HILL FM 2959 (3030-01-010)

Items: 113

County: HILL
Length: N/A
Highway: FM 2959
District: WACO
Control Number: 3030-01-010
DBE Goal: 0.0%
Project: C 3030-1-10
Guaranty: N/A
Time: 202 WORKING DAYS
Engineer's Estimate: $12,787,432.47
Date: 01/04/2024 (2 years ago)
Contract Number: N/A
Type: WIDEN ROAD - ADD SHOULDERS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$12,787,432.47
$12,787,365.87
Over/Under Est: 0% -$66.60
Over/Under Est: 5.01% $641,260.91
Amt Left: 5.02% $641,327.51
Subcontractor Percentage Amount
BEAR CREEK CONSTRUCTION, LLC 21.46% $2,647,368.63
COLD CREEK CONSTRUCTION, LTD 1.07% $131,998.34
D. I. J. CONSTRUCTION, INC. 0.82% $101,157.61
FORTSON CONTRACTING, INC. 0.70% $86,354.06
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.57% $70,316.87
MURRAY CONSTRUCTION 0.57% $70,316.87
KING GEORGE TRAFFIC SOLUTIONS LLC 0.18% $22,205.33
PROFESSIONAL TRAFFIC CONTROL LLC 0.11% $13,569.92
HIGHWAY TRAFFIC CONTROL & SERVICES, LLC 0.10% $12,336.29
DALLAS LITE AND BARRICADE, INC. 0.02% $2,467.26
HOGAN MURRAY, INC. 0.00% $0.00
Total: 25.60% $3,158,091.18

Bid Items & Bid Tabulations

113 Total 0 of 113
HILL  |  FM 2959  |  WACO  |  3030-01-010  |  01/04/2024  |  $12,787,432.47  |  C 3030-1-10  |  WIDEN ROAD - ADD SHOULDERS  |  202 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
TEXAS MATERIALS GROUP, INC.
PREPARING ROW
STA 394.000 $1,775.000 $750.000 $350.000
REMOVING CONC (PAV)
SY 429.000 $8.000 $25.000 $44.500
REMOVING STAB BASE & ASPH PAV (10"-12")
SY 4,550.000 $10.000 $7.500 $3.200
EXCAVATION (ROADWAY)
CY 8,389.000 $12.000 $15.000 $14.920
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 22,696.000 $13.000 $15.000 $26.600
FURNISHING AND PLACING TOPSOIL (4")
SY 298,221.000 $0.500 $0.500 $0.750
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 880.000 $1.000 $2.000 $3.290
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 298,221.000 $0.150 $0.140 $0.170
DRILL SEED (TEMP)(WARM OR COOL)
SY 298,221.000 $0.100 $0.090 $0.130
VEGETATIVE WATERING
MG 4,844.000 $12.500 $10.000 $1.000
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 1,545.000 $48.000 $70.000 $88.000
FL BS (RDWY DEL) (TY D GR 1-2)
TON 35,771.000 $40.000 $38.000 $38.000
REWORK BS MTL (TY C) (8") (ORD COMP)
SY 82,217.000 $2.500 $3.000 $2.300
FOG SEAL (SS-1)
GAL 11,901.000 $3.500 $4.000 $6.900
ASPH (CRS-2P)
GAL 74,002.000 $3.500 $4.150 $3.650
AGGR(TY D GR 3 OR TY L GR 3)
CY 1,298.000 $100.000 $125.000 $191.000
PLANE ASPH CONC PAV(0" TO 3")
SY 10,062.000 $1.500 $2.500 $5.000
CEM STABIL BKFL
CY 1,072.000 $166.000 $265.000 $185.000
CUT AND RESTORE PAV (FLEX BASE)
SY 662.000 $50.000 $20.000 $70.000
FLOWABLE BACKFILL
CY 247.000 $132.000 $270.000 $185.000
TRENCH EXCAVATION PROTECTION
LF 524.000 $6.000 $10.000 $1.000
TEMPORARY SPL SHORING
SF 2,541.000 $38.000 $27.500 $26.000
RIPRAP (CONC)(5 IN)
CY 78.200 $590.000 $550.000 $625.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 249.500 $100.000 $225.000 $185.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 397.000 $150.000 $235.000 $160.000
RIPRAP (MOW STRIP)(4 IN)
CY 136.000 $450.000 $615.000 $650.000
CMP (GAL STL 24 IN)
