Show Job Controls
Bid Cobra

HIDALGO CR (0921-02-212)

Items: 62

County: HIDALGO
Length: N/A
Highway: CR
District: PHARR
Control Number: 0921-02-212
DBE Goal: N/A
Project: BR 2011(281)
Guaranty: N/A
Time: 180 WORKING DAYS
Engineer's Estimate: $780,556.20
Date: 08/08/2017 (8 years ago)
Contract Number: N/A
Type: REPLACE OFF-SYSTEM BRIDGE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$780,556.20
$1,033,763.03
Over/Under Est: 32.44% $253,206.83
Over/Under Est: 37.24% $290,663.69
Amt Left: 3.62% $37,456.86
$1,199,965.62
Over/Under Est: 53.73% $419,409.42
Amt Left: 16.08% $166,202.59
Delta: -12.02% -$128,745.73
Over/Under Est: 89.36% $697,529.95
Amt Left: 42.98% $444,323.12
Delta: -23.18% -$278,120.53

Bid Items & Bid Tabulations

62 Total 0 of 62
HIDALGO  |  CR  |  PHARR  |  0921-02-212  |  08/08/2017  |  $780,556.20  |  BR 2011(281)  |  REPLACE OFF-SYSTEM BRIDGE  |  180 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
IOC COMPANY, LLC
VALLEY INFRASTRUCTURE, INC.
FOREMOST PAVING, INC.
ARANDA BROTHERS CONSTRUCTION CO., INC.
PREPARING ROW
STA 7.500 $1,000.000 $4,500.000 $1,350.000 $1,875.000 $18,500.000
REMOVING CONC (RIPRAP)
SY 127.000 $15.000 $20.000 $10.500 $15.000 $10.000
REMOVING STAB BASE & ASPH PAV (9")
SY 711.000 $10.000 $10.000 $16.000 $12.000 $10.000
EXCAVATION (ROADWAY)
CY 281.000 $10.000 $18.000 $16.000 $27.500 $8.000
EXCAVATION (CHANNEL)
CY 918.000 $6.000 $16.000 $9.250 $10.000 $7.000
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 10.000 $12.000 $45.000 $52.000 $36.000 $8.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 1,343.000 $10.000 $16.500 $10.500 $22.000 $10.000
BLADING
STA 3.000 $170.000 $100.000 $835.000 $305.000 $2,500.000
FURNISHING AND PLACING TOPSOIL
CY 100.000 $40.000 $13.000 $20.000 $13.000 $20.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 1,690.000 $0.500 $0.500 $0.500 $0.800 $0.300
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 1,462.000 $0.500 $0.450 $0.450 $0.800 $0.300
DRILL SEEDING (TEMP) (WARM)
SY 3,152.000 $0.500 $0.200 $0.210 $0.800 $0.350
VEGETATIVE WATERING
MG 51.400 $45.000 $40.000 $38.000 $29.000 $40.000
FL BS (CMP IN PLC)(TY E GR 4)(FNAL POS)
CY 1,106.100 $26.000 $49.000 $30.000 $32.000 $35.000
LIME TRT (NEW BASE)(8")
SY 1,211.000 $5.000 $2.730 $3.680 $6.000 $12.000
LIME (HYD, COM, OR QK(SLURRY))
TON 9.000 $220.000 $185.000 $260.000 $200.000 $180.000
CEMENT
TON 23.000 $160.000 $175.000 $470.000 $200.000 $140.000
CEMENT TREAT (NEW BASE) (8")
SY 837.000 $3.500 $4.000 $5.600 $7.000 $18.000
CEMENT TREAT (SUBGRADE)(12")
SY 870.000 $3.000 $6.000 $8.000 $10.000 $10.000
PRIME COAT (MC-30)
GAL 396.800 $10.000 $4.500 $9.400 $8.000 $5.000
D-GR HMA TY-D SAC-B PG64-22
TON 161.800 $100.000 $105.000 $203.000 $215.000 $165.000
CEM STABIL BKFL
CY 134.400 $60.000 $235.000 $75.000 $130.000 $70.000
PRESTR CONC PIL (18 IN SQ)
LF 630.000 $90.000 $120.000 $120.000 $100.000 $180.000
DRILL SHAFT (36 IN)
LF 222.000 $150.000 $370.000 $360.000 $320.000 $450.000
CL C CONC (ABUT)
CY 99.600 $700.000 $600.000 $870.000 $1,200.000 $950.000
CL C CONC (RAIL FOUNDATION)
CY 1.900 $450.000 $1,950.000 $1,200.000 $1,000.000 $1,550.000
REINF CONC SLAB
