PREPARING ROW
|
STA
|
123.000
|
$4,400.000
|
$1,500.000
|
$2,500.000
|
$1,000.000
|
$3,000.000
|
$9,500.000
|
$1,800.000
|
$8,500.000
|
$1,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
8,000.000
|
$7.700
|
$10.000
|
$10.000
|
$7.000
|
$10.000
|
$8.000
|
$8.000
|
$7.500
|
$30.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
1,375.000
|
$17.730
|
$8.000
|
$10.000
|
$10.000
|
$10.750
|
$11.000
|
$6.000
|
$12.000
|
$15.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
3,494.000
|
$17.250
|
$6.000
|
$15.000
|
$8.000
|
$9.750
|
$11.000
|
$8.000
|
$15.000
|
$15.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(10")
|
CY
|
2,500.000
|
$15.360
|
$16.000
|
$10.000
|
$10.000
|
$9.000
|
$15.000
|
$28.000
|
$10.000
|
$25.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
51,589.000
|
$7.500
|
$8.000
|
$3.000
|
$4.000
|
$7.600
|
$5.500
|
$8.000
|
$8.500
|
$20.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
12,684.000
|
$20.000
|
$4.000
|
$3.000
|
$8.000
|
$8.300
|
$6.000
|
$7.000
|
$4.500
|
$30.000
|
|
|
BACKFILL (TY A)
|
STA
|
20.000
|
$122.370
|
$300.000
|
$250.000
|
$600.000
|
$239.000
|
$550.000
|
$8,500.000
|
$250.000
|
$250.000
|
|
|
FURNISHING AND PLACING TOPSOIL
|
CY
|
100.000
|
$40.500
|
$30.000
|
$10.000
|
$50.000
|
$34.500
|
$53.000
|
$20.000
|
$30.000
|
$100.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
36,796.000
|
$0.650
|
$0.500
|
$0.370
|
$0.400
|
$0.500
|
$0.390
|
$0.480
|
$0.500
|
$0.500
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
36,796.000
|
$0.450
|
$0.500
|
$0.300
|
$0.330
|
$0.400
|
$0.320
|
$0.440
|
$0.450
|
$0.500
|
|
|
VEGETATIVE WATERING
|
MG
|
634.000
|
$21.500
|
$35.000
|
$30.000
|
$10.000
|
$38.000
|
$33.000
|
$57.000
|
$35.000
|
$50.000
|
|
|
SPRINKLING (DUST CONTROL)
|
MG
|
493.000
|
$13.290
|
$50.000
|
$1.000
|
$1.000
|
$32.000
|
$30.000
|
$57.000
|
$1.000
|
$60.000
|
|
|
PROOF ROLLING
|
HR
|
225.000
|
$117.740
|
$45.000
|
$65.000
|
$50.000
|
$59.500
|
$125.000
|
$100.000
|
$80.000
|
$100.000
|
|
|
FL BS (RDWY DEL)(TY E GR 4)(FNAL POS)
|
CY
|
19,050.000
|
$35.980
|
$42.000
|
$50.000
|
$40.000
|
$39.750
|
$40.000
|
$39.000
|
$25.000
|
$75.000
|
|
|
REWRKING BS MTRL(TY B)(5")(DC)(ORG POS)
|
CY
|
19,050.000
|
$22.000
|
$4.000
|
$10.000
|
$9.000
|
$9.200
|
$6.000
|
$12.000
|
$5.500
|
$45.000
|
|
|
CEMENT
|
TON
|
3,365.000
|
$226.450
|
$180.000
|
$200.000
|
$195.000
|
$229.000
|
$240.000
|
$172.930
|
$210.000
|
$250.000
|
|
|
CEM TRT (MX EXT MTL/NW BASE)(DC)(10")
|
SY
|
137,158.000
|
$3.000
|
$2.000
|
$1.500
|
$2.500
|
$1.700
|
$1.400
|
$2.000
|
$3.250
|
$3.000
|
|
|
CEMENT TREAT (SUBGRADE)(12")
|
SY
|
139,987.000
|
$2.000
|
$2.000
|
$1.540
|
$3.750
|
$2.200
|
$1.950
|
$2.000
|
$2.500
|
$3.000
|
|
|
SALV,HAUL & STKPL RECL ASPH PAV (4.5")
|
SY
|
55,057.000
|
$3.000
|
$3.000
|
$1.000
|
$2.000
|
$3.850
|
$3.000
|
$3.790
|
$3.500
|
$2.500
|
|
|
PRIME COAT (MC-30)
|
GAL
|
27,997.000
|
$5.920
|
$4.000
|
$4.000
|
$5.000
|
$4.450
|
$5.500
|
$8.000
|
$4.750
|
$5.000
|
|
|
CEM STABIL BKFL
|
CY
|
3,422.000
|
$78.640
|
$71.000
|
$50.000
|
$85.000
|
$97.000
|
$50.000
|
$55.000
|
$95.000
|
$175.000
|
|
|
CUT & RESTORING PAV
|
SY
|
633.000
|
$90.000
|
$85.000
|
$60.000
|
$75.000
|
$68.000
|
$70.000
|
$48.000
|
$125.000
|
$125.000
|
|
|
STRUCT EXCAV (SPECIAL)
|
CY
|
4,802.000
|
$77.960
|
$99.000
|
$75.000
|
$85.000
|
$67.000
|
$55.000
|
$65.260
|
$60.000
|
$80.000
|
|
|
SAND BACKFILL
|
CY
|
14,118.000
|
$45.000
|
$37.000
|
$20.010
|
$35.000
|
$35.250
|
$20.000
|
$35.000
|
$38.000
|
$30.000
|
|
|
ROCK BACKFILL
|
CY
|
336.000
|
$84.000
|
$66.000
|
$90.000
|
$95.000
|
$67.000
|
$45.000
|
$85.000
|
$61.000