LF 96.000 $203.000 $90.000 $80.000
CONC BOX CULV (3 FT X 2 FT)
LF 204.000 $248.000 $380.000 $266.000
CONC BOX CULV (4 FT X 2 FT)
LF 186.000 $302.000 $420.000 $321.000
CONC BOX CULV (4 FT X 3 FT)
LF 120.000 $318.000 $500.000 $356.000
CONC BOX CULV (6 FT X 4 FT)
LF 140.000 $475.000 $685.000 $592.000
CONC BOX CULV (8 FT X 5 FT)
LF 267.000 $674.000 $1,015.000 $803.000
CONC BOX CULV (8 FT X 5 FT)(EXTEND)
LF 9.300 $1,000.000 $1,200.000 $1,000.000
CONC BOX CULV (8 FT X 7 FT)(EXTEND)
LF 31.200 $1,100.000 $800.000 $1,050.000
RC PIPE (CL III)(18 IN)
LF 1,880.000 $68.000 $80.000 $59.500
RC PIPE (CL III)(24 IN)
LF 962.000 $80.000 $115.000 $77.000
RC PIPE (CL III)(30 IN)
LF 244.000 $114.000 $195.000 $113.000
RC PIPE (CL III)(36 IN)
LF 166.000 $166.000 $250.000 $202.000
RC PIPE (CL III)(42 IN)
LF 254.000 $252.000 $305.000 $325.000
RC PIPE (CL III)(60 IN)
LF 86.000 $380.000 $495.000 $425.000
HEADWALL (CH - FW - 15) (DIA= 42 IN)
EA 2.000 $8,000.000 $11,100.000 $7,200.000
HEADWALL (CH - FW - 30) (DIA= 36 IN)
EA 2.000 $7,700.000 $12,250.000 $12,000.000
HEADWALL (CH - PW - S) (DIA= 60 IN)
EA 2.000 $16,500.000 $18,150.000 $22,800.000
WINGWALL (FW - 0) (HW=7 FT)
EA 1.000 $10,290.000 $15,500.000 $15,600.000
WINGWALL (FW - S) (HW=10 FT)
EA 2.000 $28,000.000 $75,200.000 $40,000.000
WINGWALL (FW - S) (HW=3 FT)
EA 2.000 $9,000.000 $10,300.000 $4,800.000
WINGWALL (FW - S) (HW=5 FT)
EA 2.000 $12,000.000 $14,025.000 $10,800.000
WINGWALL (FW - S) (HW=9 FT)
EA 2.000 $15,250.000 $57,350.000 $18,600.000
WINGWALL (SW - 0) (HW=3 FT)
EA 2.000 $8,000.000 $9,900.000 $3,000.000
WINGWALL (SW - 0) (HW=4 FT)
EA 2.000 $14,000.000 $11,050.000 $4,800.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 3.000 $1,725.000 $1,175.000 $950.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 88.000 $1,117.000 $1,425.000 $1,170.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $1,350.000 $1,450.000 $1,190.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 46.000 $1,455.000 $1,775.000 $1,530.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 8.000 $1,927.000 $2,050.000 $2,100.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 2.000 $2,460.000 $2,650.000 $2,800.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 2.000 $3,025.000 $3,150.000 $3,700.000
SET (TY II) (42 IN) (RCP) (4: 1) (C)
EA 6.000 $3,950.000 $4,650.000 $5,000.000
REMOV STR (SET)
EA 28.000 $1,000.000 $1,150.000 $200.000
REMOV STR (WINGWALL)
EA 4.000 $1,200.000 $2,275.000 $1,000.000
REMOV STR (PIPE)
LF 2,025.000 $20.000 $18.000 $10.000
REMOV STR (BOX CULVERT)
LF 13.000 $66.000 $305.000 $150.000
REMOV STR (PIPE)
EA 13.000 $450.000 $575.000 $200.000
REMOVING ROCK RIPRAP
LF 20.000 $15.000 $140.000 $100.000
MOBILIZATION
LS 1.000 $1,171,697.070 $1,200,000.000 $1,300,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $12,000.000 $5,000.000 $4,800.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 5,350.000 $32.000 $20.000 $41.150
ROCK FILTER DAMS (REMOVE)
LF 5,350.000 $15.000 $5.000 $12.270
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 5,600.000 $32.000 $10.000 $22.400
CONSTRUCTION EXITS (REMOVE)
