REMOVING CONC (PAV)
|
SY
|
10.000
|
$25.000
|
$18.250
|
$131.000
|
$10.000
|
$63.180
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
242.000
|
$15.000
|
$11.700
|
$6.000
|
$9.000
|
$35.100
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
1.000
|
$20.000
|
$40.000
|
$492.000
|
$10.000
|
$63.180
|
|
|
REMOVING CONC (FOUNDATIONS)
|
CY
|
1.500
|
$200.000
|
$93.000
|
$476.000
|
$100.000
|
$421.200
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
1,158.000
|
$10.000
|
$11.700
|
$4.000
|
$8.000
|
$35.100
|
|
|
REMOVING CONC (CURB OR CURB & GUTTER)
|
LF
|
3,656.000
|
$5.000
|
$7.000
|
$3.000
|
$2.000
|
$14.040
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
725.000
|
$7.000
|
$9.500
|
$5.000
|
$10.000
|
$35.100
|
|
|
REMOVING STAB BASE AND ASPH PAV(0"-16")
|
SY
|
414.000
|
$12.000
|
$16.400
|
$7.000
|
$10.000
|
$56.160
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
10.200
|
$10.000
|
$46.800
|
$42.000
|
$10.000
|
$35.100
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
23.700
|
$20.000
|
$46.800
|
$49.000
|
$11.000
|
$49.140
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
305.300
|
$10.000
|
$11.000
|
$17.000
|
$20.000
|
$28.080
|
|
|
FURNISHING AND PLACING TOPSOIL
|
CY
|
860.000
|
$30.000
|
$26.500
|
$28.000
|
$15.000
|
$28.080
|
|
|
BLOCK SODDING
|
SY
|
7,772.000
|
$5.000
|
$4.750
|
$7.000
|
$5.000
|
$4.490
|
|
|
VEGETATIVE WATERING
|
MG
|
130.803
|
$30.000
|
$18.000
|
$15.000
|
$20.000
|
$25.000
|
|
|
VEGETATION BARRIER
|
SY
|
152.000
|
$1.500
|
$89.840
|
$13.000
|
$12.000
|
$6.750
|
|
|
D-GR HMA(SQ) TY-C PG76-22
|
TON
|
348.720
|
$80.000
|
$89.850
|
$115.000
|
$115.000
|
$250.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
72.000
|
$40.000
|
$27.900
|
$166.000
|
$50.000
|
$49.140
|
|
|
PLANE ASPH CONC PAV(0" TO 4")
|
SY
|
1,619.000
|
$4.500
|
$4.700
|
$10.000
|
$10.000
|
$5.670
|
|
|
CONC PAV (JOINT REINF) (10")
|
SY
|
261.000
|
$45.000
|
$64.000
|
$69.000
|
$60.000
|
$91.260
|
|
|
CL C CONC (MISC)
|
CY
|
15.600
|
$600.000
|
$717.000
|
$441.000
|
$800.000
|
$631.800
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
55.100
|
$450.000
|
$540.000
|
$355.000
|
$310.000
|
$561.600
|
|
|
INLET (COMPL) (EXT)(TY I)
|
EA
|
1.000
|
$4,500.000
|
$1,723.000
|
$2,178.000
|
$1,750.000
|
$8,424.000
|
|
|
GRATE & FRAME
|
EA
|
40.000
|
$1,200.000
|
$950.000
|
$1,700.000
|
$400.000
|
$1,404.000
|
|
|
ADJUSTING MANHOLES
|
EA
|
7.000
|
$600.000
|
$675.000
|
$650.000
|
$1,050.000
|
$1,053.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$63,000.000
|
$145,000.000
|
$199,500.000
|
$170,000.000
|
$200,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
17.000
|
$1,500.000
|
$2,668.000
|
$1,000.000
|
$3,500.000
|
$4,212.000
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
2,000.000
|
$4.000
|
$0.940
|
$2.000
|
$10.000
|
$9.340
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,000.000
|
$4.000
|
$3.120
|
$6.000
|
$7.000
|
$5.740
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,000.000
|
$2.500
|
$0.500
|
$1.000
|
$1.000
|
$1.790
|
|
|
REMOVE AND RELAY PAVERS
|
SY
|
189.000
|
$35.000
|
$58.500
|
$26.000
|
$30.000
|
$76.910
|
|
|
CONC CURB (TY II)
|
LF
|
1,271.000
|
$12.000
|
$23.750
|
$34.000
|
$8.000
|
$27.870
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
3,125.000
|
$18.000
|
$35.500
|
$33.000
|
$7.000
|
$33.760
|
|
|
CONC CURB & GUTTER(VALLEY GUTTER)(36")
|
LF
|
19.000
|
$40.000
|
$46.000
|
$90.000
|
$35.000
|
$49.320
