PREPARING ROW
|
STA
|
204.900
|
$550.000
|
$4,200.000
|
$228.000
|
$340.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
359.000
|
$4.000
|
$11.000
|
$3.800
|
$7.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
11,732.400
|
$8.000
|
$13.000
|
$9.150
|
$12.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
45,202.460
|
$9.000
|
$15.000
|
$12.500
|
$16.000
|
|
|
FURNISHING AND PLACING TOPSOIL
|
CY
|
47.000
|
$26.100
|
$69.000
|
$34.000
|
$37.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
169,161.000
|
$0.160
|
$0.280
|
$0.310
|
$0.200
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
169,161.000
|
$0.200
|
$0.190
|
$0.190
|
$0.200
|
|
|
VEGETATIVE WATERING
|
MG
|
2,630.000
|
$12.000
|
$32.000
|
$36.000
|
$35.000
|
|
|
PROOF ROLLING
|
HR
|
61.000
|
$100.000
|
$70.000
|
$51.000
|
$86.000
|
|
|
FL BS (RDWY DEL)(TY E GR 4)(FNAL POS)
|
CY
|
17,025.000
|
$28.000
|
$25.000
|
$30.250
|
$31.000
|
|
|
REWORK BS MTL (TY B) (6") (ORD COMP)
|
SY
|
126,149.000
|
$3.000
|
$2.000
|
$0.900
|
$5.000
|
|
|
LIME TRT (EXST MATL) (12")
|
SY
|
127,287.000
|
$3.000
|
$2.500
|
$2.050
|
$3.000
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
3,208.300
|
$170.000
|
$135.000
|
$211.000
|
$170.000
|
|
|
CEMENT
|
TON
|
1,149.100
|
$160.000
|
$155.000
|
$191.000
|
$190.000
|
|
|
CEMENT TRT (MX EXST MTL & NW BS)(10")
|
SY
|
122,544.000
|
$2.900
|
$3.000
|
$1.750
|
$5.400
|
|
|
ASPHALT STAB BASE (GR 4)(PG 64)
|
TON
|
2,343.300
|
$80.000
|
$95.000
|
$93.000
|
$97.000
|
|
|
SALV, HAUL & STKPL RCL APH PV (6 TO 8")
|
SY
|
119,967.000
|
$4.000
|
$5.500
|
$3.900
|
$4.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
36,763.200
|
$4.000
|
$4.000
|
$4.350
|
$4.600
|
|
|
ASPH (TIER II)
|
GAL
|
35,599.000
|
$4.000
|
$4.500
|
$4.050
|
$4.500
|
|
|
AGGR (TY-D GR-4P)(SAC-B)
|
CY
|
1,130.900
|
$50.000
|
$38.000
|
$113.000
|
$99.000
|
|
|
SUPERPAVE MIXTURES SP-D SAC-A PG76-22
|
TON
|
21,160.900
|
$110.000
|
$92.000
|
$106.000
|
$110.000
|
|
|
PLANE ASPH CONC PAV (0" TO 1 1/2")
|
SY
|
1,821.000
|
$2.000
|
$8.000
|
$1.450
|
$8.000
|
|
|
CEM STABIL BKFL
|
CY
|
124.380
|
$60.920
|
$39.000
|
$59.500
|
$105.000
|
|
|
CUT & RESTORING PAV
|
SY
|
119.100
|
$70.000
|
$35.000
|
$43.500
|
$74.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
40.000
|
$2.450
|
$15.000
|
$3.000
|
$5.250
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
64.000
|
$280.000
|
$280.000
|
$310.000
|
$280.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
34.900
|
$440.000
|
$465.000
|
$532.000
|
$360.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
729.000
|
$50.000
|
$35.000
|
$37.250
|
$68.000
|
|
|
RC PIPE (CL IV) (24 IN) (SPL)
|
LF
|
376.000
|
$60.900
|
$50.000
|
$63.000
|
$88.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
36.000
|
$850.000
|
$950.000
|
$844.000
|
$1,250.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
5.000
|
$1,084.000
|
$1,100.000
|
$1,010.000
|
$1,250.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
7.000
|
$1,115.000
|
$1,100.000
|
$1,100.000
|
$1,570.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
11.000
|
$2,000.000
|
$250.000
|
$1,750.000
|
$1,570.000
|
|
|
REMOV STR (SET)
|
EA
|
2.000
|
$375.000
|
$250.000
|
$317.000
|
$260.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
12.000
|
$1,000.000
|
$355.000
|
$1,470.000
|
$1,570.000
|
|
|
REMOV STR (PIPE)
|
LF
|
320.000
|
$16.500
|
$9.000
|
$9.850
|
$13.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
212.000
|
$44.500
|
$44.000
|
$29.500
|
$140.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$891,000.000
|
$800,000.000
|
$670,000.000
|
$827,300.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
19.000
|
$6,800.000
|
$8,000.000
|
$14,800.000
|
$19,950.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
1,482.000
|
$20.520
|
$22.000
|
$14.750
|
$37.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,482.000
|
$6.000
|
$12.000
|
$8.600
|
$8.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
47,949.000
|
$2.500
|
$2.350
|
$2.100
|
$2.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
47,949.000
|
$0.630
|
$0.900
|
$0.900
|
$0.900
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
3,000.000
|
$4.150
|
$5.250
|
$2.300
|
$5.400
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
3,000.000
|
$1.100
|
$1.000
|
$0.500
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
27,658.000
|
$45.000
|
$32.000
|
$41.250
|
$33.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
19,320.000
|
$40.800
|
$30.000
|
$67.500
|
$55.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
18,930.000
|
$6.500
|
$2.500
|
$9.600
|
$2.600
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
19,320.000