|
$80.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
16,998.000
|
$2.910
|
$3.000
|
$0.100
|
$1.000
|
$3.150
|
$7.000
|
$2.000
|
$0.100
|
$40.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (24 IN)
|
LF
|
48.000
|
$203.040
|
$190.000
|
$193.340
|
$393.720
|
$439.000
|
$195.000
|
$380.000
|
$200.000
|
$400.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
105.600
|
$311.740
|
$330.000
|
$325.620
|
$464.550
|
$519.000
|
$325.000
|
$450.000
|
$325.000
|
$500.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
3.000
|
$1,600.000
|
$5,340.000
|
$2,000.000
|
$3,500.000
|
$735.000
|
$2,400.000
|
$5,500.000
|
$5,500.000
|
$5,000.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
130.400
|
$581.220
|
$620.000
|
$575.000
|
$500.000
|
$418.000
|
$450.000
|
$500.000
|
$450.000
|
$600.000
|
|
|
CONC BOX CULV (10 FT X 5 FT)
|
LF
|
194.500
|
$1,339.160
|
$1,490.000
|
$1,000.000
|
$1,200.000
|
$884.000
|
$1,250.000
|
$1,207.690
|
$2,700.000
|
$1,200.000
|
|
|
CONC BOX CULV (10 FT X 7 FT)
|
LF
|
46.000
|
$1,430.400
|
$1,740.000
|
$1,400.000
|
$1,500.000
|
$1,050.000
|
$1,500.000
|
$1,952.890
|
$2,800.000
|
$1,500.000
|
|
|
CONC BOX CULV (10 FT X 4 FT)
|
LF
|
288.000
|
$925.000
|
$1,460.000
|
$1,000.000
|
$1,100.000
|
$864.000
|
$950.000
|
$1,096.670
|
$2,400.000
|
$1,000.000
|
|
|
RC PIPE (CL III)(18 IN)(SPL)
|
LF
|
2,944.000
|
$70.120
|
$60.000
|
$80.000
|
$52.390
|
$62.000
|
$71.000
|
$79.980
|
$130.000
|
$120.000
|
|
|
RC PIPE (CL III)(24 IN)(SPL)
|
LF
|
225.000
|
$94.190
|
$70.000
|
$80.000
|
$67.810
|
$73.000
|
$70.000
|
$92.580
|
$85.000
|
$155.000
|
|
|
RC PIPE (CL III)(30 IN)(SPL)
|
LF
|
322.000
|
$120.000
|
$94.000
|
$125.000
|
$94.010
|
$100.000
|
$100.000
|
$127.760
|
$110.000
|
$185.000
|
|
|
RC PIPE (CL III)(36 IN)(SPL)
|
LF
|
635.000
|
$156.000
|
$123.000
|
$135.000
|
$127.760
|
$141.000
|
$125.000
|
$168.070
|
$140.000
|
$275.000
|
|
|
RC PIPE (CL III)(42 IN)(SPL)
|
LF
|
976.000
|
$180.000
|
$180.000
|
$175.000
|
$169.220
|
$183.500
|
$170.000
|
$248.230
|
$220.000
|
$300.000
|
|
|
RC PIPE (CL III)(48 IN)(SPL)
|
LF
|
3,699.000
|
$200.000
|
$185.000
|
$225.000
|
$204.930
|
$191.000
|
$185.000
|
$360.910
|
$215.000
|
$325.000
|
|
|
RC PIPE (CL III)(54 IN)(SPL)
|
LF
|
5,111.000
|
$215.000
|
$225.000
|
$250.000
|
$243.690
|
$240.000
|
$230.000
|
$393.730
|
$260.000
|
$350.000
|
|
|
RC PIPE (CL III)(60 IN)(SPL)
|
LF
|
1,184.000
|
$230.000
|
$290.000
|
$325.000
|
$307.250
|
$277.250
|
$290.000
|
$541.260
|
$305.000
|
$450.000
|
|
|
RC PIPE (CL IV) (60 IN) (SPL)
|
LF
|
432.000
|
$230.000
|
$288.000
|
$325.000
|
$310.170
|
$293.000
|
$320.000
|
$462.240
|
$395.000
|
$1,000.000
|
|
|
INLET (COMPL)(PCO)(3FT)(NONE)
|
EA
|
2.000
|
$4,965.850
|
$4,740.000
|
$5,500.000
|
$4,800.000
|
$4,390.000
|
$4,500.000
|
$5,550.000
|
$5,500.000
|
$13,000.000
|
|
|
INLET (COMPL)(PCO)(3FT)(LEFT)
|
EA
|
10.000
|
$5,500.000
|
$5,790.000
|
$6,000.000
|
$5,700.000
|
$5,830.000
|
$5,450.000
|
$6,400.000
|
$7,000.000
|
$14,000.000
|
|
|
INLET (COMPL)(PCO)(3FT)(RIGHT)
|
EA
|
14.000
|
$5,200.000
|
$5,540.000
|
$6,000.000
|
$5,500.000
|
$5,590.000
|
$5,200.000
|
$6,200.000
|
$7,000.000
|
$13,000.000
|
|
|
INLET (COMPL)(PCO)(3FT)(BOTH)
|
EA
|
9.000
|
$6,000.000
|
$6,270.000
|
$6,500.000
|
$6,100.000
|
$6,070.000
|
$5,870.000
|
$3,194.440
|
$7,500.000
|
$13,000.000
|
|
|
INLET (COMPL)(PCO)(4FT)(LEFT)
|
EA
|
1.000
|
$5,800.000
|
$5,600.000
|
$6,250.000
|
$5,500.000
|
$5,470.000
|
$5,300.000
|
$6,250.000
|
$6,500.000
|
$13,000.000
|
|
|
INLET (COMPL)(PCO)(4FT)(RIGHT)
|
EA
|
1.000
|
$10,604.410
|
$6,160.000
|
$6,250.000
|
$6,000.000
|
$6,010.000
|
$5,850.000
|
$6,700.000