SF 5,660.000 $14.000 $21.000 $20.000 $20.000 $15.000
PRESTR CONC GIRDER (TX28)
LF 834.430 $110.000 $140.000 $159.000 $170.000 $195.000
RIPRAP (CONC)(5 IN)
CY 81.600 $400.000 $275.000 $570.000 $900.000 $350.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 228.000 $120.000 $150.000 $300.000 $200.000 $250.000
RIPRAP (MOW STRIP)(4 IN)
CY 29.800 $500.000 $375.000 $400.000 $700.000 $650.000
RAIL (TY T223)
LF 268.000 $70.000 $110.000 $122.000 $120.000 $135.000
RAIL (TY C223)
LF 96.000 $80.000 $150.000 $185.000 $170.000 $95.000
RAIL (TY PR1)
LF 96.000 $90.000 $100.000 $118.000 $120.000 $130.000
ARMOR JOINT
LF 44.000 $60.000 $90.000 $145.000 $80.000 $100.000
RC PIPE (CL III)(18 IN)
LF 335.000 $60.000 $40.000 $63.000 $80.000 $35.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 4.000 $2,500.000 $2,400.000 $2,500.000 $4,000.000 $2,750.000
REMOV STR (PIPE)
LF 25.000 $15.000 $40.000 $27.000 $15.000 $10.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 2.000 $15,000.000 $20,000.000 $8,000.000 $30,000.000 $95,000.000
MOBILIZATION
LS 1.000 $70,000.000 $100,000.000 $88,000.000 $107,000.000 $149,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $1,500.000 $2,500.000 $2,500.000 $3,200.000 $2,500.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 323.600 $20.000 $20.000 $30.000 $18.000 $20.000
CONSTRUCTION EXITS (REMOVE)
SY 323.600 $8.000 $5.000 $10.000 $5.000 $10.000
FRNT END LOADER WORK (ERSN & SEDM CONT)
HR 20.000 $100.000 $95.000 $100.000 $110.000 $150.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,775.000 $5.000 $3.960 $4.000 $2.700 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,775.000 $1.000 $1.500 $1.000 $0.500 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 80.000 $3.000 $9.000 $7.000 $7.000 $8.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 80.000 $1.000 $2.000 $2.000 $2.600 $1.000
MTL W-BEAM GD FEN (TIM POST)
LF 200.000 $25.000 $20.000 $21.000 $22.000 $32.000
TERMINAL ANCHOR SECTION
EA 2.000 $2,500.000 $750.000 $850.000 $620.000 $1,500.000
MTL BEAM GD FEN TRANS (TL2)
EA 6.000 $1,000.000 $905.000 $1,100.000 $1,000.000 $1,300.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,500.000 $1,100.000 $1,000.000 $1,018.160 $1,250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,500.000 $2,200.000 $2,100.000 $2,400.000 $1,430.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 3.000 $475.000 $400.000 $950.000 $550.000 $350.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 2.000 $1,000.000 $300.000 $825.000 $660.000 $250.000
REMOVE SM RD SN SUP&AM
EA 7.000 $150.000 $75.000 $50.000 $75.000 $150.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
EA 12.000 $75.000 $50.000 $75.000 $80.000 $325.000
PAVEMENT SEALER 4"
LF 600.000 $10.000 $1.200 $0.620 $0.250 $2.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 1,500.000 $2.000 $1.600 $1.880 $1.200 $3.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 1,500.000 $2.000 $1.600 $1.880 $1.200 $3.000
REFL PAV MRKR TY II-A-A
EA 22.000 $15.000 $10.400 $7.000 $5.000 $10.000
PAV SURF PREP FOR MRK (4")
LF 1,040.000 $1.000 $0.280 $0.100 $0.250 $0.500
Totals: $780,556.200 $1,033,763.030 $1,071,219.890 $1,199,965.620 $1,478,086.150