SY 5,600.000 $10.000 $2.500 $7.800
TEMP SEDMT CONT FENCE (INSTALL)
LF 14,913.000 $3.500 $4.000 $3.900
TEMP SEDMT CONT FENCE (REMOVE)
LF 14,913.000 $2.000 $0.500 $1.090
CONSTRUCTING DETOURS
SY 3,299.000 $76.000 $60.000 $55.000
INTERSECTIONS (ACP)
SY 2,761.000 $61.000 $40.000 $101.000
DRIVEWAYS (ACP)
SY 6,553.000 $36.000 $45.000 $62.000
TURNOUTS (ACP)
SY 663.000 $60.000 $45.000 $80.000
DRIVEWAYS (CONC) (HES)
SY 463.000 $150.000 $195.000 $110.000
RUMBLE STRIPS (SHOULDER)
LF 66,988.000 $0.300 $0.150 $0.150
RUMBLE STRIPS (CENTERLINE)
LF 33,567.000 $0.350 $0.150 $0.180
MTL W-BEAM GD FEN (STEEL POST)
LF 1,225.000 $35.000 $34.000 $32.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,500.000 $2,750.000 $2,700.000
REMOVE METAL BEAM GUARD FENCE
LF 210.000 $3.000 $3.000 $2.500
REMOVE TERMINAL ANCHOR SECTION
EA 8.000 $336.000 $150.000 $125.000
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $3,423.000 $2,900.000 $2,800.000
MAILBOX INSTALL-M (TWG-POST) TY 2
EA 1.000 $212.000 $425.000 $400.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 40.000 $470.000 $125.000 $115.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 63.000 $531.000 $650.000 $615.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 19.000 $609.000 $675.000 $650.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 4.000 $836.000 $900.000 $875.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 5.000 $960.000 $1,000.000 $900.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 2.000 $965.000 $1,000.000 $1,000.000
REMOVE SM RD SN SUP&AM
EA 133.000 $121.000 $80.000 $75.000
RELOCATE SM RD SN SUP & AM TY TEMP
EA 2.000 $241.000 $300.000 $350.000
INSTL OM ASSM (OM-2X)(WC)GND
EA 40.000 $242.000 $55.000 $45.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 41.000 $40.000 $30.000 $28.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 2,827.000 $0.500 $0.490 $1.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 2,730.000 $0.500 $0.590 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,577.000 $1.050 $1.500 $0.960
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 291.000 $9.500 $20.000 $7.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 73,151.000 $0.700 $0.720 $0.600
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 4,170.000 $0.650 $0.750 $0.650
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 47,222.000 $0.600 $0.720 $0.600
REFL PAV MRKR TY II-A-A
EA 241.000 $4.050 $7.000 $4.500
DITCH CLEANING AND RESHAPING (FOOT)
LF 982.000 $20.000 $15.000 $25.000
SP MIXES SP-C PG70-22
TON 20,657.000 $120.000 $110.000 $122.000
TACK COAT
GAL 12,520.000 $4.500 $4.500 $3.050
CEMENT
TON 840.000 $184.000 $265.000 $225.000
ASPHALT BINDER (PG 64-22)
TON 1,963.000 $569.000 $650.000 $625.000
FOAMED ASPHALT TREAT (10")(DC)
SY 115,134.000 $3.500 $3.000 $5.750
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,100.000 $10,000.000 $10,825.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 160.000 $24.500 $25.000 $20.000
TMA (STATIONARY)
DAY 202.000 $248.000 $240.000 $189.000
TMA (MOBILE OPERATION)
HR 127.000 $65.000 $90.000 $20.000
Totals: $12,787,432.470 $12,787,365.870 $13,428,693.380