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,584.000
|
$57.000
|
$56.000
|
$41.000
|
$50.000
|
$74.400
|
|
|
DRIVEWAYS (ACP)
|
SY
|
53.000
|
$40.000
|
$84.000
|
$91.000
|
$30.000
|
$85.400
|
|
|
CONC SIDEWALKS (4")
|
SY
|
5,983.000
|
$33.000
|
$41.000
|
$37.000
|
$45.000
|
$55.930
|
|
|
CURB RAMPS (TY 1)
|
SY
|
523.000
|
$55.000
|
$89.000
|
$69.000
|
$80.000
|
$164.110
|
|
|
CURB RAMPS (TY 2)
|
SY
|
68.000
|
$55.000
|
$92.000
|
$66.000
|
$75.000
|
$163.220
|
|
|
CURB RAMPS (TY 3)
|
SY
|
456.000
|
$55.000
|
$93.000
|
$31.000
|
$75.000
|
$163.220
|
|
|
CURB RAMPS (TY 5)
|
SY
|
112.000
|
$55.000
|
$95.000
|
$142.000
|
$75.000
|
$118.000
|
|
|
CURB RAMPS (TY 6)
|
SY
|
237.000
|
$55.000
|
$89.000
|
$68.000
|
$75.000
|
$90.320
|
|
|
CURB RAMPS (TY 7)
|
SY
|
1,756.000
|
$55.000
|
$82.000
|
$63.000
|
$75.000
|
$104.550
|
|
|
CURB RAMPS (TY 10)
|
SY
|
337.000
|
$55.000
|
$77.000
|
$75.000
|
$75.000
|
$154.280
|
|
|
CURB RAMPS (TY 20)
|
SY
|
10.000
|
$55.000
|
$80.000
|
$203.000
|
$75.000
|
$112.060
|
|
|
CONC SIDEWALKS (SPECIAL) (TYPE B)
|
SY
|
731.000
|
$65.000
|
$85.000
|
$50.000
|
$75.000
|
$88.450
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
1.000
|
$250.000
|
$240.000
|
$307.000
|
$250.000
|
$253.370
|
|
|
MAILBOX INSTALL-S (TIM-POST) TY 5
|
EA
|
1.000
|
$300.000
|
$185.000
|
$327.000
|
$275.000
|
$489.060
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
475.000
|
$15.000
|
$4.500
|
$28.000
|
$25.000
|
$15.110
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
610.000
|
$18.000
|
$18.000
|
$31.000
|
$28.000
|
$62.340
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
1,010.000
|
$1.500
|
$1.550
|
$2.000
|
$3.000
|
$1.380
|
|
|
GROUND BOX TY D (162922)
|
EA
|
55.000
|
$500.000
|
$465.000
|
$990.000
|
$1,000.000
|
$507.500
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
16.000
|
$800.000
|
$585.000
|
$1,275.000
|
$1,250.000
|
$984.610
|
|
|
REMOVE GROUND BOX
|
EA
|
43.000
|
$200.000
|
$25.000
|
$235.000
|
$250.000
|
$213.210
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
62.000
|
$300.000
|
$130.000
|
$818.000
|
$400.000
|
$305.910
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
526.000
|
$4.000
|
$1.050
|
$1.000
|
$2.500
|
$0.770
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
11,361.000
|
$2.500
|
$3.150
|
$2.000
|
$3.250
|
$2.620
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
2,821.000
|
$5.000
|
$6.300
|
$4.000
|
$6.150
|
$5.400
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
5.000
|
$25.000
|
$105.000
|
$127.000
|
$175.000
|
$106.630
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
1.000
|
$55.000
|
$131.250
|
$320.000
|
$325.000
|
$130.620
|
|
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
|
EA
|
9.000
|
$60.000
|
$42.000
|
$20.000
|
$120.000
|
$34.950
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
40.000
|
$6.000
|
$3.150
|
$3.000
|
$4.000
|
$2.730
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
16.000
|
$7.000
|
$6.300
|
$5.000
|
$8.000
|
$4.370
|
|
|
PAVEMENT SEALER 4"
|
LF
|
669.000
|
$0.600
|
$0.260
|
$0.250
|
$0.750
|
$0.190
|
|
|
PAVEMENT SEALER 8"
|
LF
|
526.000
|
$0.700
|
$0.620
|
$0.400
|
$0.750
|
$0.330
|
|
|
PAVEMENT SEALER 12"
|
LF
|
11,401.000
|
$1.000
|
$0.798
|
$0.500
|
$1.500
|
$0.980
|
|
|
PAVEMENT SEALER 24"
|
LF
|
2,837.000
|
$1.250
|
$1.580
|
$1.250
|
$1.750
|
$1.520
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
5.000
|
$10.000
|
$10.500
|
