Show Job Controls
Bid Cobra

HIDALGO SH 107 (0342-01-074)

Items: 184

County: HIDALGO
Length: N/A
Highway: SH 107
District: PHARR
Control Number: 0342-01-074
DBE Goal: N/A
Project: STP 2019(085)
Guaranty: N/A
Time: 461 WORKING DAYS
Engineer's Estimate: $20,285,141.64
Date: 03/06/2019 (7 years ago)
Contract Number: N/A
Type: CONST 6 LN DIV RURAL
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$20,285,141.64
$21,103,891.16
Over/Under Est: 4.04% $818,749.52
Over/Under Est: 8.04% $1,630,617.80
Amt Left: 3.85% $811,868.28
$23,308,682.67
Over/Under Est: 14.91% $3,023,541.03
Amt Left: 10.45% $2,204,791.51
Delta: -6.36% -$1,392,923.23
Over/Under Est: 24.94% $5,060,007.89
Amt Left: 20.1% $4,241,258.37
Delta: -8.74% -$2,036,466.86
Subcontractor Percentage Amount
GP7 CONSTRUCTION INC. 9.28% $2,850,073.82
TRAF-TEX, INC. 4.53% $1,391,253.71
HIGHWAY BARRICADES AND SERVICES, LLC 1.27% $390,042.43
SOIL-TECH, INC. 0.38% $116,705.61
SOIL TECH ADVANCE INC. 0.38% $116,705.61
RIO GRANDE REBAR RODBUSTERS, LLC 0.03% $9,213.60
G & E ESCOBEDO CONSTRUCTION, INC. 0.00% $0.00
Total: 15.87% $4,873,994.78

Bid Items & Bid Tabulations

184 Total 0 of 184
HIDALGO  |  SH 107  |  PHARR  |  0342-01-074  |  03/06/2019  |  $20,285,141.64  |  STP 2019(085)  |  CONST 6 LN DIV RURAL  |  461 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FOREMOST PAVING, INC.
TEXAS CORDIA CONSTRUCTION, LLC
REIM CONSTRUCTION, INC.
PULICE CONSTRUCTION, INC.
PREPARING ROW
STA 373.300 $450.000 $4,800.000 $1,000.000 $350.000 $5,535.000
REMOVING CONC (SIDEWALKS)
SY 1,132.800 $5.210 $8.000 $3.000 $10.250 $10.600
REMOVING CONC (DRIVEWAYS)
SY 3,290.240 $10.000 $12.000 $4.000 $14.250 $13.780
REMOVING CONC (CURB)
LF 300.000 $5.000 $2.000 $3.000 $1.500 $6.890
REMOVING CONC (CURB AND GUTTER)
LF 1,926.000 $3.000 $4.000 $2.000 $2.500 $5.300
OBLITERATING ABANDONED ROAD
SY 1,469.000 $2.500 $3.000 $3.000 $3.700 $4.240
EXCAVATION (ROADWAY)
CY 182,528.000 $4.500 $2.700 $4.000 $6.800 $5.300
EXCAVATION (CHANNEL)
CY 4.250 $20.000 $350.000 $260.000 $26.500 $105.960
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 926.030 $20.000 $5.250 $4.000 $7.500 $6.360
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 39,991.000 $3.000 $3.400 $5.000 $4.750 $2.380
FURNISHING AND PLACING TOPSOIL
CY 161.000 $22.000 $10.000 $20.000 $32.750 $35.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 4,657.000 $0.500 $0.250 $0.350 $0.350 $0.320
CELL FBR MLCH SEED(TEMP)(WARM)
SY 4,657.000 $0.320 $0.250 $0.300 $0.350 $0.260
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 202,030.000 $0.240 $0.270 $0.350 $0.260 $0.280
DRILL SEEDING (TEMP) (WARM)
SY 202,030.000 $0.240 $0.250 $0.200 $0.260 $0.170
VEGETATIVE WATERING
MG 142.500 $15.000 $24.000 $11.000 $28.000 $51.000
SPRINKLING (DUST CONTROL)
MG 1,493.000 $4.000 $1.000 $4.000 $19.750 $10.600
PROOF ROLLING
HR 10.000 $55.000 $50.000 $44.000 $50.500 $79.470
