HOCKLEY US 385 (0130-07-033)

Items: 101

County: HOCKLEY
Length: N/A
Highway: US 385
District: LUBBOCK
Control Number: 0130-07-033
DBE Goal: 0.0%
Project: C 130-7-33
Guaranty: N/A
Time: 136 WORKING DAYS
Engineer's Estimate: $13,680,902.18
Date: 03/06/2024 (2 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
ALEJANDRO MENDOZA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$13,680,902.18
$17,579,693.94
Over/Under Est: 28.5% $3,898,791.76
$20,810,556.76
Over/Under Est: 52.11% $7,129,654.58
Amt Left: 18.38% $3,230,862.82
Subcontractor Percentage Amount
W. S. CONSTRUCTION COMPANY 2.87% $502,237.98
INDUSTRIAL FABRICS, INC. 2.31% $404,240.33
TRP CONSTRUCTION GROUP, LLC 2.27% $397,240.49
TEX OP CONSTRUCTION, LP 1.51% $264,243.68
LMN TRANSPORT 0.86% $150,496.40
BARRICADES UNLIMITED 0.33% $57,748.62
DK CONTRACTING, LLC 0.31% $54,248.70
LMSE TRUCKING, LLC 0.29% $50,748.79
V-TECH ENVIROMENTAL SERVICES 0.17% $29,749.29
Total: 10.92% $1,910,954.28

