HIDALGO W FREDDY GONZALEZ DR (0921-02-534)

Items: 88

County: HIDALGO
Length: 0.0000 MILES
Highway: W FREDDY GONZALEZ DR
District: PHARR
Control Number: 0921-02-534
DBE Goal: 0.0%
Project: STP 2025(619)TAPS
Guaranty: $9,000.00
Time: 148 WORKING DAYS
Engineer's Estimate: $447,695.20
Date: 06/03/2026 (7 days ago)
Contract Number: 6263224
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Project ID: A00206853
Contract Type: Federal
Project Description: UPGRADE FREDDY GONZALEZ DR & CLOSNER BLVD INTERSECTION W/ ADA RAMPS & PEDESTRIAN SIGNALS TO PROVIDE SAFE CROSSINGS. CONSTRUCT GAPS OF AN 8-FOOT-WIDE SIDEWALK ALONG FREDDY GONZALEZ DR FROM 9TH STREET AVE TO CLOSNER BLVD
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
JESUS NORIEGA
ARLENE GARCIA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (7)
E
Engineer's Estimate
$447,695.20
$493,025.00
Over/Under Est: 10.13% $45,329.80
Over/Under Est: 27.39% $122,632.55
Amt Left: 15.68% $77,302.75
Over/Under Est: 29.8% $133,397.47
Amt Left: 17.86% $88,067.67
Delta: -1.89% -$10,764.92
Over/Under Est: 32.05% $143,494.19
Amt Left: 19.91% $98,164.39
Delta: -1.74% -$10,096.72
Over/Under Est: 33.49% $149,924.08
Amt Left: 21.21% $104,594.28
Delta: -1.09% -$6,429.89
Over/Under Est: 48.05% $215,129.80
Amt Left: 34.44% $169,800.00
Delta: -10.91% -$65,205.72
$777,697.00
Over/Under Est: 73.71% $330,001.80
Amt Left: 57.74% $284,672.00
Delta: -17.33% -$114,872.00

Bid Items & Bid Tabulations

88 Total 0 of 88
HIDALGO  |  W FREDDY GONZALEZ DR  |  PHARR  |  0921-02-534  |  06/03/2026  |  $447,695.20  |  STP 2025(619)TAPS  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  148 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CASTILLO ARANDA LLC
LUCANIA CONTRACTORS LLC
GO UNDERGROUND, LIMITED LIABILITY COMPANY
DIGG COMMERCIAL, LLC
TI-ZACK CONCRETE, LLC
TEXAS CORDIA CONSTRUCTION, LLC
ARTILLERY L.L.C.
PREPARING ROW
STA 9.700 $3,000.000 $2,000.000 $4,000.000 $1,200.000 $1,000.000 $1,100.000 $1,500.000 $1,000.000
PREP ROW (TREE REMOVE) (12"-24" DIA)
EA 1.000 $1,500.000 $200.000 $3,000.000 $2,400.000 $5,000.000 $1,375.000 $850.000 $3,000.000
REMOV CONC (PAV)
SY 39.000 $21.500 $10.000 $30.000 $24.000 $12.000 $23.380 $73.000 $36.000
REMOV CONC (DRIVEWAYS)
SY 68.000 $15.000 $10.000 $30.000 $24.000 $20.000 $26.820 $69.000 $36.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 408.000 $8.000 $10.000 $25.000 $24.000 $18.000 $22.350 $12.000 $36.000
REMOV CONC (CURB)
LF 132.000 $10.000 $3.000 $15.000 $24.000 $7.560 $11.750 $36.000 $20.000
REMOV CONC (GUTTER)
LF 38.000 $5.000 $3.000 $15.000 $24.000 $7.340 $10.200 $71.000 $30.000
REMOV CONC (MISC)
EA 1.000 $2,500.000 $350.000 $1,500.000 $7,000.000 $500.000 $1,938.000 $3,466.000 $500.000
REMOV CONC (MISC)
SY 2.000 $50.000 $10.000 $750.000 $24.000 $26.000 $39.900 $989.000 $500.000
RMV (2") TRT/UNTRT BASE & ASPH PAV
SY 149.000 $4.000 $30.000 $25.000 $24.000 $10.000 $21.420 $100.000 $50.000
EXCAV (ROADWAY)