FL BS (RDWY DEL)(TY E GR 4)(FNAL POS)
CY 56,347.000 $18.000 $16.250 $23.000 $31.500 $21.000
REWORK BS MTL (TY B)(12")(DENS CONT)
SY 63,718.000 $2.000 $3.000 $6.000 $1.850 $3.280
REWORK BS MATL (TY B)(11")(DENS CONT)
SY 46,945.000 $2.000 $3.000 $5.000 $1.700 $3.180
REWORK BS MTL (TY B) (17") (DENS CONT)
SY 45,465.000 $3.500 $3.000 $8.000 $2.650 $4.610
REWORK BS MTL (TY B)(16")(DENS CONT)
SY 89,570.000 $3.000 $3.000 $7.000 $2.450 $3.870
LIME TRT(MIX EXST MATL & NEW BASE)(8")
SY 4,544.000 $7.000 $3.000 $1.000 $2.050 $2.380
LIME (HYD, COM OR QK)(SLURRY)
TON 1,286.000 $160.000 $130.000 $220.000 $216.000 $170.000
LIME TRT (SUBGRADE)(12")
SY 84,313.000 $1.750 $2.100 $0.650 $1.850 $2.500
CEMENT
TON 5,105.000 $155.000 $147.000 $170.000 $178.000 $165.000
CEM TRT(MX EXST MTL & NEW BS)(14")
SY 77,725.000 $2.600 $2.250 $0.750 $2.500 $2.380
CEMENT TRT(MIX EXIST & NEW BS)(DC)(20")
SY 217,847.000 $3.000 $3.500 $1.500 $3.650 $3.440
ASPHALT STAB BASE (GR 4)(PG 64)
TON 92.000 $65.000 $90.000 $190.000 $111.500 $153.650
PRIME COAT (MC-30)
GAL 60,023.000 $3.500 $3.500 $4.000 $4.150 $4.720
ASPH (TIER II)
GAL 88,671.000 $3.000 $4.500 $3.000 $3.700 $3.500
AGGR (TY-D GR-4P)(SAC-B)
CY 2,463.000 $55.000 $30.000 $65.000 $94.000 $79.470
D-GR HMA TY-D SAC-A PG76-22
TON 375.000 $85.000 $90.000 $116.000 $106.300 $110.000
SUPERPAVE MIXTURES SP-D SAC-A PG76-22
TON 56,033.000 $78.000 $85.000 $117.000 $103.750 $92.000
PLANE CONC PAV(0" TO 1-1/2")
SY 366.500 $3.000 $20.000 $6.000 $1.700 $8.480
PLANE ASPH CONC PAV (1.5")
SY 7,710.000 $1.250 $2.750 $2.000 $1.950 $3.440
CONC PVMT (CONT REINF - CRCP) (12")
SY 421.000 $65.000 $150.000 $215.000 $92.500 $130.000
CEM STABIL BKFL
CY 903.500 $50.000 $40.000 $50.000 $53.500 $30.000
CUT & RESTORING PAV
SY 667.100 $50.000 $130.000 $60.000 $28.500 $68.880
STRUCT EXCAV (SPECIAL)
CY 264.250 $55.000 $35.000 $40.000 $54.500 $58.280
SAND BACKFILL
CY 2,270.600 $15.000 $13.000 $20.000 $19.150 $15.890
TRENCH EXCAVATION PROTECTION
LF 6,057.900 $2.000 $2.500 $4.000 $1.950 $1.000
DRILL SHAFT (30 IN)
LF 602.000 $134.000 $100.000 $150.000 $141.000 $207.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 380.000 $165.000 $120.000 $140.000 $141.000 $115.000
DRILL SHAFT (TRF SIG POLE) (24 IN)
LF 30.000 $170.000 $100.000 $115.000 $117.000 $95.250
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 378.000 $250.000 $150.000 $175.000 $178.000 $145.000
RIPRAP (CONC)(4 IN)
CY 3,823.340 $400.000 $200.000 $240.000 $345.000 $291.400
RIPRAP (CONC)(6 IN)
CY 49.000 $500.000 $475.000 $250.000 $356.000 $402.660
CONC BOX CULV (8 FT X 4 FT)
LF 576.000 $435.000 $425.000 $500.000 $460.000 $410.000
RC PIPE (CL IV)(18 IN)
LF 1,364.300 $65.000 $34.000 $45.000 $45.500 $57.000
RC PIPE (CL III)(18 IN)(SPL)
LF 13,900.600 $39.000 $27.000 $40.000 $40.500 $59.000
RC PIPE (CL III)(24 IN)(SPL)
LF 2,942.200 $42.000 $38.000 $50.000 $53.500 $73.000
RC PIPE (CL III)(30 IN)(SPL)
