Show Job Controls
Bid Cobra

HIDALGO 1 MILE RD W (0921-02-492)

Items: 54

County: HIDALGO
Length: 0.0000 MILES
Highway: 1 MILE RD W
District: PHARR
Control Number: 0921-02-492
DBE Goal: 5.0%
Project: BR 2024(490)
Guaranty: $70,000.00
Time: 306 WORKING DAYS
Engineer's Estimate: $3,497,309.28
Date: 01/08/2025 (1 year ago)
Contract Number: 1253222
Type: BRIDGE REPLACEMENT
Project ID: A00181043
Contract Type: Federal
Project Description: REPLACE BRIDGE
Mail/Deliver Bids To: N/A
HECTOR SILLER
JESUS NORIEGA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$3,497,309.28
$2,537,954.75
Over/Under Est: -27.43% -$959,354.53
$2,694,660.94
Over/Under Est: -22.95% -$802,648.34
Amt Left: 6.17% $156,706.19
Over/Under Est: -13.36% -$467,141.68
Amt Left: 19.39% $492,212.85
Delta: -12.45% -$335,506.66
$4,164,157.22
Over/Under Est: 19.07% $666,847.94
Amt Left: 64.08% $1,626,202.47
Delta: -37.42% -$1,133,989.62
Subcontractor Percentage Amount
MUNOZ FOUNDATION DRILLING, INC. 7.10% $180,194.79
SOIL TECH ADVANCE INC. 2.26% $57,357.78
MID VALLEY PEST CONTROL LLC 0.91% $23,095.39
GUERRA CONSTRUCTION COMPANY 0.80% $20,303.64
CERTIFIED PLACERS LLC 0.62% $15,735.32
HIGHWAY BARRICADES AND SERVICES, LLC 0.44% $11,167.00
Total: 12.13% $307,853.92