CY 78.000 $6.300 $20.000 $60.000 $24.000 $12.000 $102.310 $50.000 $100.000
FURN & PLACE TOPSOIL (4")
STA 6.200 $1,500.000 $1,500.000 $1,500.000 $8,393.550 $54.000 $386.130 $650.000 $700.000
HYDRO MULCH SEED (TEMP_WARM)
SY 440.000 $1.000 $1.000 $6.000 $17.000 $5.000 $5.500 $5.000 $8.000
FL BS (CMP IN PLC)(TY E GR 4)
TON 53.000 $30.000 $150.000 $190.000 $80.810 $50.000 $65.110 $110.000 $100.000
LIME TRT (SUBGRADE) (8")
SY 117.000 $3.000 $6.000 $60.000 $26.430 $4.000 $34.100 $261.000 $80.000
D-GR HMA TY-D SAC-B PG64-22
TON 75.000 $117.000 $255.000 $350.000 $166.330 $200.000 $330.000 $359.000 $500.000
TACK COAT
GAL 56.000 $3.400 $15.000 $15.000 $14.000 $4.000 $11.000 $32.000 $50.000
PLANE ASPH CONC PAV(0" TO 4")
SY 443.000 $10.000 $12.000 $16.000 $12.000 $15.000 $16.500 $19.000 $50.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 32.000 $327.000 $360.000 $369.000 $330.400 $427.000 $357.500 $350.000 $400.000
CL A CONC (MISC)
CY 0.500 $1,000.000 $2,500.000 $1,500.000 $2,400.000 $5,000.000 $1,728.040 $250.000 $2,000.000
INLET (COMPL)(POD)(FG)(3FTX5FT)
EA 1.000 $10,000.000 $3,500.000 $7,500.000 $8,400.000 $8,511.000 $23,375.000 $4,828.000 $9,000.000
MOBILIZATION
LS 1.000 $44,129.000 $40,000.000 $55,000.000 $12,000.000 $100,000.000 $63,893.200 $45,000.000 $150,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $3,500.000 $4,000.000 $900.000 $3,200.000 $1,000.000 $3,850.000 $4,250.000 $7,000.000
TMA (STATIONARY)
DAY 21.000 $210.000 $500.000 $1.000 $500.000 $2,000.000 $1.100 $123.000 $500.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 112.000 $50.000 $20.000 $50.000 $32.000 $50.000 $1.100 $53.000 $50.000
CONSTRUCTION EXITS (REMOVE)
SY 112.000 $10.000 $5.000 $15.000 $22.000 $9.000 $1.100 $22.000 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 819.000 $3.400 $4.000 $7.000 $12.000 $4.000 $0.010 $4.000 $12.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 819.000 $1.300 $1.000 $2.000 $1.500 $1.000 $0.010 $1.000 $3.000
BIODEG EROSN CONT LOGS (INSTL) (6")
LF 72.000 $3.000 $8.000 $12.000 $12.000 $15.000 $5.500 $6.000 $40.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 72.000 $1.100 $1.000 $3.000 $2.000 $1.000 $5.500 $1.000 $10.000
CONC CURB (TY II)
LF 51.000 $45.000 $7.000 $60.000 $30.000 $50.000 $67.760 $170.000 $60.000
CONC CURB & GUTTER (TY I)
LF 45.000 $40.000 $15.000 $70.000 $30.000 $50.000 $67.760 $138.000 $80.000
DRIVEWAYS (CONC)
SY 69.000 $110.000 $65.000 $140.000 $85.000 $108.000 $155.660 $235.000 $108.000
DRIVEWAYS (ACP)
SY 159.000 $61.250 $55.000 $60.000 $85.000 $50.000 $115.500 $105.000 $100.000
CONC SIDEWALKS (4")
SY 518.000 $75.000 $60.000 $85.000 $65.000 $61.000 $124.010 $115.000 $90.000
CURB RAMPS (TY 5)
EA 3.000 $3,400.000 $1,600.000 $2,500.000 $5,000.000 $1,500.000 $3,630.140 $6,862.000 $3,500.000
CURB RAMPS (TY 7)
EA 8.000 $1,890.000 $1,550.000 $2,500.000 $5,000.000 $1,500.000 $3,630.140 $4,115.000 $3,000.000
CURB RAMPS (TY 21)
EA 1.000 $5,000.000 $1,500.000 $2,500.000 $5,000.000 $1,500.000 $3,630.140 $5,408.000 $3,000.000