|
$6,500.000
|
$10,000.000
|
|
|
INLET (COMPL)(PCO)(4FT)(BOTH)
|
EA
|
1.000
|
$8,863.420
|
$6,830.000
|
$7,500.000
|
$6,600.000
|
$6,670.000
|
$6,500.000
|
$7,250.000
|
$7,200.000
|
$11,000.000
|
|
|
INLET (COMPL)(PCO)(5FT)(LEFT)
|
EA
|
1.000
|
$12,838.350
|
$7,870.000
|
$9,000.000
|
$8,600.000
|
$7,630.000
|
$7,500.000
|
$20,260.000
|
$11,000.000
|
$15,000.000
|
|
|
INLET (COMPL)(PCO)(5FT)(RIGHT)
|
EA
|
1.000
|
$10,744.420
|
$7,740.000
|
$9,000.000
|
$8,600.000
|
$7,500.000
|
$7,350.000
|
$20,150.000
|
$11,000.000
|
$15,000.000
|
|
|
INLET (COMPL)(PCO)(5FT)(BOTH)
|
EA
|
1.000
|
$12,269.390
|
$8,780.000
|
$10,000.000
|
$9,500.000
|
$8,520.000
|
$8,400.000
|
$21,000.000
|
$12,000.000
|
$16,000.000
|
|
|
INLET (COMPL)(PCO)(6FT)(NONE)
|
EA
|
5.000
|
$6,500.000
|
$10,740.000
|
$12,000.000
|
$10,000.000
|
$8,950.000
|
$8,800.000
|
$21,360.000
|
$17,800.000
|
$20,000.000
|
|
|
INLET (COMPL)(PCO)(6FT)(LEFT)
|
EA
|
10.000
|
$12,542.000
|
$10,660.000
|
$12,200.000
|
$10,000.000
|
$9,240.000
|
$9,750.000
|
$21,300.000
|
$19,000.000
|
$20,000.000
|
|
|
INLET (COMPL)(PCO)(6FT)(RIGHT)
|
EA
|
7.000
|
$7,267.950
|
$10,980.000
|
$12,200.000
|
$10,000.000
|
$9,550.000
|
$9,100.000
|
$21,560.000
|
$19,000.000
|
$25,000.000
|
|
|
INLET (COMPL)(PCO)(6FT)(BOTH)
|
EA
|
7.000
|
$8,223.890
|
$11,580.000
|
$13,000.000
|
$10,600.000
|
$10,100.000
|
$9,650.000
|
$22,050.000
|
$21,000.000
|
$25,000.000
|
|
|
INLET (COMPL)(PCU)(3FT)(LEFT)
|
EA
|
1.000
|
$5,670.000
|
$5,600.000
|
$6,000.000
|
$5,500.000
|
$5,390.000
|
$5,300.000
|
$6,250.000
|
$7,000.000
|
$15,000.000
|
|
|
INLET (COMPL)(PCU)(3FT)(BOTH)
|
EA
|
1.000
|
$8,200.000
|
$6,530.000
|
$7,000.000
|
$6,200.000
|
$6,300.000
|
$6,200.000
|
$7,000.000
|
$7,500.000
|
$15,000.000
|
|
|
INLET (COMPL)(PCU)(6FT)(RIGHT)
|
EA
|
1.000
|
$9,500.000
|
$12,630.000
|
$14,000.000
|
$11,000.000
|
$11,300.000
|
$11,000.000
|
$10,700.000
|
$28,000.000
|
$30,000.000
|
|
|
INLET (COMPL)(PCU)(6FT)(BOTH)
|
EA
|
1.000
|
$9,841.000
|
$13,610.000
|
$14,500.000
|
$12,000.000
|
$12,300.000
|
$12,000.000
|
$11,500.000
|
$29,000.000
|
$40,000.000
|
|
|
INLET (COMPL)(PAZD)(RC)(3FTX3FT)
|
EA
|
13.000
|
$7,222.000
|
$4,470.000
|
$5,000.000
|
$4,500.000
|
$3,870.000
|
$4,130.000
|
$5,325.000
|
$5,000.000
|
$12,000.000
|
|
|
MANHOLE (COMPL)(SPECIAL)
|
EA
|
1.000
|
$27,597.180
|
$19,360.000
|
$19,000.000
|
$15,000.000
|
$17,500.000
|
$18,000.000
|
$29,950.000
|
$33,000.000
|
$25,000.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 18 IN)
|
EA
|
1.000
|
$8,500.000
|
$15,270.000
|
$15,000.000
|
$7,000.000
|
$8,200.000
|
$5,000.000
|
$18,000.000
|
$7,000.000
|
$10,000.000
|
|
|
WINGWALL (PW - 1) (HW=10 FT)
|
EA
|
4.000
|
$33,312.710
|
$21,090.000
|
$35,000.000
|
$38,000.000
|
$29,800.000
|
$25,000.000
|
$38,000.000
|
$36,000.000
|
$40,000.000
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
1.000
|
$27,500.000
|
$17,300.000
|
$35,000.000
|
$33,000.000
|
$26,000.000
|
$20,000.000
|
$38,000.000
|
$47,000.000
|
$50,000.000
|
|
|
REMOV STR (INLET)
|
EA
|
2.000
|
$1,506.670
|
$720.000
|
$500.000
|
$700.000
|
$692.000
|
$435.000
|
$300.000
|
$800.000
|
$5,000.000
|
|
|
REMOV STR (SET)
|
EA
|
60.000
|
$620.920
|
$280.000
|
$250.000
|
$230.000
|
$397.000
|
$320.000
|
$200.000
|
$700.000
|
$3,000.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
5.000
|
$2,799.610
|
$1,970.000
|
$2,000.000
|
$600.000
|
$2,160.000
|
$3,500.000
|
$2,000.000
|
$4,000.000
|
$3,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,964.000
|
$12.910
|
$6.000
|
$10.000
|
$10.000
|
$15.000
|
$18.000
|
$8.000
|
$30.000
|
$80.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
