Show Job Controls
Bid Cobra

HIDALGO SH 495 (0865-01-122)

Items: 108

County: HIDALGO
Length: 0.0000 MILES
Highway: SH 495
District: PHARR
Control Number: 0865-01-122
DBE Goal: 4.0%
Project: F 2025(955)
Guaranty: $92,000.00
Time: 304 WORKING DAYS
Engineer's Estimate: $4,592,266.81
Date: 08/07/2025 (10 months ago)
Contract Number: 8253008
Type: TRAFFIC SIGNAL IMPROVEMENTS
Project ID: A00209777
Contract Type: Federal
Project Description: IMPROVE TRAFFIC SIGNAL
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
JESUS NORIEGA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$4,592,266.81
Over/Under Est: -23.68% -$1,087,593.46
$3,633,473.11
Over/Under Est: -20.88% -$958,793.70
Amt Left: 3.68% $128,799.76
$4,278,678.87
Over/Under Est: -6.83% -$313,587.94
Amt Left: 22.08% $774,005.52
Delta: -17.76% -$645,205.76
Subcontractor Percentage Amount
PAVEMENT MARKINGS INC. 9.31% $326,285.09
TEXAS HIGHWAY SYSTEMS, INC. 4.13% $144,743.01
RIO GRANDE CONSTRUCTORS AND CONSTRUCTION MANAGEMENT LLC 3.16% $110,747.68
G & E ESCOBEDO CONSTRUCTION, INC. 2.28% $79,906.55
Total: 18.88% $661,682.33

