Show Job Controls
Bid Cobra

HILL SH0081 (6384-29-001)

Items: 29

County: HILL
Length: N/A
Highway: SH0081
District: WACO
Control Number: 6384-29-001
DBE Goal: N/A
Project: RMC - 638429001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $598,854.00
Date: 01/07/2022 (4 years ago)
Contract Number: N/A
Type: BRIDGE PREVENTATIVE MAINTENANCE
Mail/Deliver Bids To: N/A
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (3)
E
Engineer's Estimate
$598,854.00
$532,172.00
Over/Under Est: -11.13% -$66,682.00
Over/Under Est: 23.7% $141,931.50
Amt Left: 39.2% $208,613.50
Over/Under Est: 123.16% $737,568.00
Amt Left: 151.13% $804,250.00
Delta: -80.41% -$595,636.50

Bid Items & Bid Tabulations

29 Total 0 of 29
HILL  |  SH0081  |  WACO  |  6384-29-001  |  01/07/2022  |  $598,854.00  |  RMC - 638429001  |  BRIDGE PREVENT MAINT  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BECK-REIT & SONS, LTD.
STRUCTURAL INTEGRITY GROUP LLC
RAGLE CONSTRUCTION, INC.
REMOVING CONC (RIPRAP)
SY 159.000 $20.000 $50.000 $153.000 $16.000
EXCAVATION (CHANNEL)
CY 60.000 $15.000 $100.000 $148.000 $200.000
EXCAVATION (ROADWAY AND CHANNEL)
CY 210.000 $30.000 $50.000 $205.000 $200.000
EMBANKMENT (ORIGINAL)(ORD COMP)(TY D)
CY 75.000 $40.000 $50.000 $86.000 $50.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
CY 205.000 $50.000 $50.000 $67.000 $50.000
FLOWABLE BACKFILL
CY 64.500 $200.000 $250.000 $340.000 $220.000
CL C CONC (PILE ENCASEMENT)
CY 14.500 $3,000.000 $1,500.000 $3,225.000 $3,500.000
CL C CONC (MISC)
CY 3.700 $1,000.000 $1,000.000 $3,225.000 $3,500.000
CONC STR REPR(RAPID DECK REP(FULL DPT))
SF 13.500 $200.000 $1,500.000 $495.000 $1,000.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 548.000 $200.000 $150.000 $163.000 $75.000
CONC STR REPAIR (STANDARD)
SF 45.000 $200.000 $200.000 $400.000 $250.000
RIPRAP (CONC)(5 IN)
CY 33.000 $450.000 $1,000.000 $1,225.000 $550.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 71.000 $160.000 $150.000 $255.000 $150.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 503.000 $180.000 $150.000 $230.000 $160.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 66.000 $20.000 $50.000 $50.000 $90.000
CLEANING AND SEALING EXIST JOINTS(CL5)
LF 72.000 $20.000 $50.000 $50.000 $94.000
STR STEEL (PEDESTAL)
LB 1,379.000 $25.000 $30.000 $24.000 $50.000
GABIONS (GALV)
CY 233.000 $400.000 $250.000 $490.000 $400.000
RAISING EXIST STRUCT
LS 1.000 $40,000.000 $36,666.000 $16,750.000 $200,000.000
MOBILIZATION
LS 1.000 $44,359.000 $52,111.000 $50,000.000 $130,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $3,000.000 $1,000.000 $2,400.000 $46,800.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 300.000 $4.000 $1.000 $1.500 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 300.000 $2.000 $1.000 $0.500 $1.000
TREE REMOVAL (4" - 12" DIA)
EA 8.000 $200.000 $500.000 $225.000 $250.000
TREE REMOVAL (12" - 18" DIA)
EA 1.000 $300.000 $500.000 $600.000 $400.000
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
LF 12.000 $40.000 $100.000 $73.000 $150.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 60.000 $100.000 $100.000 $115.000 $80.000
TMA (STATIONARY)
DAY 100.000 $200.000 $10.000 $150.000 $160.000
REML & DISPL DRIFTWOOD & DEBRIS
CY 30.000 $70.000 $100.000 $160.000 $450.000
Totals: $598,854.000 $532,172.000 $740,785.500 $1,336,422.000