167.000
|
$57.070
|
$60.000
|
$75.000
|
$30.000
|
$48.750
|
$250.000
|
$48.000
|
$500.000
|
$300.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,950,000.000
|
$866,000.000
|
$2,000,000.000
|
$1,700,000.000
|
$1,725,000.000
|
$1,883,465.550
|
$500,000.000
|
$1,800,000.000
|
$3,250,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
26.000
|
$6,316.940
|
$5,000.000
|
$4,000.000
|
$6,000.000
|
$2,340.000
|
$14,000.000
|
$3,800.000
|
$6,350.000
|
$25,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
720.000
|
$25.610
|
$20.000
|
$25.000
|
$15.000
|
$10.250
|
$35.000
|
$15.000
|
$25.000
|
$25.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
720.000
|
$7.730
|
$7.000
|
$5.000
|
$5.000
|
$8.550
|
$15.000
|
$2.000
|
$15.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
100.000
|
$3.770
|
$8.000
|
$10.000
|
$15.000
|
$5.650
|
$11.000
|
$19.500
|
$7.500
|
$8.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
100.000
|
$1.150
|
$2.000
|
$3.850
|
$5.000
|
$2.050
|
$4.250
|
$3.000
|
$2.000
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,095.000
|
$3.810
|
$5.000
|
$6.250
|
$12.000
|
$5.600
|
$6.750
|
$10.800
|
$5.500
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,095.000
|
$1.100
|
$1.500
|
$1.300
|
$1.500
|
$0.800
|
$1.350
|
$1.000
|
$1.500
|
$1.250
|
|
|
CONSTRUCTING DETOURS
|
SY
|
13,794.000
|
$42.040
|
$40.000
|
$40.000
|
$54.100
|
$42.000
|
$47.000
|
$37.000
|
$42.000
|
$60.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
1,740.000
|
$50.000
|
$40.000
|
$20.000
|
$40.000
|
$9.100
|
$50.000
|
$42.000
|
$28.000
|
$40.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
280.000
|
$50.000
|
$43.000
|
$20.000
|
$40.000
|
$9.100
|
$50.000
|
$42.000
|
$28.000
|
$50.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
1,900.000
|
$5.380
|
$10.000
|
$5.000
|
$6.000
|
$7.300
|
$7.500
|
$57.000
|
$7.500
|
$10.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
440.000
|
$9.000
|
$11.000
|
$5.000
|
$6.000
|
$7.300
|
$8.000
|
$5.000
|
$7.500
|
$30.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
1,740.000
|
$7.000
|
$7.000
|
$10.000
|
$8.000
|
$4.700
|
$6.000
|
$6.000
|
$9.000
|
$10.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
280.000
|
$7.000
|
$20.000
|
$10.000
|
$8.000
|
$4.700
|
$7.000
|
$6.000
|
$9.000
|
$30.000
|
|
|
CONC CURB & GUTTER (TY B) (MOUNTABLE)
|
LF
|
22,976.000
|
$15.630
|
$17.000
|
$17.000
|
$16.480
|
$15.000
|
$16.000
|
$18.000
|
$12.000
|
$45.000
|
|
|
CONC CURB & GUTTER(VALLEY GUTTER)(48")
|
LF
|
269.000
|
$58.950
|
$56.000
|
$60.000
|
$51.500
|
$37.750
|
$50.000
|
$22.000
|
$55.000
|
$140.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
2,045.000
|
$78.970
|
$100.000
|
$90.000
|
$54.850
|
$69.500
|
$55.000
|
$80.000
|
$55.000
|
$80.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,259.000
|
$39.440
|
$38.000
|
$50.000
|
$45.000
|
$36.750
|
$22.000
|
$45.000
|
$50.000
|
$100.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
14,063.000
|
$47.250
|
$51.000
|
$40.000
|
$51.000
|
$41.250
|
$50.000
|
$48.000
|
$51.000
|
$50.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
27.000
|
$1,800.000
|
$2,200.000
|
$1,800.000
|
$2,000.000
|
$1,960.000
|
$1,800.000
|
$1,800.000
|
$2,600.000
|
$4,000.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
8.000
|
$1,634.910
|
$2,100.000
|
$2,000.000
|
$2,000.000
|
$1,830.000
|
$2,300.000
|
$1,800.000
|
$2,600.000
|
$4,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
884.000
|
$3.560
|
$8.000
|
$5.340
|
$7.000
|
$7.000
|
$6.500
|
$1.000
|
$10.000
|
$10.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
11.000
|
$275.000
|
$250.000
|