LF 371.000 $60.000 $55.000 $70.000 $72.500 $82.000
RC PIPE (CL III)(36 IN)(SPL)
LF 96.000 $81.000 $78.000 $100.000 $93.500 $115.000
RC PIPE (CL III)(48 IN)(SPL)
LF 613.900 $122.000 $118.000 $140.000 $144.000 $160.000
INLET (COMPL)(PCU)(4FT)(NONE)
EA 11.000 $3,000.000 $3,800.000 $2,855.000 $2,540.000 $4,204.410
INLET (COMPL)(TY A)
EA 25.000 $2,500.000 $2,800.000 $2,220.000 $2,540.000 $3,381.600
INLET (COMPL)(TY C)
EA 20.000 $3,500.000 $3,300.000 $2,810.000 $3,150.000 $4,000.150
MANH (COMPL)(TY M)
EA 5.000 $3,200.000 $5,300.000 $3,750.000 $4,700.000 $6,114.530
INLET EXT
EA 2.000 $1,900.000 $1,300.000 $3,500.000 $877.000 $2,269.510
INLET TY A (SPL-1)(MOD)
EA 2.000 $3,000.000 $4,000.000 $3,950.000 $4,570.000 $5,186.730
INLET TY A (SPL-2) W/GRATE
EA 3.000 $3,250.000 $5,200.000 $3,200.000 $2,550.000 $5,186.720
INLET TY A (SPL-1)
EA 4.000 $3,000.000 $4,200.000 $3,200.000 $4,020.000 $4,631.300
INLET TY F (SPL-1)
EA 9.000 $2,750.000 $4,900.000 $3,100.000 $3,850.000 $4,313.620
INLET TY F (SPL-2)
EA 1.000 $3,000.000 $5,000.000 $3,200.000 $3,930.000 $4,397.760
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 24.000 $400.000 $850.000 $750.000 $633.000 $736.100
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 2.000 $1,000.000 $850.000 $750.000 $631.000 $736.100
SET (TY II) (18 IN) (RCP) (5: 1) (C)
EA 1.000 $1,000.000 $850.000 $800.000 $758.000 $818.150
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 427.000 $700.000 $800.000 $800.000 $831.000 $818.150
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 42.000 $1,100.000 $1,100.000 $950.000 $914.000 $975.950
ADJUSTING MANHOLES & INLETS
EA 22.000 $1,000.000 $375.000 $685.000 $528.000 $2,913.970
CLEAN EXIST CULVERTS
EA 3.000 $2,000.000 $500.000 $1,850.000 $3,510.000 $4,768.310
REMOV STR (INLET)
EA 22.000 $307.000 $250.000 $500.000 $308.000 $794.720
REMOV STR (SET)
EA 27.000 $150.000 $250.000 $170.000 $300.000 $476.830
REMOV STR (HEADWALL)
EA 20.000 $300.000 $500.000 $1,100.000 $992.000 $2,119.250
REMOV STR (PIPE)
LF 11,539.500 $5.650 $7.000 $6.000 $9.700 $7.420
MOBILIZATION
LS 1.000 $1,100,000.000 $1,900,000.000 $508,000.000 $1,250,000.000 $2,500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 30.000 $4,000.000 $4,500.000 $7,000.000 $9,050.000 $10,000.000
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 936.000 $36.010 $15.000 $13.000 $14.500 $35.000
CONSTRUCTION EXITS (REMOVE)
SY 936.000 $10.000 $5.000 $8.000 $8.500 $7.000
FRNT END LOADER WORK (ERSN & SEDM CONT)
HR 656.000 $56.500 $65.000 $85.000 $52.000 $50.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 756.000 $3.000 $2.500 $3.000 $2.800 $2.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 756.000 $1.000 $0.500 $0.450 $0.400 $0.350
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 640.000 $4.000 $4.000 $5.000 $4.450 $4.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 640.000 $1.000 $0.500 $0.450 $0.400 $0.350
