Show Job Controls
Bid Cobra

HIDALGO CS (0921-02-500)

Items: 40

County: HIDALGO
Length: N/A
Highway: CS
District: PHARR
Control Number: 0921-02-500
DBE Goal: N/A
Project: STP 2B23(008)HESG
Guaranty: N/A
Time: 96 WORKING DAYS
Engineer's Estimate: $212,908.45
Date: 06/28/2023 (2 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
HECTOR SILLER
JESUS NORIEGA
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$212,908.45
$223,433.01
Over/Under Est: 4.94% $10,524.56
Over/Under Est: 16.76% $35,687.65
Amt Left: 11.26% $25,163.09
$299,667.51
Over/Under Est: 40.75% $86,759.06
Amt Left: 34.12% $76,234.50
Delta: -20.54% -$51,071.41
Subcontractor Percentage Amount
TEXAS HIGHWAY SYSTEMS, INC. 2.77% $6,280.50
HIGHWAY BARRICADES AND SERVICES, LLC 1.79% $4,058.52
Total: 4.56% $10,339.02

Bid Items & Bid Tabulations

40 Total 0 of 40
HIDALGO  |  CS  |  PHARR  |  0921-02-500  |  06/28/2023  |  $212,908.45  |  STP 2B23(008)HESG  |  HAZARD ELIM & SAFETY  |  96 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
THE LEVY COMPANY, INC.
D&G ENERGY CORPORATION
TRAF-TEX, INC.
DRILL SHAFT (TRF SIG POLE) (24 IN)
LF 6.000 $130.000 $264.560 $205.000 $112.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 84.000 $270.000 $325.980 $265.000 $583.000
MOBILIZATION
LS 1.000 $18,000.000 $22,343.300 $25,000.000 $29,183.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $4,000.000 $1,564.160 $3,500.000 $2,706.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 160.000 $3.450 $5.280 $8.000 $10.750
TEMP SEDMT CONT FENCE (REMOVE)
LF 160.000 $0.900 $1.610 $2.200 $5.630
CONC SIDEWALKS (4")
SY 6.000 $50.000 $400.000 $240.000 $428.000
CONDT (PVC) (SCH 40) (2")
LF 47.000 $11.000 $15.720 $26.000 $16.100
CONDT (PVC) (SCH 40) (4")
LF 70.000 $22.500 $30.370 $27.000 $26.400
ELEC CONDR (NO.8) BARE
LF 85.000 $1.000 $1.640 $1.200 $1.450
ELEC CONDR (NO.6) BARE
LF 53.000 $1.250 $2.040 $1.400 $1.500
ELEC CONDR (NO.6) INSULATED
LF 102.000 $1.400 $2.080 $1.550 $1.770
TRAY CABLE (4 CONDR) (12 AWG)
LF 354.000 $2.050 $2.560 $2.250 $3.500
GROUND BOX TY A (122311)W/APRON
EA 1.000 $860.000 $1,136.900 $1,100.000 $948.000
GROUND BOX TY C (162911)W/APRON
EA 1.000 $1,505.000 $1,580.140 $1,400.000 $872.000
ZINC-COAT STL WIRE STRAND (3/8")
LF 1,224.000 $2.300 $2.920 $3.350 $2.350
ELC SRV TY T 120/240 000(NS)GS(L)TS(O)
EA 2.000 $2,220.000 $3,148.390 $3,300.000 $2,045.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 4.000 $275.000 $1,031.180 $850.000 $1,762.000
REMOVE SM RD SN SUP&AM
EA 2.000 $125.000 $203.300 $40.000 $317.000
PAVEMENT SEALER 24"
LF 24.000 $0.850 $3.000 $24.000 $22.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 196.000 $13.250 $20.000 $30.000 $27.800
PAV SURF PREP FOR MRK (24")
LF 24.000 $0.750 $3.000 $4.800 $4.440
INSTALL HWY TRF SIG (FLASH BEACON)
EA 1.000 $2,000.000 $3,104.510 $3,100.000 $11,599.000
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000 $24,000.000 $23,504.040 $28,800.000 $32,475.000
VEH SIG SEC (12")LED(GRN)
EA 9.000 $225.000 $277.280 $265.000 $250.000
VEH SIG SEC (12")LED(GRN ARW)
EA 1.000 $225.000 $276.730 $265.000 $250.000
VEH SIG SEC (12")LED(YEL)
EA 13.000 $225.000 $277.260 $265.000 $250.000
VEH SIG SEC (12")LED(YEL ARW)
EA 2.000 $225.000 $277.340 $265.000 $250.000
VEH SIG SEC (12")LED(RED)
EA 13.000 $225.000 $277.260 $265.000 $250.000
VEH SIG SEC (12")LED(RED ARW)
EA 1.000 $210.000 $276.730 $265.000 $250.000
PED SIG SEC (LED)(COUNTDOWN)
EA 2.000 $500.000 $658.890 $540.000 $635.000
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 4.000 $200.000 $140.180 $135.000 $176.000
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 1,766.000 $2.350 $2.870 $2.950 $3.560
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 500.000 $2.750 $3.380 $3.250 $3.220
INS TRF SIG PL AM (S)STR(TY B)
EA 2.000 $6,110.000 $6,400.290 $7,300.000 $7,974.000
INS TRF SIG PL AM (S)STR(TY B)LUM
EA 4.000 $6,720.000 $7,677.170 $8,800.000 $9,010.000
PED POLE ASSEMBLY
EA 1.000 $940.000 $1,024.240 $910.000 $2,030.000
PED DETECT PUSH BUTTON (APS)
EA 2.000 $705.000 $761.500 $850.000 $4,338.000
TMA (STATIONARY)
DAY 96.000 $100.000 $105.410 $140.000 $172.000
RVDS(PRESENCE AND ADVANCE DET)
EA 4.000 $9,150.000 $7,896.260 $8,000.000 $7,434.000
Totals: $212,908.450 $223,433.010 $248,596.100 $299,667.510