Show Job Controls
Bid Cobra

HILL SH 22 (0121-03-063)

Items: 42

County: HILL
Length: N/A
Highway: SH 22
District: WACO
Control Number: 0121-03-063
DBE Goal: N/A
Project: NH 2021(080)
Guaranty: N/A
Time: 45 WORKING DAYS
Engineer's Estimate: $962,109.79
Date: 11/05/2020 (5 years ago)
Contract Number: N/A
Type: REHABILITATION OF EXISTING ROAD
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$962,109.79
$1,051,927.65
Over/Under Est: 9.34% $89,817.86
Over/Under Est: 11.93% $114,735.77
Amt Left: 2.37% $24,917.91
Over/Under Est: 14.72% $141,627.11
Amt Left: 4.93% $51,809.25
Delta: -2.50% -$26,891.34
Over/Under Est: 41.81% $402,245.86
Amt Left: 29.7% $312,428.00
Delta: -23.61% -$260,618.75
Over/Under Est: 68.26% $656,777.90
Amt Left: 53.9% $566,960.04
Delta: -18.66% -$254,532.04

Bid Items & Bid Tabulations

42 Total 0 of 42
HILL  |  SH 22  |  WACO  |  0121-03-063  |  11/05/2020  |  $962,109.79  |  NH 2021(080)  |  REHAB OF EXIST ROAD  |  45 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
TEXAS MATERIALS GROUP, INC.
KNIFE RIVER CORPORATION - SOUTH
PEACHTREE CONSTRUCTION, LTD.
B & MS CONSTRUCTION, INC.
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 6,459.000 $100.000 $100.000 $114.000 $93.200 $126.000 $145.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 1,763.500 $35.000 $45.000 $42.000 $46.800 $56.000 $70.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 602.000 $50.000 $67.500 $62.050 $89.150 $84.000 $80.500
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 46,974.000 $0.910 $2.000 $1.160 $3.350 $1.700 $5.500
RIPRAP (MOW STRIP)(4 IN)
CY 14.000 $415.000 $750.000 $890.000 $610.000 $830.000 $510.000
MOBILIZATION
LS 1.000 $48,489.770 $30,000.000 $34,610.000 $75,560.000 $100,000.000 $45,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $4,000.000 $3,000.000 $8,495.000 $2,725.000 $3,500.000 $9,233.350
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 821.000 $1.890 $5.000 $3.740 $5.650 $3.500 $4.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 821.000 $0.850 $1.000 $1.000 $1.850 $1.000 $1.070
MTL W-BEAM GD FEN (STEEL POST)
LF 75.000 $23.850 $40.000 $19.000 $29.700 $20.000 $75.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,835.270 $2,500.000 $1,675.000 $2,540.000 $1,800.000 $3,500.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,135.530 $1,500.000 $1,100.000 $1,600.000 $1,200.000 $3,000.000
MTL BM GD FEN TRANS (NON - SYM)
EA 2.000 $759.000 $1,000.000 $500.000 $885.000 $550.000 $1,500.000
REMOVE METAL BEAM GUARD FENCE
LF 150.000 $2.320 $5.000 $1.750 $5.250 $1.800 $2.820
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $250.740 $300.000 $150.000 $156.000 $160.000 $175.490
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $2,634.480 $3,500.000 $2,375.000 $2,640.000 $2,500.000 $3,102.700
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $200.000 $300.000 $220.000 $260.000 $240.000 $453.270
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 8.000 $28.640 $30.000 $30.000 $47.000 $33.000 $30.940
REFL PAV MRK TY I (W)4"(LNDP)(100MIL)
LF 63.000 $1.100 $1.000 $1.000 $1.050 $1.100 $0.200
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 403.000 $5.700 $5.500 $7.000 $7.300 $6.000 $7.480
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 175.000 $5.000 $6.000 $5.000 $5.200 $6.500 $6.790
REFL PAV MRK TY II (W) 8" (SLD)
LF 2,105.000 $0.290 $0.500 $0.200 $0.200 $0.550 $0.510
PAVEMENT SEALER 4"
LF 4,035.000 $0.150 $0.500 $0.440 $0.450 $0.550 $0.230
PAVEMENT SEALER 8"
LF 1,859.000 $0.440 $0.750 $0.900 $0.950 $0.800 $1.150
PAVEMENT SEALER 24"
LF 536.000 $1.500 $2.500 $2.000 $2.100 $2.600 $1.730
PAVEMENT SEALER (ARROW)
EA 10.000 $27.500 $50.000 $50.000 $52.000 $55.000 $58.650
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 3,510.000 $0.350 $1.000 $0.450 $0.470 $1.100 $0.450
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 3,314.000 $0.320 $1.000 $0.420 $0.450 $1.100 $0.450
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 3,470.000 $0.360 $1.000 $0.420 $0.450 $1.100 $0.430
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 17,355.000 $0.320 $0.600 $0.420 $0.450 $0.650 $0.430
PREFAB PAV MRK TY C (W) (ARROW)
EA 18.000 $208.570 $225.000 $250.000 $260.400 $240.000 $230.000
REFL PAV MRKR TY I-C
EA 456.000 $3.600 $3.500 $4.000 $4.150 $3.800 $3.970
REFL PAV MRKR TY II-A-A
EA 546.000 $3.560 $3.500 $4.000 $4.150 $3.800 $3.680
ELIM EXT PAV MRK & MRKS (4")
LF 5,884.000 $0.350 $0.600 $0.750 $0.800 $0.650 $0.460
ELIM EXT PAV MRK & MRKS (24")
LF 612.000 $3.120 $3.000 $6.500 $6.750 $3.200 $4.030
ELIM EXT PAV MRK & MRKS (ARROW)
EA 10.000 $45.790 $75.000 $100.000 $104.000 $80.000 $106.660
ELIM EXT PAV MRK & MRKS (WORD)
EA 8.000 $49.220 $100.000 $100.000 $104.000 $110.000 $112.700
UNDERSEAL COURSE
GAL 11,744.000 $2.800 $3.000 $2.550 $2.050 $9.000 $3.740
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 14.000 $100.000 $100.000 $120.000 $105.000 $60.000 $95.450
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $7,500.000 $5,000.000 $500.000 $2,600.000 $3,500.000 $11,266.550
TMA (STATIONARY)
DAY 23.000 $186.610 $175.000 $200.000 $250.000 $210.000 $197.800
TMA (MOBILE OPERATION)
HR 200.000 $61.220 $75.000 $20.000 $35.000 $50.000 $107.810
Totals: $962,109.790 $1,051,927.650 $1,076,845.560 $1,103,736.900 $1,364,355.650 $1,618,887.690