PREPARING ROW
|
STA
|
394.000
|
$1,775.000
|
$750.000
|
$350.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
429.000
|
$8.000
|
$25.000
|
$44.500
|
|
|
REMOVING STAB BASE & ASPH PAV (10"-12")
|
SY
|
4,550.000
|
$10.000
|
$7.500
|
$3.200
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
8,389.000
|
$12.000
|
$15.000
|
$14.920
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
22,696.000
|
$13.000
|
$15.000
|
$26.600
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
298,221.000
|
$0.500
|
$0.500
|
$0.750
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
880.000
|
$1.000
|
$2.000
|
$3.290
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
298,221.000
|
$0.150
|
$0.140
|
$0.170
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
298,221.000
|
$0.100
|
$0.090
|
$0.130
|
|
|
VEGETATIVE WATERING
|
MG
|
4,844.000
|
$12.500
|
$10.000
|
$1.000
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
1,545.000
|
$48.000
|
$70.000
|
$88.000
|
|
|
FL BS (RDWY DEL) (TY D GR 1-2)
|
TON
|
35,771.000
|
$40.000
|
$38.000
|
$38.000
|
|
|
REWORK BS MTL (TY C) (8") (ORD COMP)
|
SY
|
82,217.000
|
$2.500
|
$3.000
|
$2.300
|
|
|
FOG SEAL (SS-1)
|
GAL
|
11,901.000
|
$3.500
|
$4.000
|
$6.900
|
|
|
ASPH (CRS-2P)
|
GAL
|
74,002.000
|
$3.500
|
$4.150
|
$3.650
|
|
|
AGGR(TY D GR 3 OR TY L GR 3)
|
CY
|
1,298.000
|
$100.000
|
$125.000
|
$191.000
|
|
|
PLANE ASPH CONC PAV(0" TO 3")
|
SY
|
10,062.000
|
$1.500
|
$2.500
|
$5.000
|
|
|
CEM STABIL BKFL
|
CY
|
1,072.000
|
$166.000
|
$265.000
|
$185.000
|
|
|
CUT AND RESTORE PAV (FLEX BASE)
|
SY
|
662.000
|
$50.000
|
$20.000
|
$70.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
247.000
|
$132.000
|
$270.000
|
$185.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
524.000
|
$6.000
|
$10.000
|
$1.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,541.000
|
$38.000
|
$27.500
|
$26.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
78.200
|
$590.000
|
$550.000
|
$625.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
249.500
|
$100.000
|
$225.000
|
$185.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
397.000
|
$150.000
|
$235.000
|
$160.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
136.000
|
$450.000
|
$615.000
|
$650.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
96.000
|
$203.000
|
$90.000
|
$80.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
204.000
|
$248.000
|
$380.000
|
$266.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
186.000
|
$302.000
|
$420.000
|
$321.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)
|
LF
|
120.000
|
$318.000
|
$500.000
|
$356.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)
|
LF
|
140.000
|
$475.000
|
$685.000
|
$592.000
|
|
|
CONC BOX CULV (8 FT X 5 FT)
|
LF
|
267.000
|
$674.000
|
$1,015.000
|
$803.000
|
|
|
CONC BOX CULV (8 FT X 5 FT)(EXTEND)
|
LF
|
9.300
|
$1,000.000
|
$1,200.000
|
$1,000.000
|
|
|
CONC BOX CULV (8 FT X 7 FT)(EXTEND)
|
LF
|
31.200
|
$1,100.000
|
$800.000
|
$1,050.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,880.000
|
$68.000
|
$80.000
|
$59.500
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
962.000
|
$80.000
|
$115.000
|
$77.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
244.000
|
$114.000
|
$195.000
|
$113.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
166.000
|
$166.000
|
$250.000
|
$202.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
254.000
|
$252.000
|
$305.000
|
$325.000
|
|
|
RC PIPE (CL III)(60 IN)
|
LF
|
86.000
|
$380.000
|
$495.000
|
$425.000
|
|
|
HEADWALL (CH - FW - 15) (DIA= 42 IN)
|
EA
|
2.000
|
$8,000.000
|
$11,100.000
|
$7,200.000
|
|
|
HEADWALL (CH - FW - 30) (DIA= 36 IN)
|
EA
|
2.000
|
$7,700.000
|
$12,250.000
|
$12,000.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 60 IN)
|
EA
|
2.000
|
$16,500.000
|
$18,150.000
|
$22,800.000
|
|
|
WINGWALL (FW - 0) (HW=7 FT)
|
EA
|
1.000
|
$10,290.000
|
$15,500.000
|
$15,600.000
|
|
|
WINGWALL (FW - S) (HW=10 FT)
|
EA
|
2.000
|
$28,000.000
|
$75,200.000
|
$40,000.000
|
|
|
WINGWALL (FW - S) (HW=3 FT)
|
EA
|
2.000
|
$9,000.000
|
$10,300.000
|
$4,800.000
|
|
|
WINGWALL (FW - S) (HW=5 FT)
|
EA
|
2.000
|
$12,000.000
|
$14,025.000
|
$10,800.000
|
|
|
WINGWALL (FW - S) (HW=9 FT)
|
EA
|
2.000
|
$15,250.000
|
$57,350.000
|
$18,600.000
|
|
|
WINGWALL (SW - 0) (HW=3 FT)
|
EA
|
2.000
|
$8,000.000
|
$9,900.000
|
$3,000.000
|
|
|
WINGWALL (SW - 0) (HW=4 FT)
|
EA
|
2.000
|
$14,000.000
|
$11,050.000
|
$4,800.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$1,725.000
|
$1,175.000
|
$950.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
88.000
|
$1,117.000
|
$1,425.000
|
$1,170.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,350.000
|
$1,450.000
|
$1,190.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
46.000
|
$1,455.000
|
$1,775.000
|
$1,530.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
8.000
|
$1,927.000
|
$2,050.000
|
$2,100.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,460.000
|
$2,650.000
|