$521.650
|
$250.000
|
$425.000
|
$285.000
|
$1.000
|
$850.000
|
$800.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
3.000
|
$201.930
|
$250.000
|
$956.360
|
$180.000
|
$425.000
|
$500.000
|
$1.000
|
$850.000
|
$800.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 4
|
EA
|
48.000
|
$412.970
|
$490.000
|
$300.000
|
$309.000
|
$492.000
|
$300.000
|
$350.000
|
$300.000
|
$325.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 4
|
EA
|
3.000
|
$537.650
|
$750.000
|
$575.000
|
$592.250
|
$664.000
|
$575.000
|
$350.000
|
$575.000
|
$600.000
|
|
|
CONDT (PVC) (SCH 40) (1")
|
LF
|
280.000
|
$19.920
|
$10.000
|
$10.230
|
$19.570
|
$22.000
|
$10.250
|
$19.380
|
$11.000
|
$20.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
3,160.000
|
$12.640
|
$12.000
|
$12.210
|
$17.510
|
$19.500
|
$12.200
|
$17.340
|
$12.000
|
$18.000
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
90.000
|
$28.790
|
$18.000
|
$18.320
|
$48.410
|
$54.500
|
$18.300
|
$47.940
|
$18.000
|
$50.000
|
|
|
CONDT (PVC) (SCH 80) (4") (BORE)
|
LF
|
755.000
|
$36.580
|
$46.000
|
$45.790
|
$55.620
|
$62.500
|
$45.800
|
$55.080
|
$45.000
|
$55.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
1,235.000
|
$1.550
|
$1.500
|
$1.420
|
$1.960
|
$2.200
|
$1.420
|
$1.940
|
$1.500
|
$2.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
145.000
|
$1.810
|
$2.000
|
$1.780
|
$2.210
|
$2.500
|
$1.780
|
$2.190
|
$1.800
|
$2.250
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
230.000
|
$2.570
|
$2.000
|
$1.980
|
$2.420
|
$2.700
|
$1.980
|
$2.400
|
$2.000
|
$2.500
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
1,520.000
|
$2.500
|
$3.000
|
$3.150
|
$2.830
|
$3.150
|
$3.150
|
$2.810
|
$3.150
|
$3.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
26.000
|
$1,100.000
|
$980.000
|
$981.950
|
$1,545.000
|
$1,730.000
|
$982.000
|
$1,530.000
|
$975.000
|
$1,500.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
2.000
|
$1,461.770
|
$1,420.000
|
$1,424.590
|
$2,060.000
|
$2,310.000
|
$1,425.000
|
$2,040.000
|
$1,400.000
|
$2,000.000
|
|
|
REMOVE GROUND BOX
|
EA
|
17.000
|
$293.160
|
$460.000
|
$457.900
|
$113.300
|
$127.000
|
$460.000
|
$112.200
|
$450.000
|
$110.000
|
|
|
ZINC-COAT STL WIRE STRAND (3/8")
|
LF
|
2,000.000
|
$2.760
|
$3.500
|
$3.710
|
$5.150
|
$5.750
|
$3.710
|
$5.100
|
$3.750
|
$5.250
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
3.000
|
$665.790
|
$410.000
|
$407.030
|
$442.900
|
$496.000
|
$407.000
|
$438.600
|
$400.000
|
$450.000
|
|
|
ELC SRV TY T 120/240 000(NS)GS(L)TS(O)
|
EA
|
4.000
|
$2,524.450
|
$4,580.000
|
$4,579.040
|
$5,150.000
|
$5,770.000
|
$4,580.000
|
$5,100.000
|
$4,700.000
|
$5,500.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
100.000
|
$30.600
|
$16.000
|
$43.000
|
$30.900
|
$49.750
|
$43.750
|
$53.000
|
$40.000
|
$50.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
23.000
|
$778.200
|
$810.000
|
$900.000
|
$927.000
|
$1,040.000
|
$900.000
|
$800.000
|
$900.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
6.000
|
$830.250
|
$930.000
|
$1,250.000
|
$1,287.500
|
$1,440.000
|
$1,250.000
|
$800.000
|
$1,250.000
|
$1,400.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
27.000
|
$639.080
|
$990.000
|
$675.000
|
$753.850
|
$267.000
|
$675.000
|
$1,200.000
|
$700.000
|
$700.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
10.000
|
$90.000
|
$270.000
|
$125.000
|
$188.790
|
$86.500
|
$125.000
|
$500.000
|
$150.000
|
$150.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
30,125.000
|
$0.540
|
$0.500
|
$0.520
|
$0.540
|
$0.650
|
$0.520
|
$0.690
|
$0.550
|
$0.600
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
