Show Job Controls
Bid Cobra

HIDALGO FM 2220 (2094-01-071)

Items: 49

County: HIDALGO
Length: N/A
Highway: FM 2220
District: PHARR
Control Number: 2094-01-071
DBE Goal: N/A
Project: STP 2023(834)HES
Guaranty: N/A
Time: 45 WORKING DAYS
Engineer's Estimate: $1,248,852.58
Date: 06/01/2023 (3 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
HECTOR SILLER
JESUS NORIEGA
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$1,248,852.58
$809,835.40
Over/Under Est: -35.15% -$439,017.18
Over/Under Est: -25.87% -$323,095.58
Amt Left: 14.31% $115,921.60
$1,135,421.30
Over/Under Est: -9.08% -$113,431.28
Amt Left: 40.2% $325,585.90
Delta: -22.65% -$209,664.30

Bid Items & Bid Tabulations

49 Total 0 of 49
HIDALGO  |  FM 2220  |  PHARR  |  2094-01-071  |  06/01/2023  |  $1,248,852.58  |  STP 2023(834)HES  |  HAZARD ELIM & SAFETY  |  45 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FOREMOST PAVING, INC.
TEXAS CORDIA CONSTRUCTION, LLC
RBM CONTRACTORS LLC
PREPARING ROW
STA 37.500 $6,275.070 $1,500.000 $750.000 $2,546.290
BACKFILL (TY A)
STA 31.000 $275.000 $600.000 $300.000 $414.110
PLANE ASPH CONC PAV (1.5")
SY 5,488.000 $2.500 $6.000 $8.000 $8.010
PLANE ASPH CONC PAV (0" TO 1 1/2")
SY 3,194.000 $2.450 $11.000 $8.000 $8.070
RIPRAP CONC (8 IN)
CY 117.000 $1,300.000 $550.000 $600.000 $416.350
RIPRAP (MOW STRIP)(4 IN)
CY 46.000 $530.000 $600.000 $780.000 $434.250
CLEANING EXISTING JOINTS
LF 136.000 $15.350 $70.000 $70.000 $383.440
MOBILIZATION
LS 1.000 $113,532.050 $75,000.000 $85,000.000 $89,469.200
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $5,236.170 $9,000.000 $8,500.000 $10,225.050
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 156.000 $45.000 $38.000 $25.000 $35.790
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $10.000 $21.000 $12.000 $9.200
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 120.000 $5.000 $10.000 $23.000 $6.390
BIODEG EROSN CONT LOGS (REMOVE)
LF 120.000 $1.500 $5.000 $6.000 $1.280
CONC CURB (MOUNTABLE)
LF 6,020.000 $45.000 $13.000 $16.000 $17.440
MTL W-BEAM GD FEN (TIM POST)
LF 350.000 $26.130 $35.000 $29.000 $40.900
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,300.000 $2,000.000 $2,080.000 $3,195.330
REMOVE METAL BEAM GUARD FENCE
LF 350.000 $2.480 $4.000 $6.000 $7.300
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $286.680 $300.000 $210.000 $639.070
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $200.000 $300.000 $247.000 $639.070
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,250.000 $3,300.000 $3,440.000 $4,473.460
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $290.000 $375.000 $383.000 $639.070
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 1,620.000 $0.380 $0.800 $1.000 $0.720
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 6,205.000 $0.500 $0.800 $1.000 $0.530
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 6,205.000 $0.460 $0.800 $1.000 $0.530
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 280.000 $1.700 $1.500 $1.000 $2.420
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 550.000 $1.000 $1.200 $1.000 $1.760
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 550.000 $0.690 $1.200 $1.000 $1.760
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 600.000 $0.900 $1.000 $5.000 $2.100
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 264.000 $0.830 $1.000 $7.000 $2.100
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 100.000 $1.270 $1.500 $2.000 $3.740
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 18.000 $4.500 $9.000 $9.000 $7.040
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 360.000 $0.480 $0.850 $1.000 $0.880
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 1,590.000 $0.570 $1.350 $1.000 $1.320
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 280.000 $0.480 $1.000 $1.000 $0.880
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 1,510.000 $0.450 $1.000 $1.000 $0.880
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 5,730.000 $0.500 $1.200 $1.000 $0.990
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 1,350.000 $0.550 $1.400 $1.000 $1.540
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 6,025.000 $0.820 $1.800 $2.000 $1.980
PREFAB PAV MRK TY C (W) (ARROW)
EA 1.000 $185.000 $200.000 $200.000 $308.000
PREFAB PAV MRK TY C (W) (WORD)
EA 1.000 $276.320 $300.000 $300.000 $308.000
REFL PAV MRKR TY I-C
EA 5.000 $3.900 $5.000 $5.000 $4.180
REFL PAV MRKR TY II-A-A
EA 38.000 $3.830 $5.000 $5.000 $7.480
REFL PAV MRKR TY II-C-R
EA 101.000 $4.100 $5.000 $5.000 $7.480
ELIM EXT PAV MRK & MRKS (4")
LF 9,380.000 $0.500 $0.500 $1.000 $0.990
STONE-MTRX-ASPH SMA-F SAC-A PG76-22
TON 2,022.000 $140.070 $130.000 $185.000 $191.820
BONDING COURSE
GAL 1,655.000 $4.280 $5.000 $8.000 $10.860
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $4,111.110 $7,500.000 $150.000 $7,668.790
TMA (STATIONARY)
DAY 90.000 $176.330 $75.000 $50.000 $319.530
TMA (MOBILE OPERATION)
DAY 90.000 $241.320 $0.010 $50.000 $595.130
Totals: $1,248,852.585 $809,835.400 $925,757.000 $1,135,421.305