Bid Items & Bid Tabulations

108 Total 0 of 108
HIDALGO  |  SH 495  |  PHARR  |  0865-01-122  |  08/07/2025  |  $4,592,266.81  |  F 2025(955)  |  TRAF SIGNAL IMPRVS  |  304 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.
THE LEVY COMPANY, LLC
TRAF-TEX, INC.
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 272.000 $390.000 $285.000 $400.000 $380.000
RC PIPE (CL III)(18 IN)
LF 48.000 $100.000 $135.000 $90.000 $100.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 4.000 $2,600.000 $2,320.000 $1,500.000 $1,666.000
REMOV STR (SET)
EA 4.000 $600.000 $425.000 $300.000 $333.000
MOBILIZATION
LS 1.000 $415,768.610 $205,000.000 $363,347.310 $382,972.350
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 19.000 $5,000.000 $3,500.000 $9,400.000 $2,916.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 34.000 $3,300.000 $385.000 $57.000 $3,213.000
TMA (STATIONARY)
DAY 304.000 $190.000 $330.000 $59.000 $421.200
TMA (MOBILE OPERATION)
DAY 304.000 $190.000 $200.000 $59.000 $558.900
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,115.000 $7.000 $10.000 $5.250 $7.820
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,115.000 $2.000 $2.000 $1.900 $1.810
CONC SIDEWALKS (4")
SY 70.000 $70.000 $100.000 $80.500 $100.000
CURB RAMPS (TY 1)
EA 19.000 $3,200.000 $4,250.000 $2,700.000 $3,000.000
CURB RAMPS (TY 3)
EA 1.000 $4,700.000 $3,850.000 $1,600.000 $1,778.000
CURB RAMPS (TY 5)
EA 5.000 $3,100.000 $4,200.000 $3,100.000 $3,444.000
CURB RAMPS (TY 7)
EA 4.000 $4,900.000 $2,500.000 $1,800.000 $2,000.000
CONDT (PVC) (SCH 40) (1")
LF 626.000 $20.000 $17.000 $14.000 $11.000
CONDT (PVC) (SCH 40) (2")
LF 2,007.000 $18.000 $10.000 $24.000 $16.000
CONDT (PVC) (SCH 40) (4")
LF 1,849.000 $35.000 $20.000 $31.000 $26.600
CONDT (PVC) (SCH 80) (4") (BORE)
LF 3,201.000 $50.000 $35.000 $55.000 $36.400
ELEC CONDR (NO.8) BARE
LF 7,081.000 $2.350 $1.200 $2.000 $1.600
ELEC CONDR (NO.6) BARE
LF 1,174.000 $2.500 $1.700 $2.350 $1.900
ELEC CONDR (NO.6) INSULATED
LF 2,348.000 $2.500 $2.000 $2.600 $2.430
TRAY CABLE (4 CONDR) (12 AWG)
LF 7,571.000 $3.000 $2.200 $3.050 $3.450
GROUND BOX TY A (122311)W/APRON
EA 63.000 $1,160.000 $780.000 $1,350.000 $1,041.000
GROUND BOX TY D (162922)W/APRON
EA 14.000 $1,600.000 $1,100.000 $1,600.000 $1,142.000
ZINC-COAT STL WIRE STRAND (3/16")
LF 9,030.000 $5.500 $1.200 $3.300 $2.000
ZINC-COAT STL WIRE STRAND (5/16")
LF 12,325.000 $5.500 $2.200 $3.200 $2.500
ELC SRV TY T 120/240 000(NS)GS(L)TS(O)
EA 17.000 $3,350.000 $2,100.000 $2,500.000 $5,350.000
ALUMINUM SIGNS (TY A)
SF 1,229.500 $50.000 $35.000 $29.000 $16.150
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 1.000 $840.000 $1,150.000 $1,500.000 $779.000
REMOVE SM RD SN SUP&AM
EA 1.000 $140.000 $275.000 $500.000 $122.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 48.000 $1.350 $3.800 $3.800 $2.220
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 5,618.000 $1.350 $2.200 $2.400 $2.220
PAVEMENT SLER 6"
LF 77,755.000 $0.750 $0.500 $0.450 $0.700
PAVEMENT SLER 8"
LF 5,666.000 $1.000 $0.900 $0.850 $1.110
PAVEMENT SLER 12"
LF 514.000 $1.850 $1.200 $1.200 $3.330
PAVEMENT SLER 24"
LF 5,671.000 $2.600 $2.800 $2.500 $6.670
PAVEMENT SLER (ARROW)
EA 74.000 $75.000 $12.500 $20.000 $89.000
PAVEMENT SLER (WORD)
EA 57.000 $85.000 $12.500 $20.000 $89.000
PAVEMENT SLER (DBL ARROW)
EA 4.000 $110.000 $35.000 $60.000 $178.000
PAVEMENT SLER (BIKE ARROW)
EA 6.000 $90.000 $20.000 $20.000 $56.000
PAVEMENT SLER (BIKE SYMBOL)
EA 6.000 $90.000 $20.000 $20.000 $67.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 4,620.000 $1.000 $1.200 $1.200 $1.500
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 24,885.000 $1.000 $1.000 $0.900 $1.500
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 1,390.000 $1.000 $1.200 $1.200 $1.500
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 44,990.000 $1.000 $1.000 $0.900 $1.500
PREFAB PM TY C (W)(24")(SLD)
LF 5,671.000 $17.000 $12.500 $12.000 $23.330
PREFAB PM TY C (W)(ARROW)
EA 74.000 $260.000 $285.000 $220.000 $378.000
PREFAB PM TY C (W)(DBL ARROW)
EA 4.000 $440.000 $485.000 $420.000 $755.000
PREFAB PM TY C (W)(WORD)
EA 57.000 $320.000 $310.000 $240.000 $539.000
PREFAB PM TY C (W)(BIKE ARROW)
EA 6.000 $210.000 $200.000 $160.000 $139.000
PREFAB PM TY C (W)(BIKE SYMBOL)
EA 6.000 $260.000 $200.000 $160.000 $278.000
PREFAB PM TY C (Y)(12")(SLD)