358.000
|
$9.250
|
$8.000
|
$8.000
|
$8.240
|
$9.250
|
$8.000
|
$6.930
|
$8.000
|
$9.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
467.000
|
$0.570
|
$0.500
|
$0.520
|
$0.540
|
$0.650
|
$0.520
|
$0.860
|
$0.550
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
39,186.000
|
$0.540
|
$0.500
|
$0.520
|
$0.540
|
$0.650
|
$0.520
|
$0.690
|
$0.550
|
$0.550
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
1,512.000
|
$3.000
|
$5.000
|
$5.000
|
$5.150
|
$5.750
|
$5.000
|
$4.490
|
$5.000
|
$5.250
|
|
|
WK ZN PAV MRK REMOV (W)6"(DOT)
|
LF
|
684.000
|
$1.750
|
$1.000
|
$1.100
|
$1.130
|
$1.250
|
$1.100
|
$0.970
|
$1.100
|
$1.250
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
32,682.000
|
$0.760
|
$0.500
|
$0.320
|
$0.330
|
$0.400
|
$0.320
|
$0.970
|
$0.350
|
$0.350
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
2,689.000
|
$1.410
|
$0.500
|
$0.480
|
$0.490
|
$0.600
|
$0.480
|
$3.880
|
$0.500
|
$0.500
|
|
|
WK ZN PAV MRK REMOV (Y)6"(DOT)
|
LF
|
107.000
|
$0.900
|
$1.000
|
$1.100
|
$1.130
|
$1.250
|
$1.100
|
$3.880
|
$1.250
|
$1.250
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
31,819.000
|
$0.850
|
$0.500
|
$0.320
|
$0.330
|
$0.350
|
$0.320
|
$0.870
|
$0.350
|
$0.350
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
2,500.000
|
$1.280
|
$2.000
|
$1.000
|
$1.200
|
$1.850
|
$2.500
|
$3.000
|
$1.000
|
$0.800
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
3,000.000
|
$1.730
|
$2.000
|
$1.000
|
$1.200
|
$1.300
|
$2.500
|
$3.000
|
$1.000
|
$0.750
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
4,632.000
|
$1.180
|
$1.000
|
$0.880
|
$0.910
|
$1.000
|
$0.880
|
$9.180
|
$1.000
|
$1.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
2,873.000
|
$8.770
|
$12.000
|
$12.000
|
$12.360
|
$13.750
|
$12.000
|
$7.960
|
$12.000
|
$13.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
49.000
|
$161.480
|
$150.000
|
$150.000
|
$154.500
|
$173.000
|
$150.000
|
$142.800
|
$150.000
|
$160.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
34.000
|
$200.230
|
$200.000
|
$200.000
|
$206.000
|
$231.000
|
$200.000
|
$142.800
|
$200.000
|
$225.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
5,150.000
|
$0.750
|
$1.000
|
$0.880
|
$0.910
|
$1.000
|
$0.880
|
$0.800
|
$0.900
|
$1.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
33,476.000
|
$0.730
|
$0.500
|
$0.720
|
$0.740
|
$0.800
|
$0.720
|
$0.730
|
$0.750
|
$0.800
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
5,050.000
|
$0.750
|
$1.000
|
$0.880
|
$0.910
|
$1.000
|
$0.880
|
$0.800
|
$0.900
|
$0.900
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
33,131.000
|
$0.670
|
$0.500
|
$0.720
|
$0.740
|
$0.800
|
$0.720
|
$0.730
|
$0.750
|
$0.750
|
|
REFL PAV MRKR TY I-C
|
EA
|
527.000
|
$4.690
|
$5.000
|
$5.000
|
$5.150
|
$5.750
|
$5.000
|
$4.280
|
$5.000
|
$5.250
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,070.000
|
$3.850
|
$5.000
|
$5.000
|
$5.150
|
$5.750
|
$5.000
|
$4.280
|
$5.000
|
$5.250
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
53,157.000
|
$0.400
|
$0.500
|
$0.350
|
$0.360
|
$0.450
|
$0.350
|
$0.820
|
$0.400
|
$0.500
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
116.000
|
$0.900
|
$0.500
|
$0.600
|
$0.620
|
$0.650
|
$0.600
|
$1.430
|
$0.600
|
$0.750
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
443.000
|
$1.280
|
$1.000
|
$0.850
|
$0.880
|
$1.000
|
$0.850
|
$2.040
|
$0.900
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
67.000
|
$3.330
|
$5.000
|
$5.000
|
$5.150
|
$5.750
|
$5.000
|
$8.160
|
$5.000
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
3.000
|
$64.360
|
$100.000
|
$100.000
|
$103.000
|