$38.000
|
$85.000
|
$30.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
1.000
|
$15.000
|
$10.500
|
$60.000
|
$95.000
|
$50.000
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
9.000
|
$20.000
|
$7.880
|
$6.000
|
$15.000
|
$15.560
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
20.000
|
$3.000
|
$0.790
|
$1.000
|
$1.500
|
$0.380
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
260.000
|
$2.500
|
$0.790
|
$1.000
|
$1.500
|
$0.270
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
389.000
|
$2.500
|
$0.790
|
$1.000
|
$1.500
|
$0.280
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
485.000
|
$1.250
|
$0.680
|
$1.000
|
$1.500
|
$0.380
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
999.000
|
$2.250
|
$1.370
|
$2.000
|
$2.250
|
$1.090
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
3,872.000
|
$2.500
|
$2.050
|
$3.000
|
$3.250
|
$1.360
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
9,093.000
|
$3.000
|
$4.100
|
$5.000
|
$4.150
|
$2.980
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
5.000
|
$15.000
|
$15.750
|
$103.000
|
$100.000
|
$77.370
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
2.000
|
$50.000
|
$15.750
|
$64.000
|
$95.000
|
$74.900
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
669.000
|
$0.200
|
$0.260
|
$0.150
|
$0.500
|
$0.350
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
526.000
|
$0.300
|
$0.530
|
$0.400
|
$1.000
|
$1.260
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
11,401.000
|
$0.400
|
$0.790
|
$0.600
|
$0.850
|
$1.440
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
2,837.000
|
$0.650
|
$1.580
|
$1.000
|
$1.250
|
$1.920
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
5.000
|
$5.000
|
$5.250
|
$63.000
|
$75.000
|
$20.520
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
1.000
|
$10.000
|
$5.250
|
$63.000
|
$75.000
|
$26.790
|
|
|
PAV SURF PREP FOR MRK (18")(YLD TRI)
|
EA
|
9.000
|
$15.000
|
$3.150
|
$6.000
|
$10.000
|
$11.030
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
500.000
|
$3.500
|
$1.750
|
$2.000
|
$2.000
|
$1.500
|
|
|
TRF SIG CBL (TY A)(14 AWG)(2 CONDR)
|
LF
|
2,620.000
|
$2.500
|
$1.630
|
$2.000
|
$2.000
|
$1.090
|
|
|
PED POLE ASSEMBLY
|
EA
|
7.000
|
$1,100.000
|
$1,290.000
|
$2,390.000
|
$2,000.000
|
$1,588.670
|
|
|
INSTALL OF VEHICLE DETECTORS
|
LF
|
10,000.000
|
$2.000
|
$1.670
|
$7.000
|
$7.000
|
$17.550
|
|
|
REMOVAL OF SIGNAL HEAD ASSM
|
EA
|
2.000
|
$200.000
|
$70.200
|
$287.000
|
$750.000
|
$150.450
|
|
|
INSTALL OF SIGNAL HEAD ASSM
|
EA
|
1.000
|
$600.000
|
$93.000
|
$1,200.000
|
$1,250.000
|
$1,263.600
|
|
|
REMOVAL OF PEDESTRIAN PUSH BUTTONS
|
EA
|
132.000
|
$75.000
|
$23.500
|
$95.000
|
$200.000
|
$83.860
|
|
|
INSTALL OF PEDESTRIAN PUSH BUTTONS
|
EA
|
130.000
|
$220.000
|
$118.200
|
$172.000
|
$300.000
|
$249.300
|
|
|
REMOVE PED POLE ASSM
|
EA
|
1.000
|
$300.000
|
$100.000
|
$473.000
|
$1,000.000
|
$868.200
|
|
|
TREE AND BRUSH REMOVAL
|
AC
|
5.000
|
$400.000
|
$1,250.000
|
$1,556.000
|
$6,750.000
|
$28,080.000
|
|
|
DECOMPOSED GRANITE
|
SY
|
152.000
|
$65.000
|
$62.000
|
$70.000
|
$40.000
|
$150.000
|
|
|
RETROFIT DET WARN SURF(SURF APP OR CIP)
|
EA
|
3.000
|
$350.000
|
$693.600
|
$610.000
|
$350.000
|
$280.800
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$2,500.000
|
$10,000.000
|
$5,774.000
|
$7,500.000
|
$11,232.000
|
|
Totals: |
$1,266,973.090
|
$1,608,279.044
|
$1,692,071.495
|
$1,706,783.760
|
$2,548,309.497
|