CONSTRUCTING DETOURS
SY 17,199.100 $45.000 $20.000 $27.000 $35.500 $28.610
CONC CURB (MOD) (TYPE I)
LF 752.700 $30.000 $30.000 $13.000 $11.500 $7.150
CONC CURB (MOUNTABLE)
LF 57,025.800 $8.000 $6.800 $5.000 $8.900 $7.150
CONC CURB & GUTTER (TY B) (MOUNTABLE)
LF 9,514.800 $12.000 $9.800 $10.000 $14.250 $7.420
CONC CURB & GUTTER (TY A)
LF 5,625.000 $10.000 $11.500 $10.000 $11.000 $11.660
CONC CURB & GUTTER (VALLEY GUTTER)
LF 448.000 $25.000 $38.000 $33.000 $34.750 $37.090
CONC. CURB TY A (BARRIER)
LF 3,417.800 $7.000 $10.000 $7.000 $7.150 $9.540
CONC CURB TY A (BARRIER)(MOD)
LF 45.000 $30.000 $18.000 $9.000 $15.750 $10.600
DRIVEWAYS (CONC)
SY 2,316.240 $69.000 $45.000 $40.000 $52.000 $47.680
DRIVEWAYS (ACP)
SY 14,568.680 $30.000 $27.000 $22.000 $23.250 $31.790
TURNOUTS (ACP)
SY 10,371.000 $35.000 $27.000 $22.000 $27.750 $31.790
CONC SIDEWALKS (4")
SY 1,712.900 $50.000 $29.000 $26.000 $35.000 $36.030
CURB RAMPS (TY 2)
EA 2.000 $1,600.000 $1,300.000 $1,100.000 $1,150.000 $1,324.530
CURB RAMPS (TY 10)
EA 11.000 $1,600.000 $2,500.000 $1,100.000 $1,240.000 $1,377.510
MTL W-BEAM GD FEN (TIM POST)
LF 87.500 $27.000 $34.000 $30.000 $20.750 $28.620
TERMINAL ANCHOR SECTION
EA 1.000 $1,000.000 $2,300.000 $1,400.000 $2,790.000 $988.750
GDRAIL END TRT(INST)(WOOD POST)(TY II)
EA 1.000 $2,650.000 $3,300.000 $4,000.000 $2,270.000 $3,164.010
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 141.000 $230.000 $200.000 $170.000 $206.000 $176.930
MAILBOX INSTALL-D (TWG-POST) TY 1
EA 17.000 $234.000 $300.000 $210.000 $234.000 $218.570
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 13.000 $318.000 $800.000 $330.000 $390.000 $374.690
IN RD IL (TY ST) 50T-8 (400W EQ) LED
EA 38.000 $2,600.000 $3,800.000 $4,400.000 $4,180.000 $3,750.000
CONDT (PVC) (SCH 40) (1")
LF 1,597.000 $10.000 $7.000 $7.000 $7.350 $6.550
CONDT (PVC) (SCH 40) (2")
LF 17,377.000 $8.000 $9.000 $10.000 $9.950 $8.800
CONDT (PVC) (SCH 40) (4")
LF 1,344.000 $13.000 $12.000 $13.000 $12.750 $11.450
CONDT (PVC) (SCH 80) (2") (BORE)
LF 255.000 $20.000 $12.000 $14.000 $13.000 $11.750
CONDT (PVC) (SCH 80) (4") (BORE)
LF 1,712.000 $65.000 $18.000 $20.000 $19.250 $17.200
ELEC CONDR (NO.8) BARE
LF 13,008.000 $1.350 $1.000 $1.000 $1.000 $0.850
ELEC CONDR (NO.8) INSULATED
LF 21,040.000 $1.400 $1.000 $0.900 $1.050 $0.950
ELEC CONDR (NO.6) BARE
LF 206.000 $1.600 $1.000 $1.000 $1.100 $1.000
ELEC CONDR (NO.6) INSULATED
LF 436.000 $1.750 $1.200 $1.250 $1.250 $1.100
TRAY CABLE (4 CONDR) (12 AWG)
LF 5,009.000 $2.200 $2.000 $1.000 $2.100 $1.900
GROUND BOX TY A (122311)W/APRON
EA 87.000 $645.600 $550.000 $600.000 $593.000 $532.000
GROUND BOX TY D (162922)W/APRON
EA 3.000 $1,000.000 $600.000 $700.000 $657.000 $589.000
ZINC-COAT STL WIRE STRAND (3/8")
LF 7,960.000 $4.460 $1.500 $1.500 $1.500 $1.350
ELC SRV TY A 240/480 060(NS)SS(T)TP(O)
EA 1.000 $4,000.000 $4,200.000 $4,500.000 $4,380.000 $3,925.000