$115.000
|
$100.000
|
$102.000
|
$100.000
|
$125.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
2.000
|
$64.360
|
$100.000
|
$100.000
|
$103.000
|
$115.000
|
$100.000
|
$612.000
|
$100.000
|
$125.000
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
2.000
|
$18,500.000
|
$45,280.000
|
$45,281.580
|
$42,230.000
|
$47,300.000
|
$45,300.000
|
$41,820.000
|
$44,500.000
|
$45,000.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
2.000
|
$2,900.000
|
$5,090.000
|
$5,087.820
|
$5,459.000
|
$6,120.000
|
$5,090.000
|
$5,406.000
|
$5,000.000
|
$6,000.000
|
|
|
TEMP TRAF SIGNALS
|
EA
|
3.000
|
$40,000.000
|
$18,320.000
|
$18,316.150
|
$23,999.000
|
$14,200.000
|
$18,300.000
|
$12,546.000
|
$18,000.000
|
$13,000.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
16.000
|
$275.550
|
$250.000
|
$254.390
|
$350.200
|
$392.000
|
$254.000
|
$346.000
|
$250.000
|
$350.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
8.000
|
$280.150
|
$250.000
|
$254.390
|
$350.200
|
$392.000
|
$254.000
|
$346.000
|
$250.000
|
$350.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
20.000
|
$281.330
|
$250.000
|
$254.390
|
$350.200
|
$392.000
|
$255.000
|
$346.800
|
$250.000
|
$350.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
16.000
|
$284.630
|
$250.000
|
$254.390
|
$350.200
|
$392.000
|
$254.000
|
$344.250
|
$250.000
|
$350.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
16.000
|
$280.740
|
$250.000
|
$254.390
|
$350.200
|
$392.000
|
$254.000
|
$344.250
|
$250.000
|
$350.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
8.000
|
$283.820
|
$250.000
|
$254.390
|
$350.200
|
$392.000
|
$254.360
|
$346.800
|
$250.000
|
$350.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
16.000
|
$597.000
|
$550.000
|
$549.480
|
$916.700
|
$1,030.000
|
$550.000
|
$907.800
|
$550.000
|
$900.000
|
|
|
BACKPLATE W/REFL BRDR(3 SEC)ALUM
|
EA
|
16.000
|
$174.710
|
$160.000
|
$157.720
|
$185.400
|
$208.000
|
$157.700
|
$183.600
|
$160.000
|
$200.000
|
|
|
BACKPLATE W/REFL BRDR(4 SEC)ALUM
|
EA
|
8.000
|
$174.710
|
$210.000
|
$210.640
|
$247.200
|
$277.000
|
$211.000
|
$244.800
|
$210.000
|
$250.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
|
LF
|
2,825.000
|
$2.010
|
$1.500
|
$1.530
|
$1.910
|
$2.150
|
$1.530
|
$1.890
|
$2.000
|
$2.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
|
LF
|
4,880.000
|
$2.540
|
$3.000
|
$2.800
|
$2.880
|
$3.250
|
$2.800
|
$2.860
|
$3.000
|
$3.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
1,690.000
|
$2.800
|
$3.500
|
$3.460
|
$3.760
|
$4.200
|
$3.460
|
$3.720
|
$4.000
|
$4.000
|
|
|
TRF SIG CBL (TY C)(14 AWG)(2 CONDR)
|
LF
|
11,025.000
|
$1.860
|
$1.500
|
$1.480
|
$1.700
|
$1.850
|
$1.480
|
$1.680
|
$2.000
|
$1.750
|
|
|
INSTALL RDSD FLASH BEACON ASSEMBLY
|
EA
|
2.000
|
$5,306.140
|
$5,600.000
|
$5,596.600
|
$7,004.000
|
$7,850.000
|
$5,600.000
|
$6,936.000
|
$5,500.000
|
$7,000.000
|
|
|
REMOVE RDSD FLASH BEACON ASSEMBLY
|
EA
|
1.000
|
$500.000
|
$520.000
|
$524.050
|
$442.900
|
$496.000
|
$524.000
|
$438.000
|
$515.000
|
$450.000
|
|
|
INS TRF SIG PL AM (S)STR(TY B)
|
EA
|
2.000
|
$6,280.930
|
$7,940.000
|
$7,937.000
|
$7,622.000
|
$8,540.000
|
$7,936.000
|
$7,548.000
|
$7,800.000
|
$8,500.000
|
|
|
INS TRF SIG PL AM (S)STR(TY B)LUM
|
EA
|
6.000
|
$7,357.850
|
$9,460.000
|
$9,463.340
|
$8,549.000
|
$9,580.000
|
$9,500.000
|
$8,466.000
|
$9,300.000
|
$9,500.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
8.000
|
$2,069.930
|
$930.000
|
$925.980
|
$1,236.000
|
$1,390.000
|
$926.000
|
$1,224.000
|
$910.000
|
$1,300.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
16.000
|
$846.420
|
$860.000
|
$864.930