|
$5.920
|
$6.000
|
$6.000
|
$14.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
3,126.000
|
$36.000
|
$30.000
|
$30.750
|
$40.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
400.000
|
$26.000
|
$45.000
|
$27.250
|
$25.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
875.000
|
$5.000
|
$11.000
|
$3.000
|
$2.100
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$2,900.000
|
$3,300.000
|
$2,980.000
|
$2,770.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$350.000
|
$1,500.000
|
$356.000
|
$300.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
14.000
|
$1,400.000
|
$4,300.000
|
$1,290.000
|
$1,200.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
22.000
|
$900.000
|
$2,000.000
|
$761.000
|
$640.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
22.000
|
$22,000.000
|
$20,000.000
|
$9,470.000
|
$8,810.000
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
16.000
|
$1.950
|
$5.000
|
$5.650
|
$5.250
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
393.000
|
$2.000
|
$2.200
|
$2.400
|
$2.200
|
|
|
ZINC-COAT STL WIRE STRAND (3/8")
|
LF
|
259.000
|
$3.000
|
$2.100
|
$2.400
|
$2.200
|
|
|
ELC SRV TY T 120/240 000(NS)GS(L)TS(O)
|
EA
|
2.000
|
$1,900.000
|
$1,850.000
|
$1,700.000
|
$1,570.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
42.000
|
$22.000
|
$20.000
|
$20.250
|
$31.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
33.000
|
$525.000
|
$530.000
|
$592.000
|
$550.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
4.000
|
$700.000
|
$730.000
|
$818.000
|
$760.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
4.000
|
$750.000
|
$775.000
|
$874.000
|
$810.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
4.000
|
$560.000
|
$400.000
|
$451.000
|
$420.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
36.000
|
$75.000
|
$60.000
|
$67.500
|
$63.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
|
EA
|
33.000
|
$40.000
|
$75.000
|
$79.000
|
$74.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
25.000
|
$80.000
|
$75.000
|
$79.000
|
$74.000
|
|
|
INSTL OM ASSM (OM-3R)(FLX)GND
|
EA
|
2.000
|
$150.000
|
$355.000
|
$395.000
|
$370.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
20.000
|
$30.000
|
$28.000
|
$31.500
|
$30.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
107,558.000
|
$0.300
|
$0.330
|
$0.350
|
$0.350
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
150,456.000
|
$0.300
|
$0.330
|
$0.350
|
$0.350
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
3,808.000
|
$2.980
|
$3.500
|
$4.000
|
$4.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,327.000
|
$0.900
|
$1.500
|
$1.700
|
$1.600
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
329.000
|
$6.300
|
$6.000
|
$5.650
|
$5.250
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
4.000
|
$115.000
|
$75.000
|
$19.500
|
$79.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
4.000
|
$140.000
|
$125.000
|
$141.000
|
$130.000
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
1,430.000
|
$3.000
|
$3.000
|
$2.250
|
$2.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
590.000
|
$0.750
|
$0.350
|
$0.400
|
$0.350
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
3,730.000
|
$0.350
|
$0.350
|
$0.400
|
$0.350
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
4,300.000
|
$0.300
|
$0.350
|
$0.400
|
$0.350
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
31,025.000
|
$0.350
|
$0.330
|
$0.350
|
$0.350
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
46,935.000
|
$0.550
|
$0.700
|
$0.800
|
$0.700
|
|
REFL PAV MRKR TY I-C
|
EA
|
86.000
|
$3.200
|
$3.500
|
$4.000
|
$3.700
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,224.000
|
$2.800
|
$3.000
|
$3.400
|
$3.000
|
|
TRAFFIC BUTTON TY Y
|
EA
|
3,825.000
|
$2.200
|
$2.000
|
$2.250
|
$2.000
|
|
TRAFFIC BUTTON TY B
|
EA
|
5,273.000
|
$1.650
|
$2.000
|
$2.250
|
$2.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
68,312.000
|
$0.480
|
$0.450
|
$0.500
|
$0.500
|
|
|
INSTALL HWY TRF SIG (FLASH BEACON)
|
EA
|
2.000
|
$4,500.000
|
$2,500.000
|
$2,765.000
|
$2,570.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
2.000
|
$3,000.000
|
$2,200.000
|
$2,370.000
|
$2,200.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
8.000
|
$220.000
|
$265.000
|
$300.000
|
$280.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
6.000
|
$220.000
|
$265.000
|
$300.000
|
$280.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
|
LF
|
553.000
|
$2.500
|
$2.250
|
$2.400
|
$2.200
|
|
|
INS TRF SIG PL AM (S)STR(TY D)LUM
|
EA
|
4.000
|
$8,000.000
|
$6,500.000
|
$7,350.000
|
$6,820.000
|
|
Totals: |
$11,030,084.790
|
$10,978,592.660
|
$11,026,542.940
|
$12,256,361.780
|