ELC SRV TY T 120/240 000(NS)GS(L)TS(O)
EA 8.000 $2,000.000 $1,600.000 $1,700.000 $1,610.000 $1,440.000
ALUMINUM SIGNS (TY A)
SF 310.500 $215.000 $80.000 $30.000 $24.500 $18.210
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 185.000 $500.000 $600.000 $525.000 $585.000 $546.420
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 42.000 $700.000 $800.000 $625.000 $875.000 $650.500
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $800.000 $1,200.000 $700.000 $1,060.000 $848.250
RELOCATE SM RD SN SUP&AM TY S80
EA 6.000 $550.000 $350.000 $450.000 $491.000 $614.070
REMOVE SM RD SN SUP&AM
EA 271.000 $75.000 $50.000 $120.000 $73.500 $88.470
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 27.000 $87.000 $75.000 $80.000 $78.000 $52.040
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 32,409.000 $0.300 $0.500 $0.500 $0.550 $0.450
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 66,024.000 $0.260 $0.300 $0.500 $0.500 $0.430
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 462.000 $1.000 $1.800 $1.000 $1.300 $1.150
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 464.000 $4.000 $6.850 $4.000 $4.200 $3.750
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 30.000 $70.000 $100.000 $60.000 $61.500 $55.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 7.000 $67.000 $140.000 $100.000 $106.000 $95.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 118,958.000 $0.280 $0.450 $0.500 $0.450 $0.430
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 813.000 $1.250 $0.800 $0.500 $0.550 $0.450
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 1,580.000 $0.700 $1.550 $0.500 $0.550 $0.450
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 18,340.000 $1.000 $1.000 $1.000 $1.050 $0.900
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 2,531.000 $2.850 $1.500 $1.500 $1.500 $1.350
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 2,223.000 $6.500 $3.000 $3.500 $3.300 $3.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 1,235.000 $3.000 $1.500 $1.500 $1.500 $1.350
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 36,380.000 $0.310 $0.400 $0.450 $0.500 $0.400
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 65,441.000 $0.400 $0.390 $0.450 $0.500 $0.400
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 81,875.000 $0.350 $0.390 $0.450 $0.400 $0.400
PREFAB PAV MRK TY B (W)(ARROW)
EA 132.000 $280.000 $300.000 $350.000 $329.000 $295.000
PREFAB PAV MRK TY B (W)(WORD)
EA 132.000 $475.000 $500.000 $590.000 $552.000 $495.000
REFL PAV MRKR TY I-C
EA 66.000 $3.580 $7.000 $4.000 $3.950 $3.500
REFL PAV MRKR TY II-A-A
EA 510.000 $3.500 $3.450 $4.000 $3.950 $3.500
TRAFFIC BUTTON TY II-C-R
EA 2,814.000 $4.250 $3.450 $4.000 $3.950 $3.500
ELIM EXT PAV MRK & MRKS (4")
LF 261,205.000 $0.420 $0.250 $0.250 $0.290 $0.250
ELIM EXT PAV MRK & MRKS (8")
LF 2,238.000 $0.250 $0.500 $0.500 $0.450 $0.450
ELIM EXT PAV MRK & MRKS (24")