Bid Items & Bid Tabulations

101 Total 0 of 101
HOCKLEY  |  US 385  |  LUBBOCK  |  0130-07-033  |  03/06/2024  |  $13,680,902.18  |  C 130-7-33  |  SURF/ROADWAY RESTOR  |  136 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DUININCK, INC.
A. L. HELMCAMP, INC.
REMOVING CONC (MEDIANS)
SY 878.000 $100.000 $27.500 $30.000
REMOVING CONC (DRIVEWAYS)
SY 2,380.000 $30.000 $29.000 $40.000
SUBGRADE WIDENING (DENS CONT)
STA 111.120 $450.000 $2,100.000 $1,500.000
BACKFILL (TY B)
STA 115.450 $210.000 $295.000 $450.000
BLADING
STA 115.450 $210.000 $62.500 $400.000
PROOF ROLLING
HR 20.000 $130.000 $225.000 $250.000
REWORK BS MTL (TY C)(4")(ORD COMP)
SY 67,484.540 $5.000 $4.700 $8.900
PRIME COAT (MC-30)
GAL 18,787.000 $7.000 $5.750 $6.000
EMULS ASPH (EROSN CONT)(CSS-1H)
GAL 17,067.000 $5.000 $4.400 $6.000
FOG SEAL (CSS-1H)
GAL 9,994.000 $5.000 $5.200 $5.000
AGGR(TY-PB GR-4 SAC-B)
CY 256.000 $250.000 $385.000 $450.000
ASPH (CSS-1H)
GAL 20,203.000 $5.000 $4.350 $5.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 4,457.090 $100.000 $80.000 $115.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(18")
SY 1,000.000 $250.000 $180.000 $360.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
SY 891.420 $60.000 $40.000 $45.000
PLANE ASPH CONC PAV(0" TO 1")
SY 1,566.000 $10.000 $19.500 $14.000
PLANE ASPH CONC PAV(4" TO 6")
SY 67,484.540 $6.000 $6.700 $9.000
PLANE ASPH CONC PAV (2")
SY 67,484.540 $5.000 $3.400 $4.000
ADJUSTING MANHOLES
EA 14.000 $2,200.000 $1,800.000 $2,000.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 36.000 $1,300.000 $1,200.000 $1,500.000
MOBILIZATION
LS 1.000 $1,243,718.380 $1,700,000.000 $1,800,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $10,000.000 $36,000.000 $31,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 111.110 $40.000 $60.500 $55.000
CONSTRUCTION EXITS (REMOVE)
SY 111.110 $13.000 $18.000 $18.000
SANDBAGS FOR EROSION CONTROL
EA 530.000 $20.000 $6.050 $25.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 800.000 $10.000 $6.050 $6.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 400.000 $1.000 $2.400 $1.500
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 1,500.000 $10.000 $8.450 $13.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 750.000 $1.000 $3.000 $1.500
INTERSECTIONS (ACP)
SY 3,277.400 $80.000 $110.000 $190.000
DRIVEWAYS (CONC)
SY 2,380.000 $160.000 $165.000 $160.000
DRIVEWAYS (ACP)
SY 14,515.000 $80.000 $145.000 $140.000
TURNOUTS (ACP)
SY 932.000 $150.000 $215.000 $210.000
CONC MEDIAN
SY 878.000 $110.000 $180.000 $170.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 15.000 $350.000 $450.000 $500.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 9.000 $550.000 $490.000 $550.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 26.000 $750.000 $995.000 $1,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 16.000 $905.000 $875.000 $1,100.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $1,050.000 $1,000.000 $1,200.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $1,100.000 $1,300.000 $1,400.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $2,000.000 $1,300.000 $1,400.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 1.000 $2,200.000 $1,500.000 $1,600.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 2.000 $1,000.000 $840.000 $900.000
REMOVE SM RD SN SUP&AM
EA 19.000 $125.000 $180.000 $120.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 14,906.000 $0.500 $0.300 $0.350
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 143,094.000 $0.600 $0.240 $0.300
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 7,249.000 $0.600 $0.480 $0.360
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 648.000 $5.000 $4.850 $4.000
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 51.000 $50.000 $90.500 $130.000
WK ZN PAV MRK NON-REMOV (W)(RR XING)
EA 12.000 $50.000 $300.000 $320.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 20,576.000 $0.500 $0.300 $0.350
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 270,590.000 $0.400 $0.240 $0.300
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,035.000 $2.250 $1.800 $0.800
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 6,106.000 $2.500 $1.800 $0.800
WK ZN PAV MRK NON-REMOV (W) (LNDP ARW)
EA 4.000 $50.000 $240.000 $165.000
REFL PAV MRK TY I (W)6"(LNDP)(100MIL)
LF 114.000 $2.000 $1.500 $2.500
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 279.000 $2.000 $2.400 $2.700
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,679.000 $2.000 $1.800 $1.700
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
EA 10.000 $500.000 $360.000 $440.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 6,200.000 $0.750 $1.100 $1.200
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 27,165.000 $0.750 $0.910 $1.200
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 9,290.000 $0.750 $1.100 $1.200
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 49,761.000 $0.750 $0.910 $1.200
PREFAB PAV MRK TY B (W)(8")(SLD)
LF 274.000 $10.000 $12.000 $14.000
PREFAB PAV MRK TY B (W)(24")(SLD)
LF 108.000 $25.000 $30.000 $43.000
PREFAB PAV MRK TY B (W)(ARROW)
EA 2.000 $300.000 $725.000 $370.000
PREFAB PAV MRK TY B (Y)(6")(SLD)
LF 286.000 $15.000 $12.000 $12.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 2,924.000 $12.000 $15.500 $13.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 34.000 $300.000 $270.000 $290.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 2.000 $345.000 $605.000 $650.000
PREFAB PAV MRK TY C (W) (RR XING)
EA 5.000 $700.000 $845.000 $675.000
REFL PAV MRKR TY I-C
EA 464.000 $5.000 $6.050 $5.000
REFL PAV MRKR TY II-A-A
EA 1,583.000 $6.000 $6.050 $5.100
ELIM EXT PAV MRK & MRKS (6")
LF 237,775.000 $1.100 $0.650 $0.250
ELIM EXT PAV MRK & MRKS (8")
LF 3,354.000 $1.250 $0.660 $0.250
ELIM EXT PAV MRK & MRKS (24")
LF 558.000 $3.000 $3.000 $0.550
ELIM EXT PAV MRK & MRKS (ARROW)
EA 46.000 $200.000 $66.500 $18.000
ELIM EXT PAV MRK & MRKS (RR XING)
EA 6.000 $500.000 $180.000 $75.000
PAV SURF PREP FOR MRK (6")
LF 286.000 $1.250 $2.400 $0.300
PAV SURF PREP FOR MRK (8")
LF 274.000 $1.000 $2.400 $0.350
PAV SURF PREP FOR MRK (24")
LF 3,032.000 $2.750 $1.800 $0.450
PAV SURF PREP FOR MRK (ARROW)
EA 36.000 $150.000 $42.500 $7.000
PAV SURF PREP FOR MRK (RR XING)
EA 5.000 $200.000 $120.000 $41.000
PAV SURF PREP FOR MRK (MED NOSE)
EA 10.000 $150.000 $120.000 $32.000
FULL - WIDTH MOWING
CYC 2.000 $5,500.000 $2,400.000 $15,000.000
LITTER REMOVAL
CYC 5.000 $2,250.000 $1,900.000 $12,000.000
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 4.000 $1,350.000 $5,000.000 $10,000.000
STORM SEWER CLEANING (ALL SIZES)
LF 1,000.000 $15.000 $36.500 $40.000
REINFORCED FAB FOR ASPH PVMNT OVERLAYS
SY 57,310.050 $6.500 $7.550 $7.250
ASPH FOR REINF FAB (PG76-28)
GAL 18,728.000 $6.500 $4.300 $5.500
REINFORCED FAB FOR ASPH PVMNT (INSTALL)
SY 67,484.540 $3.250 $1.150 $1.500
D-GR HMA TY-B PG76-28
TON 28,094.000 $140.000 $180.000 $240.000
TACK COAT
GAL 16,861.000 $5.000 $2.200 $5.200
STONE-MTRX-ASPH SMA-D SAC-A PG76-28
TON 7,970.000 $170.000 $268.000 $300.000
TACK COAT
GAL 97.000 $5.000 $4.000 $15.000
TOM-C PG76-28 SAC-A
TON 3,297.000 $190.000 $312.000 $325.000
TACK COAT
GAL 66.000 $5.000 $4.000 $15.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 480.000 $50.000 $150.000 $100.000
TMA (STATIONARY)
DAY 232.000 $210.000 $300.000 $500.000
TMA (MOBILE OPERATION)
DAY 30.000 $315.000 $1,200.000 $850.000
TEMP SPEED MONITOR SYS
EA 1.000 $16,500.000 $9,100.000 $20,000.000
Totals: $13,680,902.180 $17,579,693.980 $20,810,556.768