|
$957.900
|
$1,070.000
|
$865.000
|
$948.600
|
$850.000
|
$1,000.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
2.000
|
$3,200.000
|
$3,550.000
|
$3,546.210
|
$3,399.000
|
$3,810.000
|
$3,545.000
|
$3,366.000
|
$3,500.000
|
$3,500.000
|
|
|
VEH LP DETECT (SAWCUT)
|
LF
|
3,167.000
|
$12.430
|
$12.000
|
$12.210
|
$13.390
|
$15.000
|
$12.250
|
$13.260
|
$12.000
|
$15.000
|
|
|
REMOVAL OF CONTROL CABINET(GRND MNT)
|
EA
|
2.000
|
$451.430
|
$3,050.000
|
$3,052.690
|
$309.000
|
$346.000
|
$3,052.000
|
$306.000
|
$3,000.000
|
$325.000
|
|
|
TREE REMOVAL (12" - 18" DIA)
|
EA
|
197.000
|
$431.190
|
$700.000
|
$100.000
|
$100.000
|
$308.000
|
$250.000
|
$300.000
|
$250.000
|
$1,500.000
|
|
|
IRRIGATION GATE (18")
|
EA
|
1.000
|
$19,748.000
|
$8,720.000
|
$9,500.000
|
$8,000.000
|
$35,200.000
|
$12,000.000
|
$12,000.000
|
$14,000.000
|
$8,000.000
|
|
|
IRRIGATION GATE (24")
|
EA
|
2.000
|
$9,400.000
|
$9,620.000
|
$10,000.000
|
$9,000.000
|
$35,900.000
|
$15,000.000
|
$12,000.000
|
$16,000.000
|
$8,000.000
|
|
|
IRRIGATION WELL (48")
|
EA
|
3.000
|
$12,000.000
|
$17,680.000
|
$12,000.000
|
$8,735.450
|
$8,500.000
|
$45,000.000
|
$45,000.000
|
$20,000.000
|
$20,000.000
|
|
|
IRRIGATION WELL (60")
|
EA
|
4.000
|
$18,500.000
|
$22,000.000
|
$19,000.000
|
$8,723.410
|
$10,500.000
|
$55,000.000
|
$32,000.000
|
$24,000.000
|
$26,000.000
|
|
|
PRSSR IRRIG PVC PIPE (18")
|
LF
|
318.000
|
$220.000
|
$77.000
|
$90.000
|
$70.290
|
$72.500
|
$85.000
|
$153.520
|
$180.000
|
$150.000
|
|
|
PRSSR IRRIG PVC PIPE (24")
|
LF
|
606.000
|
$237.390
|
$110.000
|
$115.000
|
$100.080
|
$107.000
|
$118.000
|
$179.500
|
$240.000
|
$175.000
|
|
|
SP MIXES SP-B SAC-B PG76-22
|
TON
|
25,516.000
|
$130.000
|
$120.000
|
$117.000
|
$110.000
|
$122.000
|
$120.000
|
$119.700
|
$112.000
|
$150.000
|
|
|
SP MIXES SP-C SAC-A PG76-22
|
TON
|
14,998.000
|
$107.980
|
$120.000
|
$122.000
|
$115.000
|
$125.000
|
$105.000
|
$119.700
|
$115.000
|
$175.000
|
|
|
BONDING COURSE
|
GAL
|
9,209.000
|
$4.750
|
$6.000
|
$3.000
|
$6.350
|
$3.650
|
$5.850
|
$6.000
|
$3.000
|
$5.000
|
|
|
RC LOW HEAD PRSSR PIPE (CL III)(60")
|
LF
|
288.000
|
$320.000
|
$660.000
|
$500.000
|
$336.470
|
$300.000
|
$320.000
|
$494.340
|
$650.000
|
$600.000
|
|
|
RC LOW HEAD PRSSR PIPE (CL III)(48")
|
LF
|
320.000
|
$300.000
|
$440.000
|
$315.000
|
$230.120
|
$205.000
|
$222.000
|
$374.880
|
$530.000
|
$425.000
|
|
|
GEOGRID BASE REINFORCEMENT (TY II)
|
SY
|
139,987.000
|
$1.350
|
$3.000
|
$1.250
|
$1.250
|
$1.100
|
$1.250
|
$1.190
|
$1.350
|
$1.250
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
100.000
|
$106.680
|
$12.000
|
$100.000
|
$75.000
|
$99.500
|
$100.000
|
$500.000
|
$150.000
|
$200.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$3,277.760
|
$310.000
|
$10,000.000
|
$8,000.000
|
$5,850.000
|
$15,000.000
|
$800.000
|
$8,200.000
|
$30,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
780.000
|
$72.620
|
$15.000
|
$1.000
|
$1.000
|
$164.000
|
$95.000
|
$180.000
|
$25.000
|
$400.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
520.000
|
$115.180
|
$25.000
|
$10.000
|
$1.000
|
$175.000
|
$200.000
|
$180.000
|
$0.010
|
$100.000
|
|
|
WELDED STEEL CASING PIPE (24")
|
LF
|
271.000
|
$370.000
|
$280.000
|
$250.000
|
$230.000
|
$219.000
|
$165.000
|
$282.720
|
$548.000
|
$400.000
|
|
|
WELDED STEEL CASING PIPE (36")
|
LF
|
550.000
|
$370.000
|
$370.000
|
$325.000
|
$320.000
|
$317.000
|
$215.000
|
$356.180
|
$620.000
|
$500.000
|
|
Totals: |
$21,445,754.752
|
$19,548,135.000
|
$19,599,307.602
|
$19,640,524.800
|
$20,062,627.900
|
$20,718,121.140
|
$21,885,338.475
|
$22,731,325.150
|
$32,795,643.700
|