LF 2,319.000 $2.250 $2.600 $3.000 $2.800 $2.500
ELIM EXT PAV MRK & MRKS (ARROW)
EA 26.000 $40.000 $33.000 $26.000 $24.500 $22.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 15.000 $50.000 $85.000 $26.000 $24.500 $22.000
INSTALL HWY TRF SIG (FLASH BEACON)
EA 2.000 $1,560.000 $12,000.000 $14,000.000 $13,500.000 $12,120.000
INSTALL HWY TRF SIG (ISOLATED)
EA 7.000 $18,000.000 $31,000.000 $36,000.000 $34,500.000 $30,895.000
REMOVING TRAFFIC SIGNALS
EA 9.000 $4,520.000 $4,000.000 $4,500.000 $4,350.000 $3,900.000
TEMP TRAF SIGNALS
EA 8.000 $5,500.000 $11,800.000 $12,000.000 $13,400.000 $10,900.000
VEH SIG SEC (12")LED(GRN)
EA 64.000 $223.000 $200.000 $200.000 $195.000 $175.000
VEH SIG SEC (12")LED(GRN ARW)
EA 23.000 $225.000 $200.000 $200.000 $195.000 $175.000
VEH SIG SEC (12")LED(YEL)
EA 78.000 $230.000 $200.000 $200.000 $195.000 $175.000
VEH SIG SEC (12")LED(YEL ARW)
EA 23.000 $220.000 $200.000 $200.000 $195.000 $175.000
VEH SIG SEC (12")LED(RED)
EA 77.000 $225.000 $200.000 $200.000 $195.000 $175.000
PED SIG SEC (LED)(COUNTDOWN)
EA 30.000 $587.000 $450.000 $500.000 $474.000 $425.000
BACK PLATE (12")(3 SEC)
EA 28.000 $71.000 $110.000 $125.000 $117.000 $105.000
BACK PLATE (12")(5 SEC)
EA 13.000 $106.000 $130.000 $150.000 $143.000 $128.000
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 5,329.000 $1.430 $1.000 $1.000 $1.050 $0.960
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 11,433.000 $2.250 $1.600 $2.000 $1.650 $1.500
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 4,096.000 $2.370 $2.000 $2.000 $1.900 $1.750
TRF SIG CBL (TY C)(14 AWG)(2 CONDR)
LF 18,911.000 $1.320 $1.200 $1.000 $1.250 $1.100
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 3.000 $6,500.000 $4,500.000 $5,250.000 $4,970.000 $4,455.000
INS TRF SIG PL AM (S)STR(TY B)
EA 1.000 $3,650.000 $4,500.000 $6,200.000 $4,930.000 $4,425.000
INS TRF SIG PL AM (S)STR(TY B)LUM
EA 5.000 $4,050.000 $5,200.000 $6,000.000 $5,690.000 $5,100.000
INS TRF SIG PL AM (S)STR(TY D)LUM
EA 20.000 $4,050.000 $6,000.000 $7,000.000 $6,680.000 $5,992.000
PED POLE ASSEMBLY
EA 2.000 $1,320.000 $1,000.000 $1,000.000 $970.000 $870.000
PED DETECT PUSH BUTTON (APS)
EA 30.000 $764.000 $650.000 $700.000 $697.000 $625.000
PED DETECTOR CONTROLLER UNIT
EA 5.000 $2,735.000 $4,000.000 $4,600.000 $4,440.000 $3,980.000
VEH LP DETECT (SAWCUT)
LF 13,047.000 $11.000 $11.000 $12.000 $12.000 $10.850
SOUND WALL (7 FT)
LF 630.000 $600.000 $295.000 $635.000 $351.000 $582.790
RC LOW HEAD PRSSR PIPE (CL III)(60")
LF 24.000 $250.000 $185.000 $490.000 $231.000 $350.000
GEOGRID BASE REINFORCEMENT (TY II)
SY 304,560.000 $1.100 $1.000 $1.000 $1.000 $1.320
TMA (STATIONARY)
EA 2.000 $9,500.000 $2,500.000 $13,000.000 $12,300.000 $6,357.750
TMA (MOBILE OPERATION)
DAY 80.000 $189.000 $50.000 $145.000 $197.000 $317.890
Totals: $20,285,141.643 $21,103,891.168 $21,915,759.440 $23,308,682.695 $25,345,149.592