CONDT (PVC) (SCH 80) (1")
LF 455.000 $11.000 $11.000 $20.000 $17.920 $12.100 $16.500 $19.000 $12.000
CONDT (PVC) (SCH 80) (2")
LF 310.000 $15.500 $20.000 $25.000 $22.400 $21.120 $19.800 $24.000 $20.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 335.000 $34.000 $28.000 $50.000 $44.800 $45.100 $33.000 $47.000 $30.000
CONDT (PVC) (SCH 80) (4")
LF 15.000 $24.000 $30.000 $32.000 $28.000 $64.900 $27.500 $30.000 $35.000
CONDT (PVC) (SCH 80) (4") (BORE)
LF 40.000 $42.500 $45.000 $54.000 $48.160 $55.000 $44.000 $51.000 $50.000
ELEC CONDR (NO.6) BARE
LF 665.000 $2.000 $3.000 $2.500 $2.130 $2.530 $2.200 $2.000 $3.000
ELEC CONDR (NO.4) BARE
LF 20.000 $2.000 $4.000 $3.500 $3.140 $3.740 $4.400 $3.000 $4.000
ELEC CONDR (NO.4) INSULATED
LF 35.000 $2.000 $4.000 $4.250 $3.840 $4.180 $4.400 $4.000 $4.000
ELEC CONDR (1/0) BARE
LF 60.000 $5.000 $7.000 $9.250 $8.290 $8.800 $6.600 $9.000 $7.000
ELEC CONDR (1/0) INSULATED
LF 120.000 $5.000 $7.250 $10.000 $8.850 $9.180 $6.600 $9.000 $7.000
TRAY CABLE (4 CONDR) (12 AWG)
LF 395.000 $3.000 $4.000 $3.750 $3.300 $4.450 $3.300 $4.000 $4.000
GROUND BOX TY D (162922)W/APRON
EA 5.000 $1,660.000 $2,000.000 $1,975.000 $1,769.600 $1,386.000 $1,100.000 $1,873.000 $2,000.000
REMOVE GROUND BOX
EA 4.000 $362.000 $150.000 $750.000 $672.000 $548.900 $550.000 $711.000 $150.000
ZINC-COAT STL WIRE STRAND (3/16")
LF 130.000 $3.500 $3.000 $2.500 $2.240 $2.910 $3.300 $2.000 $3.500
ZINC-COAT STL WIRE STRAND (5/16")
LF 700.000 $3.000 $3.000 $2.750 $2.410 $3.300 $2.200 $3.000 $3.500
RELOCATE ELECTRICAL SERVICES
EA 1.000 $1,100.000 $500.000 $938.000 $840.000 $3,929.750 $1,650.000 $889.000 $500.000
ELC SRV TY D 120/240 070(NS)SS(E)PS(U)
EA 1.000 $12,370.000 $9,000.000 $7,688.000 $6,888.000 $12,890.900 $7,397.500 $73.000 $10,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 4.000 $800.000 $450.000 $1,200.000 $2,400.000 $673.000 $852.500 $1,619.000 $1,500.000
REMOVE SM RD SN SUP&AM
EA 1.000 $210.000 $200.000 $440.000 $2,400.000 $128.000 $165.000 $614.000 $500.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 90.000 $1.000 $8.000 $3.500 $25.400 $3.000 $3.080 $6.000 $5.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 419.000 $6.250 $11.000 $12.250 $10.080 $6.000 $10.780 $16.000 $11.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 2.000 $85.000 $400.000 $225.000 $280.000 $136.000 $198.000 $200.000 $350.000
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 2.000 $220.000 $500.000 $300.000 $448.000 $243.000 $264.000 $350.000 $500.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 1.000 $85.000 $400.000 $225.000 $448.000 $156.000 $198.000 $250.000 $500.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 90.000 $0.600 $8.000 $3.500 $1.460 $2.000 $1.760 $3.000 $2.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 180.000 $0.500 $8.000 $2.000 $1.460 $2.000 $1.760 $3.000 $2.000
ELIM EXT PM & MRKS (4")
LF 14.000 $1.250 $4.000 $2.250 $1.120 $5.000 $1.980 $5.000 $2.000
ELIM EXT PM & MRKS (8")