LF 514.000 $17.000 $7.500 $6.800 $13.400
REFL PAV MRKR TY I-C
EA 828.000 $5.000 $5.500 $4.800 $6.700
REFL PAV MRKR TY II-A-A
EA 1,677.000 $5.000 $4.500 $3.900 $6.700
REFL PAV MRKR TY II-C-R
EA 42.000 $5.000 $5.000 $5.750 $6.700
ELIM EXT PM & MRKS (4")
LF 80,298.000 $0.750 $1.000 $0.750 $0.670
ELIM EXT PM & MRKS (8")
LF 5,259.000 $1.200 $1.500 $1.400 $1.350
ELIM EXT PM & MRKS (12")
LF 3,984.000 $3.000 $2.000 $2.000 $2.000
ELIM EXT PM & MRKS (24")
LF 3,031.000 $8.000 $5.000 $5.000 $4.000
ELIM EXT PM & MRKS (ARROW)
EA 68.000 $125.000 $55.000 $50.000 $55.550
ELIM EXT PM & MRKS (DBL ARROW)
EA 3.000 $130.000 $100.000 $100.000 $111.000
ELIM EXT PM & MRKS (WORD)
EA 48.000 $135.000 $50.000 $50.000 $89.000
ELIM EXT PM & MARKS (BIKE ARROW)
EA 2.000 $65.000 $55.000 $50.000 $56.000
ELIM EXT PM & MARKS (BIKE SYMBOL)
EA 2.000 $65.000 $55.000 $50.000 $56.000
PAV SURF PREP FOR MRK (6")
LF 77,755.000 $0.300 $0.080 $0.100 $0.330
PAV SURF PREP FOR MRK (8")
LF 5,666.000 $0.450 $0.150 $0.200 $0.440
PAV SURF PREP FOR MRK (12")
LF 514.000 $0.500 $0.400 $0.400 $1.330
PAV SURF PREP FOR MRK (24")
LF 5,671.000 $2.000 $0.700 $0.600 $2.700
PAV SURF PREP FOR MRK (ARROW)
EA 74.000 $30.000 $6.000 $5.000 $28.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 4.000 $45.000 $12.000 $10.000 $55.550
PAV SURF PREP FOR MRK (WORD)
EA 57.000 $40.000 $6.000 $5.000 $44.440
PAV SURF PREP FOR MRK (BIKE ARROW)
EA 6.000 $40.000 $6.000 $5.000 $28.000
PAV SURF PREP FOR MRK (BIKE SYMBOL)
EA 6.000 $40.000 $6.000 $5.000 $28.000
INSTALL HWY TRF SIG (ISOLATED)
EA 17.000 $20,800.000 $8,500.000 $6,240.000 $31,784.000
REMOVING TRAFFIC SIGNALS
EA 17.000 $3,150.000 $2,500.000 $3,600.000 $3,100.000
VEH SIG SEC (12")LED(GRN)
EA 136.000 $290.000 $285.000 $320.000 $265.000
VEH SIG SEC (12")LED(GRN ARW)
EA 39.000 $290.000 $285.000 $320.000 $265.000
VEH SIG SEC (12")LED(YEL)
EA 136.000 $290.000 $285.000 $320.000 $265.000
VEH SIG SEC (12")LED(YEL ARW)
EA 73.000 $290.000 $285.000 $320.000 $265.000
VEH SIG SEC (12")LED(RED)
EA 142.000 $290.000 $285.000 $320.000 $265.000
VEH SIG SEC (12")LED(RED ARW)
EA 30.000 $290.000 $285.000 $320.000 $265.000
PED SIG SEC (LED)(COUNTDOWN)
EA 110.000 $810.000 $490.000 $800.000 $540.000
BACKPLATE W/REFL BRDR(4 SEC)
EA 41.000 $255.000 $170.000 $220.000 $248.000
BACKPLATE W/REFL BRDR(5 SEC)
EA 1.000 $275.000 $180.000 $260.000 $261.000
BACKPLATE W/REFL BRDR(3 SEC)
EA 130.000 $235.000 $120.000 $170.000 $190.000
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 15,978.000 $2.000 $1.350 $2.200 $1.920
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 28,581.000 $2.600 $2.100 $3.050 $3.050
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 7,237.000 $3.200 $2.950 $4.000 $3.720
INS TRF SIG PL AM (S)1 ARM(20')
EA 1.000 $8,000.000 $11,400.000 $8,500.000 $8,344.000
INS TRF SIG PL AM (S)1 ARM(24')
EA 2.000 $8,000.000 $11,750.000 $13,200.000 $8,782.000
INS TRF SIG PL AM (S)1 ARM(28')
EA 6.000 $12,300.000 $12,250.000 $13,200.000 $9,334.000
INS TRF SIG PL AM(S)1 ARM(28')LUM
EA 1.000 $15,100.000 $14,500.000 $15,800.000 $11,808.000
INS TRF SIG PL AM(S)1 ARM(32')
EA 1.000 $9,000.000 $12,850.000 $14,500.000 $10,203.000
INS TRF SIG PL AM(S)1 ARM(36')
EA 3.000 $12,900.000 $11,785.000 $17,100.000 $10,868.000
INS TRF SIG PL AM(S)1 ARM(40')
EA 1.000 $15,500.000 $13,500.000 $19,000.000 $12,284.000
INS TRF SIG PL AM(S)1 ARM(44')
EA 1.000 $15,900.000 $15,500.000 $19,500.000 $12,518.000
PED POLE ASSEMBLY
EA 67.000 $2,400.000 $1,250.000 $3,100.000 $3,329.000
PED DETECT PUSH BUTTON (APS)
EA 110.000 $1,100.000 $850.000 $890.000 $785.000
PED DETECTOR CONTROLLER UNIT
EA 16.000 $3,700.000 $3,500.000 $3,600.000 $3,719.000
REMOVAL OF CONDUIT
LF 9,405.000 $5.000 $3.000 $1.500 $5.000
REMOVAL OF GROUND BOXES
EA 146.000 $200.000 $225.000 $72.000 $225.000
REMOVAL OF PEDESTRIAN RAMPS
EA 13.000 $30.000 $950.000 $580.000 $556.000
REMOVAL OF SIDEWALKS
SF 226.000 $30.000 $95.000 $50.000 $55.550
RVDS (PRESENCE DETECTION ONLY)
EA 40.000 $10,000.000 $8,500.000 $8,500.000 $5,072.000
RVDS (ADVANCE DETENTION ONLY)
EA 34.000 $10,000.000 $10,650.000 $1,100.000 $3,320.000
RVDS (PRESENCE AND ADVANCE DETECTION)
EA 28.000 $10,000.000 $9,500.000 $8,900.000 $7,090.000
Totals: $4,592,266.810 $3,504,673.350 $3,633,473.110 $4,278,678.865
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $200,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
Total: $205,000.00