Bid Items & Bid Tabulations

54 Total 0 of 54
HIDALGO  |  1 MILE RD W  |  PHARR  |  0921-02-492  |  01/08/2025  |  $3,497,309.28  |  BR 2024(490)  |  BRIDGE REPL  |  306 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS CORDIA CONSTRUCTION, LLC
FOREMOST PAVING, INC.
ARANDA BROTHERS CONSTRUCTION CO., INC.
IOC COMPANY, LLC
PREPARING ROW
STA 7.700 $16,916.000 $1,200.000 $11,300.000 $28,000.000 $50,000.000
RMV (0"-8") TRT/UNTRT BASE & ASPH PAV
SY 972.000 $120.000 $17.000 $29.950 $20.000 $25.000
EXCAV (ROADWAY)
CY 614.000 $40.000 $16.000 $21.820 $20.000 $40.000
EMBANK (FNL)(OC)(TY A)
CY 79.000 $100.000 $20.000 $482.730 $30.000 $25.000
COMPOST MANUF TOPSOIL (4")
SY 1,692.000 $10.000 $10.000 $12.090 $20.000 $24.000
DRILL SEED (PERM_RURAL_CLAY)
SY 1,692.000 $25.000 $1.000 $0.320 $1.150 $1.000
DRILL SEED (TEMP_WARM_COOL)
SY 1,692.000 $1.000 $1.000 $0.250 $1.150 $1.000
VEGETATIVE WATERING
TGL 49.000 $386.000 $35.000 $60.000 $50.000 $80.000
FL BS (CMP IN PLC)(TY E GR 4) (10")
SY 2,592.000 $38.000 $25.000 $13.480 $60.000 $30.000
CEM TRT(PLNT MX)(CL N)(TY E)(GR 4)(10")
SY 2,592.000 $150.000 $6.000 $25.860 $55.000 $45.000
PRIME COAT(MC-30 OR AE-P)
GAL 519.000 $10.000 $13.000 $14.140 $20.000 $50.000
D-GR HMA TY-D SAC-A PG64-22
TON 160.000 $400.000 $150.000 $382.210 $300.000 $400.000
CEM STABIL BKFL
CY 56.400 $300.000 $110.000 $200.000 $90.000 $250.000
DRILL SHAFT (24 IN)
LF 974.000 $400.000 $220.000 $650.000 $450.000 $571.000
CL C CONC (ABUT)(SRC)
CY 48.200 $1,650.000 $1,500.000 $2,500.000 $1,400.000 $2,500.000
CL C CONC (CAP)
CY 26.100 $1,800.000 $4,250.000 $2,500.000 $1,600.000 $10,000.000
CL C CONC (COLUMN)
CY 8.500 $1,850.000 $3,000.000 $3,000.000 $1,300.000 $25,000.000
REINF CONC SLAB (SLAB BEAM)
SF 5,382.000 $50.000 $56.000 $25.000 $24.000 $40.000
PRESTR CONC SLAB BEAM (4SB12)
LF 1,318.500 $250.000 $350.000 $200.000 $350.000 $300.000
RIPRAP (MOW STRIP)(4 IN)
CY 8.000 $730.000 $1,610.000 $1,500.000 $650.000 $1,000.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 293.000 $350.000 $250.000 $190.000 $600.000 $500.000
RAIL (TY T223)
LF 358.000 $250.000 $350.000 $250.000 $200.000 $300.000
RC PIPE (CL III)(18 IN)
LF 142.000 $145.000 $140.000 $120.000 $150.000 $250.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 8.000 $1,800.000 $2,050.000 $1,500.000 $3,500.000 $2,500.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 2.000 $38,300.000 $75,000.000 $50,000.000 $50,000.000 $150,000.000
MOBILIZATION
LS 1.000 $274,230.080 $175,500.000 $200,000.000 $300,500.000 $380,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 17.000 $11,400.000 $5,000.000 $5,000.000 $6,000.000 $2,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $14,100.000 $50.000 $11,750.000 $20,000.000 $17,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 172.000 $100.000 $120.000 $80.000 $30.000 $65.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 156.000 $100.000 $170.000 $100.000 $40.000 $75.000
ROCK FILTER DAMS (REMOVE)
LF 328.000 $100.000 $49.000 $20.000 $10.000 $25.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 312.000 $50.000 $30.000 $30.800 $10.000 $50.000
CONSTRUCTION EXITS (REMOVE)
SY 312.000 $20.000 $24.000 $17.550 $5.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,117.000 $25.000 $4.000 $6.000 $4.000 $4.250
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,117.000 $25.000 $1.000 $3.000 $1.000 $1.350
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 40.000 $25.000 $15.000 $20.000 $10.000 $15.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 40.000 $20.000 $5.000 $10.000 $1.000 $5.000
DRIVEWAYS (ACP)
SY 322.000 $195.000 $72.000 $151.540 $65.000 $400.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $4,000.000 $1,190.000 $3,885.000 $2,500.000 $1,272.750
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,650.000 $2,925.000 $4,865.000 $4,500.000 $3,128.390
CRASH CUSH ATTEN (INSTL)(S)(N)(TL2)
EA 8.000 $23,400.000 $45,000.000 $38,450.000 $28,500.000 $35,492.020
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 1.000 $441.000 $1,500.000 $1,665.000 $650.000 $245.990
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 4.000 $1,000.000 $24.000 $185.000 $50.000 $25.670
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 2.000 $1,000.000 $30.000 $185.000 $50.000 $31.550
INSTL OM ASSM (OM-2Y)(WC)GND
EA 8.000 $1,000.000 $58.000 $185.000 $50.000 $62.030
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 130.000 $7.500 $2.000 $8.400 $2.200 $9.610
PAVEMENT SLER 6"
LF 2,855.000 $10.000 $1.000 $0.550 $1.500 $0.630
PAVEMENT SLER 12"
LF 130.000 $12.000 $2.000 $2.600 $2.250 $2.970
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 1,855.000 $10.000 $2.000 $1.600 $2.500 $1.830
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 1,000.000 $10.000 $2.000 $1.600 $2.500 $1.830
REFL PAV MRKR TY II-A-A
EA 16.000 $50.000 $20.000 $8.800 $22.000 $10.070
PAV SURF PREP FOR MRK (6")
LF 2,855.000 $10.000 $0.250 $0.200 $0.500 $0.230
PAV SURF PREP FOR MRK (12")
LF 130.000 $12.000 $0.500 $0.500 $0.800 $0.570
BIRD EXCLUSION METHOD
SF 5,400.000 $15.720 $5.000 $2.100 $7.700 $6.060
Totals: $3,497,309.280 $2,537,954.750 $2,694,660.940 $3,030,167.600 $4,164,157.220