Show Job Controls
Bid Cobra

HIDALGO FM 491 (0861-01-068)

Items: 77

County: HIDALGO
Length: N/A
Highway: FM 491
District: PHARR
Control Number: 0861-01-068
DBE Goal: N/A
Project: STP 2022(723)HES
Guaranty: N/A
Time: 180 WORKING DAYS
Engineer's Estimate: $3,910,866.61
Date: 06/29/2022 (3 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
JESUS NORIEGA
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$3,910,866.61
1
Awarded
$3,701,235.71
Over/Under Est: -5.36% -$209,630.90
$3,839,510.90
Over/Under Est: -1.82% -$71,355.71
Amt Left: 3.74% $138,275.19
Over/Under Est: 0.2% $7,935.39
Amt Left: 5.88% $217,566.29
Delta: -2.07% -$79,291.10
$5,233,484.56
Over/Under Est: 33.82% $1,322,617.95
Amt Left: 41.4% $1,532,248.85
Delta: -33.55% -$1,314,682.56
Subcontractor Percentage Amount
HIGHWAY BARRICADES AND SERVICES, LLC 2.15% $81,885.34
TEXAS ICON CONSTRUCTION, LLC 0.96% $36,562.76
Total: 3.11% $118,448.10

Bid Items & Bid Tabulations

77 Total 0 of 77
HIDALGO  |  FM 491  |  PHARR  |  0861-01-068  |  06/29/2022  |  $3,910,866.61  |  STP 2022(723)HES  |  HAZARD ELIM & SAFETY  |  180 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ASAGO, LLC
FOREMOST PAVING, INC.
TEXAS CORDIA CONSTRUCTION, LLC
IOC COMPANY, LLC
PREPARING ROW
STA 168.000 $1,500.000 $1,000.000 $1,150.000 $600.000 $2,500.000
REMOVING CONC (DRIVEWAYS)
SY 60.000 $12.000 $20.000 $55.000 $41.000 $70.000
REMOVE STAB BASE AND ASPH PAV (1"-3")
SY 36,668.000 $5.000 $2.300 $2.500 $3.000 $1.500
EXCAVATION (ROADWAY)
CY 6,225.000 $7.500 $4.000 $16.000 $7.000 $10.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 3,757.000 $8.000 $8.000 $16.000 $3.000 $3.000
BACKFILL (TY A)
STA 168.000 $200.000 $150.000 $225.000 $113.000 $330.000
FURNISHING AND PLACING TOPSOIL
CY 50.000 $30.000 $35.000 $50.000 $48.000 $50.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 49,355.000 $0.400 $0.430 $0.420 $0.500 $0.590
CELL FBR MLCH SEED(TEMP)(WARM)
SY 49,355.000 $0.400 $0.330 $0.320 $0.250 $0.490
VEGETATIVE WATERING
MG 857.000 $30.000 $20.000 $52.000 $18.000 $25.000
SPRINKLING (DUST CONTROL)
MG 672.000 $3.000 $1.000 $1.000 $31.000 $1.000
FL BS (RDWY DEL)(TY E GR 4)(FNAL POS)
CY 12,293.000 $30.000 $30.000 $28.000 $38.000 $57.000
RWRK BS MTL(TY B)(4")(DEN CNT)(ORG POS)
CY 4,446.000 $6.000 $8.000 $11.000 $3.000 $20.000
LIME TRT (EXST MATL) (12")
SY 65,791.000 $2.000 $2.900 $3.300 $1.000 $2.150
LIME (HYD, COM OR QK)(SLURRY)
TON 980.000 $160.000 $225.000 $177.000 $208.000 $200.000
CEMENT
TON 567.000 $180.000 $195.000 $190.000 $246.000 $225.000
CEM TRT (MX EXT MTL/NW BASE)(DC)(10")
SY 62,416.000 $2.000 $2.400 $2.000 $1.000 $2.500
PRIME COAT (MC-30)
GAL 12,483.000 $5.000 $5.000 $5.000 $6.000 $6.000
ASPH (TIER II)
GAL 17,713.000 $5.000 $5.500 $6.500 $5.000 $6.000
AGGR (TY-B GR-4P SAC-B)
CY 494.000 $90.000 $90.000 $70.000 $123.000 $200.000
PLANE CONC PAV(0" TO 1-1/2")
SY 572.000 $13.500 $15.000 $18.000 $26.000 $10.000
STRUCT EXCAV
CY 78.000 $12.000 $20.000 $16.000 $81.000 $175.000
CEM STABIL BKFL
CY 70.000 $70.000 $65.000 $76.000 $66.000 $150.000
STRUCT EXCAV (SPECIAL)
CY 40.000 $40.000 $60.000 $45.000 $79.000 $175.000
TRENCH EXCAVATION PROTECTION
LF 265.000 $3.000 $1.500 $5.000 $8.000 $1.000
RIPRAP (CONC)(4 IN)
CY 3.000 $425.000 $750.000 $1,250.000 $963.000 $1,500.000
RC PIPE (CL III)(18 IN)
LF 648.000 $75.000 $60.000 $55.000 $54.000 $175.000
RC PIPE (CL IV)(18 IN)
LF 196.000 $80.000 $65.000 $60.000 $64.000 $200.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 10.000 $1,500.000 $1,200.000 $1,200.000 $1,600.000 $1,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 34.000 $1,200.000 $1,000.000 $1,400.000 $1,700.000 $1,000.000
REMOV STR (SET)
EA 6.000 $500.000 $200.000 $400.000 $371.000 $450.000
REMOV STR (PIPE)
LF 657.000 $15.000 $6.000 $7.000 $8.000 $15.000
MOBILIZATION
