.000
|
$0.400
|
$0.130
|
$0.130
|
$0.130
|
$0.130
|
$0.340
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
112,610.000
|
$0.400
|
$0.130
|
$0.130
|
$0.130
|
$0.130
|
$0.310
|
|
|
WK ZN PAV MRK NON-REMOV (Y)24"(SLD)
|
LF
|
1,000.000
|
$4.000
|
$2.110
|
$2.150
|
$2.120
|
$2.110
|
$9.680
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
3,220.000
|
$3.000
|
$3.170
|
$3.200
|
$3.180
|
$3.160
|
$6.640
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
3,638.000
|
$2.000
|
$1.040
|
$1.050
|
$1.000
|
$1.100
|
$5.320
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
7,721.000
|
$2.000
|
$1.040
|
$1.050
|
$1.000
|
$1.150
|
$5.220
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
515.000
|
$1.000
|
$0.850
|
$0.850
|
$0.850
|
$0.840
|
$2.340
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
23,527.000
|
$0.400
|
$0.420
|
$0.430
|
$0.420
|
$0.420
|
$0.520
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
6,003.000
|
$0.500
|
$0.630
|
$0.640
|
$0.640
|
$0.630
|
$0.750
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
3,604.000
|
$0.400
|
$0.420
|
$0.430
|
$0.420
|
$0.420
|
$0.550
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
29,201.000
|
$0.400
|
$0.420
|
$0.430
|
$0.420
|
$0.420
|
$0.520
|
|
PREFAB PAV MRK TY C (W) (12") (SLD)
|
LF
|
488.000
|
$7.000
|
$9.940
|
$10.000
|
$9.960
|
$9.910
|
$13.520
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
207.000
|
$12.000
|
$19.880
|
$20.000
|
$19.930
|
$19.820
|
$31.270
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
8.000
|
$200.000
|
$317.180
|
$320.000
|
$318.000
|
$316.210
|
$351.740
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
8.000
|
$300.000
|
$449.340
|
$455.000
|
$450.500
|
$447.970
|
$390.820
|
|
PREFAB PAV MRK TY C (Y) (24") (SLD)
|
LF
|
500.000
|
$10.000
|
$21.150
|
$21.500
|
$21.200
|
$21.080
|
$23.450
|
|
PREFAB PAV MRK TY C (Y) (MED NOSE)
|
EA
|
4.000
|
$300.000
|
$84.580
|
$85.500
|
$84.800
|
$84.320
|
$8,285.330
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
719.000
|
$3.000
|
$3.170
|
$3.200
|
$3.180
|
$3.160
|
$6.640
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
330.000
|
$3.000
|
$3.170
|
$3.200
|
$3.180
|
$3.160
|
$6.640
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
154,661.000
|
$0.600
|
$0.010
|
$0.640
|
$0.530
|
$1.050
|
$0.750
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
815.000
|
$1.000
|
$2.110
|
$1.050
|
$1.060
|
$2.100
|
$1.560
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
754.000
|
$2.000
|
$3.170
|
$2.150
|
$2.120
|
$3.150
|
$3.130
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
947.000
|
$4.000
|
$6.340
|
$4.250
|
$3.180
|
$6.350
|
$6.250
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
20.000
|
$100.000
|
$52.860
|
$105.000
|
$53.000
|
$53.000
|
$78.160
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
20.000
|
$200.000
|
$63.440
|
$105.000
|
$53.000
|
$63.000
|
$78.160
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
488.000
|
$3.000
|
$2.110
|
$2.150
|
$2.120
|
$2.110
|
$1.560
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
707.000
|
$6.000
|
$4.230
|
$4.250
|
$4.240
|
$4.220
|
$3.130
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
8.000
|
$16.000
|
$37.010
|
$37.500
|
$37.100
|
$36.890
|
$62.530
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
8.000
|
$16.000
|
$63.440
|
$64.000
|
$63.600
|
$63.240
|
$62.530
|
|
|
PAV SURF PREP FOR MRK (MED NOSE)
|
EA
|
4.000
|
$20.000
|
$19.030
|
$19.000
|
$19.080
|
$18.970
|
$468.980
|
|
|
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
1.000
|
$600.000
|
$792.960
|
$2,100.000
|
$1,100.000
|
$1,580.000
|
$598.060
|
|
|
FULL - WIDTH MOWING
|
CYC
|
3.000
|
$3,000.000
|
$1,447.480
|
$1,700.000
|
$2,100.000
|
$2,420.000
|
$2,990.300
|
|
|
LITTER REMOVAL
|
CYC
|
3.000
|
$2,000.000
|
$993.270
|
$3,400.000
|
$1,800.000
|
$1,655.000
|
$5,980.610
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$12,000.000
|
$10,572.740
|
$10,500.000
|
$15,000.000
|
$23,500.000
|
$18,000.000
|
|
|
TMSP RADAR SPEED CONTROL MONITOR
|
EA
|
2.000
|
$8,000.000
|
$9,728.240
|
$10,500.000
|
$12,000.000
|
$12,400.000
|
$20,000.000
|
|
|
TMA (STATIONARY)
|
EA
|
4.000
|
$10,000.000
|
$39,647.780
|
$53,500.000
|
$15,000.000
|
$63,300.000
|
$20,000.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
15.000
|
$250.000
|
$1,025.260
|
$1,100.000
|
$900.000
|
$950.000
|
$3,500.000
|
|
Totals: |
$6,848,581.532
|
$7,499,584.295
|
$8,382,785.036
|
$8,856,225.386
|
$10,554,667.169
|
$12,344,261.830
|