LF 114.000 $1.250 $8.000 $2.500 $2.240 $6.000 $2.200 $8.000 $3.000
ELIM EXT PM & MRKS (24")
LF 158.000 $2.800 $20.000 $5.000 $6.720 $10.000 $4.400 $10.000 $7.000
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000 $21,150.000 $52,000.000 $36,250.000 $32,480.000 $50,068.700 $52,800.000 $34,374.000 $50,000.000
REMOVING TRAFFIC SIGNALS
EA 1.000 $3,171.000 $3,250.000 $4,000.000 $3,584.000 $13,020.700 $5,500.000 $3,793.000 $4,000.000
VEH SIG SEC (12")LED(GRN)
EA 12.000 $327.500 $350.000 $363.000 $324.800 $304.700 $291.500 $344.000 $400.000
VEH SIG SEC (12")LED(GRN ARW)
EA 4.000 $325.000 $350.000 $375.000 $336.000 $321.200 $291.500 $356.000 $400.000
VEH SIG SEC (12")LED(YEL)
EA 12.000 $325.750 $350.000 $363.000 $324.800 $308.000 $291.500 $344.000 $400.000
VEH SIG SEC (12")LED(YEL ARW)
EA 4.000 $325.750 $350.000 $375.000 $336.000 $312.400 $291.500 $356.000 $400.000
VEH SIG SEC (12")LED(RED)
EA 12.000 $324.500 $350.000 $363.000 $324.800 $304.700 $291.500 $344.000 $400.000
PED SIG SEC (LED)(COUNTDOWN)
EA 8.000 $644.500 $800.000 $688.000 $616.000 $871.200 $748.000 $652.000 $1,000.000
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 8.000 $138.000 $200.000 $160.000 $140.000 $266.200 $143.000 $148.000 $250.000
BACKPLATE W/REF BRDR(5 SEC)(VENT)ALUM
EA 4.000 $250.000 $270.000 $230.000 $207.200 $355.300 $264.000 $219.000 $400.000
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 1,450.000 $1.750 $2.000 $2.450 $2.130 $2.750 $2.750 $2.000 $3.000
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 1,450.000 $1.000 $3.000 $3.250 $2.800 $4.070 $2.750 $3.000 $4.000
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 1,620.000 $2.500 $4.000 $3.500 $3.140 $4.400 $2.750 $3.000 $4.000
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 1,210.000 $3.500 $5.000 $4.500 $3.920 $5.500 $3.580 $4.000 $5.000
INS TRF SIG PL AM (S)STR(TY D)LUM
EA 2.000 $12,433.000 $11,500.000 $18,125.000 $16,240.000 $14,072.300 $14,905.000 $17,187.000 $11,500.000
PED POLE ASSEMBLY
EA 8.000 $1,230.000 $3,000.000 $1,100.000 $2,408.000 $4,261.400 $2,475.000 $2,548.000 $3,000.000
PED DETECT PUSH BUTTON (APS)
EA 8.000 $970.000 $900.000 $1,100.000 $980.000 $1,089.000 $852.500 $1,037.000 $1,200.000
PED DETECTOR CONTROLLER UNIT
EA 1.000 $3,552.000 $3,650.000 $4,375.000 $3,920.000 $4,606.800 $3,850.000 $4,149.000 $4,000.000
REMOVAL OF CONTROL CABINET(GRND MNT)
EA 1.000 $1,000.000 $550.000 $1,375.000 $1,232.000 $1,599.400 $1,375.000 $1,304.000 $750.000
REMOVABLE BOLLARD
EA 2.000 $1,000.000 $3,500.000 $2,500.000 $7,000.000 $1,500.000 $1,375.000 $3,543.000 $2,500.000
BBU SYSTEM (EXTERNAL BATTERY CABINET)
EA 1.000 $8,412.000 $8,100.000 $11,850.000 $10,584.000 $12,579.600 $9,900.000 $11,201.000 $8,500.000
Totals: $447,695.200 $493,025.000 $570,327.750 $581,092.670 $591,189.390 $597,619.276 $662,825.000 $777,697.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $18,862.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $18,862.00
Total: $37,724.00