LS 1.000 $360,000.000 $330,000.000 $300,000.000 $255,000.000 $500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $5,000.000 $4,000.000 $5,500.000 $7,500.000 $2,200.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 50.000 $40.000 $30.000 $105.000 $105.000 $90.000
ROCK FILTER DAMS (REMOVE)
LF 50.000 $20.000 $15.000 $75.000 $75.000 $25.000
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 390.000 $25.000 $18.000 $42.000 $25.000 $14.880
CONSTRUCTION EXITS (REMOVE)
SY 390.000 $8.000 $5.000 $24.000 $12.000 $5.380
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,480.000 $3.000 $4.000 $3.500 $3.000 $4.250
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,480.000 $1.000 $1.500 $1.500 $2.000 $1.350
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,380.000 $5.000 $5.500 $6.000 $6.000 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,380.000 $1.000 $1.500 $1.500 $1.000 $1.350
CONSTRUCTING DETOURS
SY 82.000 $55.000 $190.000 $275.000 $150.000 $170.000
DRIVEWAYS (CONC)
SY 58.000 $80.000 $70.000 $150.000 $130.000 $400.000
DRIVEWAYS (ACP)
SY 540.000 $40.000 $45.000 $65.000 $42.000 $105.000
MTL W-BEAM GD FEN (TIM POST)
LF 400.000 $26.000 $29.000 $32.000 $25.000 $39.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,000.000 $3,300.000 $3,500.000 $3,200.000 $3,650.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 3.000 $250.000 $220.000 $350.000 $400.000 $325.000
ALUMINUM SIGNS (TY A)
SF 20.000 $25.000 $40.000 $30.000 $26.000 $26.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 9.000 $700.000 $750.000 $750.000 $990.000 $825.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 14.000 $900.000 $780.000 $1,100.000 $1,300.000 $1,100.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 6.000 $1,100.000 $1,050.000 $1,100.000 $1,310.000 $1,200.000
REMOVE SM RD SN SUP&AM
EA 29.000 $90.000 $70.000 $190.000 $72.000 $80.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 24.000 $50.000 $40.000 $115.000 $40.000 $25.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 24.000 $150.000 $70.000 $60.000 $118.000 $90.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 681.000 $0.600 $0.660 $0.650 $0.750 $0.650
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 16.000 $8.000 $7.100 $7.000 $7.000 $7.000
WK ZN PAV MRK REMOV (Y)4"(BRK)
LF 6,174.000 $0.900 $0.660 $1.000 $0.750 $0.650
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 27,358.000 $0.600 $0.610 $0.650 $0.500 $0.600
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,560.000 $1.000 $1.250 $1.200 $5.000 $4.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 36.000 $6.500 $9.100 $9.000 $9.000 $9.000
REFL PAV MRK TY II (W) 4" (SLD)
LF 32,843.000 $0.120 $0.310 $0.300 $0.250 $0.300
REFL PAV MRK TY II (W) 24" (SLD)
LF 36.000 $3.000 $2.100 $2.000 $2.000 $2.000
REFL PAV MRK TY II (Y) 4" (BRK)
LF 3,860.000 $0.120 $0.320 $0.320 $0.250 $0.310
REFL PAV MRK TY II (Y) 4" (SLD)
LF 7,175.000 $0.120 $0.330 $0.320 $0.250 $0.320
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 3,860.000 $0.300 $0.430 $0.450 $0.500 $0.420
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 7,983.000 $0.300 $0.430 $0.450 $0.500 $0.420
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 32,843.000 $0.500 $0.760 $0.800 $0.750 $0.750
REFL PAV MRKR TY II-A-A
EA 296.000 $3.250 $4.300 $4.200 $4.000 $4.200
TRAFFIC BUTTON TY Y
EA 1,328.000 $4.500 $1.860 $1.900 $2.000 $1.850
TRAFFIC BUTTON TY B
EA 5,084.000 $2.000 $1.860 $1.900 $2.000 $1.850
ELIM EXT PAV MRK & MRKS (4")
LF 12,781.000 $0.350 $0.360 $1.200 $0.250 $0.350
D-GR HMA TY-D SAC-A PG76-22
TON 10,233.000 $127.000 $125.000 $117.000 $154.000 $165.000
BONDING COURSE
GAL 4,242.000 $5.000 $4.000 $4.500 $7.000 $6.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $8,000.000 $5,000.000 $6,000.000 $7,000.000 $200.000
TMA (STATIONARY)
DAY 360.000 $200.000 $1.000 $30.000 $10.000 $200.000
TMA (MOBILE OPERATION)
DAY 30.000 $200.000 $1.000 $1.000 $20.000 $400.000
Totals: $3,910,866.610 $3,701,235.710 $3,839,510.900 $3,918,802.000 $5,233,484.560