Show Job Controls
Bid Cobra

HILL SH 171 (0418-01-035)

Items: 40

County: HILL
Length: 0.0000 MILES
Highway: SH 171
District: WACO
Control Number: 0418-01-035
DBE Goal: 2.0%
Project: F 2025(374)
Guaranty: $100,000.00
Time: 120 WORKING DAYS
Engineer's Estimate: $9,344,627.40
Date: 01/07/2025 (1 year ago)
Contract Number: 1253013
Type: SURFACING/ROADWAY RESTORATION
Project ID: A00182264
Contract Type: Federal
Project Description: MILL & OVERLAY
Mail/Deliver Bids To: N/A
BILL COMPTON
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$9,344,627.40
$8,760,907.35
Over/Under Est: -6.25% -$583,720.05
Over/Under Est: 5.4% $504,530.81
Amt Left: 12.42% $1,088,250.86
Over/Under Est: 6.3% $588,922.82
Amt Left: 13.38% $1,172,642.87
Delta: -0.86% -$84,392.01
$10,892,840.05
Over/Under Est: 16.57% $1,548,212.65
Amt Left: 24.33% $2,131,932.70
Delta: -9.66% -$959,289.83
$15,747,494.70
Over/Under Est: 68.52% $6,402,867.30
Amt Left: 79.75% $6,986,587.35
Delta: -44.57% -$4,854,654.65
Subcontractor Percentage Amount
D. I. J. CONSTRUCTION, INC. 1.83% $157,734.99
ODUM SERVICES, LLC 0.62% $53,440.27
PROFESSIONAL TRAFFIC CONTROL LLC 0.26% $22,410.44
HIGHWAY TRAFFIC CONTROL & SERVICES, LLC 0.23% $19,824.62
DALLAS LITE AND BARRICADE, INC. 0.03% $2,585.82
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.03% $2,585.82
Total: 3.00% $258,581.96

Bid Items & Bid Tabulations

40 Total 0 of 40
HILL  |  SH 171  |  WACO  |  0418-01-035  |  01/07/2025  |  $9,344,627.40  |  F 2025(374)  |  SURF/ROADWAY RESTOR  |  120 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
TEXAS MATERIALS GROUP, INC.
KNIFE RIVER CORPORATION - SOUTH
CK NEWBERRY, LLC
FNH CONSTRUCTION, LLC
REMOV CONC (MOWSTRIP)
LF 960.000 $14.000 $20.000 $12.500 $12.500 $20.000 $100.000
EMBANK (FNL)(OC)(TY B)
CY 236.000 $41.810 $75.000 $100.000 $75.000 $80.000 $100.000
BACKFILL (TY B)
STA 376.000 $250.000 $250.000 $240.000 $268.000 $225.000 $250.000
HYDRO MULCH SEED (PERM_RURAL_CLAY)
SY 712.000 $1.000 $4.000 $2.500 $2.750 $4.000 $10.000
VEGETATIVE WATERING
TGL 5.800 $35.000 $150.000 $283.000 $200.000 $220.000 $1,000.000
SP MIXES SP-B PG64-22
TON 39,912.000 $85.000 $90.000 $103.600 $97.500 $100.000 $155.000
SP MIXES SP-C SAC-A PG70-22
TON 31,927.000 $110.000 $100.000 $121.500 $118.450 $120.000 $175.000
TACK COAT
GAL 58,924.000 $2.330 $3.500 $2.900 $2.950 $5.000 $5.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 528.000 $65.500 $70.000 $94.000 $125.000 $140.000 $80.000
PLANE ASPH CONC PAV (2" TO 4 1/2")
SY 295,261.000 $3.000 $2.350 $2.000 $1.950 $2.000 $3.500
FLOWABLE BACKFILL
CY 80.000 $325.000 $360.000 $700.000 $350.000 $400.000 $350.000
RIPRAP (MOW STRIP)(4 IN)
CY 76.300 $650.000 $700.000 $780.000 $1,050.000 $700.000 $550.000
MOBILIZATION
LS 1.000 $608,772.950 $200,000.000 $172,500.000 $385,000.000 $1,000,000.000 $1,500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $5,000.000 $5,000.000 $1,700.000 $18,500.000 $25,000.000 $8,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 180.000 $76.100 $125.000 $25.000 $110.000 $100.000 $150.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,762.500 $10,000.000 $2,165.000 $15,500.000 $12,000.000 $20,000.000
TMA (STATIONARY)
DAY 180.000 $235.000 $370.000 $100.000 $200.000 $350.000 $250.000
TMA (MOBILE OPERATION)
HR 360.000 $20.000 $75.000 $20.000 $25.000 $100.000 $85.000
INTERSECTIONS (ACP)
SY 5,015.000 $41.000 $30.000 $60.000 $64.000 $50.000 $45.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 128,539.000 $0.200 $0.200 $0.230 $0.160 $0.350 $0.300
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 64,160.000 $0.200 $0.200 $0.350 $0.160 $0.230 $0.300
MTL W-BEAM GD FEN (STEEL POST)
LF 587.500 $29.750 $40.000 $28.000 $30.000 $30.000 $35.000
SHORT RADIUS (28")
LF 21.250 $50.000 $100.000 $33.000 $36.000 $150.000 $200.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,500.000 $2,000.000 $1,250.000 $1,350.000 $1,200.000 $1,850.000
REMOVE METAL BEAM GUARD FENCE
LF 587.500 $1.750 $6.000 $2.500 $2.750 $3.000 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $230.000 $500.000 $250.000 $275.000 $230.000 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 9.000 $3,000.000 $3,200.000 $2,800.000 $3,000.000 $3,150.000 $3,250.000
GUARDRAIL END TREATMENT (REMOVE)
EA 9.000 $500.000 $500.000 $250.000 $275.000 $470.000 $1,500.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 11.000 $45.000 $60.000 $35.000 $40.000 $44.500 $100.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 13,870.000 $0.290 $0.100 $0.050 $0.060 $0.300 $0.500
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 131,860.000 $0.230 $0.220 $0.180 $0.190 $0.200 $0.500
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 29,620.000 $0.280 $0.400 $0.330 $0.350 $0.200 $0.500
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 140.000 $12.000 $5.000 $4.000 $4.300 $10.000 $20.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 747.000 $0.960 $1.500 $0.920 $2.500 $0.800 $6.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 220.000 $1.500 $1.800 $1.650 $1.770 $2.000 $6.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 140.000 $7.500 $15.000 $12.000 $12.900 $8.000 $20.000
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
LF 131,860.000 $0.600 $0.800 $0.650 $0.700 $0.800 $0.750
TY I HIGH PERF PM (Y)6"(BRK)(100MIL)
LF 29,620.000 $0.600 $0.600 $0.540 $0.580 $0.850 $0.750
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
LF 13,870.000 $0.600 $0.750 $0.680 $0.730 $0.850 $0.750
REFL PAV MRKR TY II-A-A
EA 1,617.000 $5.000 $7.000 $6.000 $6.450 $5.000 $6.000
Totals: $9,344,627.400 $8,760,907.350 $9,849,158.210 $9,933,550.215 $10,892,840.050 $15,747,494.700