$2,800.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$3,025.000
|
$3,150.000
|
$3,700.000
|
|
|
SET (TY II) (42 IN) (RCP) (4: 1) (C)
|
EA
|
6.000
|
$3,950.000
|
$4,650.000
|
$5,000.000
|
|
|
REMOV STR (SET)
|
EA
|
28.000
|
$1,000.000
|
$1,150.000
|
$200.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
4.000
|
$1,200.000
|
$2,275.000
|
$1,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
2,025.000
|
$20.000
|
$18.000
|
$10.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
13.000
|
$66.000
|
$305.000
|
$150.000
|
|
|
REMOV STR (PIPE)
|
EA
|
13.000
|
$450.000
|
$575.000
|
$200.000
|
|
|
REMOVING ROCK RIPRAP
|
LF
|
20.000
|
$15.000
|
$140.000
|
$100.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,171,697.070
|
$1,200,000.000
|
$1,300,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$12,000.000
|
$5,000.000
|
$4,800.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
5,350.000
|
$32.000
|
$20.000
|
$41.150
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
5,350.000
|
$15.000
|
$5.000
|
$12.270
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
5,600.000
|
$32.000
|
$10.000
|
$22.400
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
5,600.000
|
$10.000
|
$2.500
|
$7.800
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
14,913.000
|
$3.500
|
$4.000
|
$3.900
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
14,913.000
|
$2.000
|
$0.500
|
$1.090
|
|
|
CONSTRUCTING DETOURS
|
SY
|
3,299.000
|
$76.000
|
$60.000
|
$55.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
2,761.000
|
$61.000
|
$40.000
|
$101.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
6,553.000
|
$36.000
|
$45.000
|
$62.000
|
|
|
TURNOUTS (ACP)
|
SY
|
663.000
|
$60.000
|
$45.000
|
$80.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
463.000
|
$150.000
|
$195.000
|
$110.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
66,988.000
|
$0.300
|
$0.150
|
$0.150
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
33,567.000
|
$0.350
|
$0.150
|
$0.180
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
1,225.000
|
$35.000
|
$34.000
|
$32.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,500.000
|
$2,750.000
|
$2,700.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
210.000
|
$3.000
|
$3.000
|
$2.500
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
8.000
|
$336.000
|
$150.000
|
$125.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
12.000
|
$3,423.000
|
$2,900.000
|
$2,800.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 2
|
EA
|
1.000
|
$212.000
|
$425.000
|
$400.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
40.000
|
$470.000
|
$125.000
|
$115.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
63.000
|
$531.000
|
$650.000
|
$615.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
19.000
|
$609.000
|
$675.000
|
$650.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
4.000
|
$836.000
|
$900.000
|
$875.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
5.000
|
$960.000
|
$1,000.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
2.000
|
$965.000
|
$1,000.000
|
$1,000.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
133.000
|
$121.000
|
$80.000
|
$75.000
|
|
|
RELOCATE SM RD SN SUP & AM TY TEMP
|
EA
|
2.000
|
$241.000
|
$300.000
|
$350.000
|
|
|
INSTL OM ASSM (OM-2X)(WC)GND
|
EA
|
40.000
|
$242.000
|
$55.000
|
$45.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
41.000
|
$40.000
|
$30.000
|
$28.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
2,827.000
|
$0.500
|
$0.490
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
2,730.000
|
$0.500
|
$0.590
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,577.000
|
$1.050
|
$1.500
|
$0.960
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
291.000
|
$9.500
|
$20.000
|
$7.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
73,151.000
|
$0.700
|
$0.720
|
$0.600
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
4,170.000
|
$0.650
|
$0.750
|
$0.650
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
47,222.000
|
$0.600
|
$0.720
|
$0.600
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
241.000
|
$4.050
|
$7.000
|
$4.500
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
982.000
|
$20.000
|
$15.000
|
$25.000
|
|
|
SP MIXES SP-C PG70-22
|
TON
|
20,657.000
|
$120.000
|
$110.000
|
$122.000
|
|
|
TACK COAT
|
GAL
|
12,520.000
|
$4.500
|
$4.500
|
$3.050
|
|
|
CEMENT
|
TON
|
840.000
|
$184.000
|
$265.000
|
$225.000
|
|
|
ASPHALT BINDER (PG 64-22)
|
TON
|
1,963.000
|
$569.000
|
$650.000
|
$625.000
|
|
|
FOAMED ASPHALT TREAT (10")(DC)
|
SY
|
115,134.000
|
$3.500
|
$3.000
|
$5.750
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$9,100.000
|
$10,000.000
|
$10,825.000
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
160.000
|
$24.500
|
$25.000
|
$20.000
|
|
|
TMA (STATIONARY)
|
DAY
|
202.000
|
$248.000
|
$240.000
|
$189.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
127.000
|
$65.000
|
$90.000
|
$20.000
|
|
Totals: |
$12,787,432.470
|
$12,787,365.870
|
$13,428,693.380
|