HIDALGO IH 69C (0255-07-153)

Items: 54

County: HIDALGO
Length: 0.0000 MILES
Highway: IH 69C
District: PHARR
Control Number: 0255-07-153
DBE Goal: 0.0%
Project: F 2026(410)
Guaranty: $100,000.00
Time: 96 WORKING DAYS
Engineer's Estimate: $8,135,339.33
Date: 04/07/2026 (2 months ago)
Contract Number: 4263009
Type: PREVENTIVE MAINTENANCE
Project ID: A00209575
Contract Type: Federal
Project Description: OVERLAY
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$8,135,339.33
$8,784,921.94
Over/Under Est: 7.98% $649,582.61
$10,925,824.30
Over/Under Est: 34.3% $2,790,484.97
Amt Left: 24.37% $2,140,902.36
$11,130,205.75
Over/Under Est: 36.81% $2,994,866.42
Amt Left: 26.7% $2,345,283.81
Delta: -1.87% -$204,381.45

Bid Items & Bid Tabulations

54 Total 0 of 54
HIDALGO  |  IH 69C  |  PHARR  |  0255-07-153  |  04/07/2026  |  $8,135,339.33  |  F 2026(410)  |  PREVENT MAINT  |  96 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FOREMOST PAVING, INC.
POSILLICO CIVIL, INC.
CK NEWBERRY, LLC
REMOV CONC (MOWSTRIP)
LF 21.000 $15.000 $34.710 $100.000 $200.000
SP MIXES SP-D SAC-A PG76-22
TON 15,679.000 $118.150 $117.670 $145.000 $145.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 25,799.000 $135.540 $135.870 $160.000 $150.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 34,059.000 $45.000 $66.040 $68.000 $70.000
PLANE ASPH CONC PAV(2")
SY 373,943.000 $1.240 $1.500 $1.500 $1.500
RIPRAP (MOW STRIP)(4 IN)
CY 22.000 $591.570 $431.270 $425.000 $650.000
MOBILIZATION
LS 1.000 $350,000.000 $135,000.000 $993,256.750 $1,100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $5,000.000 $8,843.640 $15,000.000 $55,000.000
TMA (STATIONARY)
DAY 120.000 $61.900 $169.500 $140.000 $375.000
TMA (MOBILE OPERATION)
DAY 120.000 $84.510 $0.010 $300.000 $25.000
BIODEG EROSN CONT LOGS (INSTL) (6")
LF 465.000 $3.000 $6.010 $7.500 $10.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 192.000 $4.620 $6.010 $8.000 $15.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 657.000 $1.160 $1.870 $1.300 $5.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 94,576.000 $0.100 $0.170 $0.150 $0.150
MTL W-BEAM GD FEN (TIM POST)
LF 285.000 $28.080 $47.220 $31.000 $35.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,647.920 $1,665.490 $1,800.000 $2,000.000
REMOVE METAL BEAM GUARD FENCE
LF 305.000 $4.080 $10.000 $5.000 $5.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 2.000 $250.000 $402.990 $275.000 $300.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $3,479.210 $39.900 $4,000.000 $4,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $250.000 $756.490 $275.000 $300.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 125.000 $21.430 $21.970 $15.000 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 9.000 $35.000 $31.060 $30.000 $50.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BI)
EA 25.000 $15.000 $35.350 $15.000 $50.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 6,465.000 $0.530 $1.110 $1.000 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 5,501.000 $0.450 $1.110 $1.000 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 9,041.000 $0.950 $0.890 $1.000 $0.900
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 275.000 $0.940 $1.120 $1.100 $1.150
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 818.000 $1.420 $1.120 $1.100 $1.150
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 3,159.000 $5.430 $6.570 $6.500 $7.000
RE PM TY II (W) 6" (BRK)
LF 18,593.000 $0.420 $0.330 $0.300 $0.500
RE PM TY II (W) 6" (SLD)
LF 72,990.000 $0.180 $0.230 $0.300 $0.250
RE PM TY II (W) 24" (SLD)
LF 3,304.000 $4.380 $0.350 $0.300 $0.350
RE PM TY II (Y) 6" (BRK)
LF 3,536.000 $0.430 $0.350 $0.300 $0.350
RE PM TY II (Y) 6" (SLD)
LF 26,055.000 $0.360 $0.270 $0.250 $0.300
RE PM TY III (W)(6")(SLD)
LF 2,023.000 $2.060 $4.550 $4.500 $4.500
RE PM TY III (W)(6")(BRK)
LF 507.000 $2.310 $6.570 $6.500 $7.000
RE PM TY III (Y)(6")(SLD)
LF 2,025.000 $2.090 $4.550 $4.500 $5.000
RE PM TY III (Y)(6")(BRK)
LF 29.000 $2.250 $15.150 $15.000 $15.000
RE PM TY III (BLK)(6")(SHADOW)
LF 507.000 $0.840 $6.570 $6.500 $7.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 18,593.000 $0.630 $0.670 $0.700 $0.700
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 72,990.000 $0.460 $0.610 $0.600 $0.650
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 3,507.000 $0.540 $0.790 $0.800 $0.800
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 73,343.000 $0.510 $0.610 $0.600 $0.600
PREFAB PM TY C (W)(ARROW)
EA 20.000 $135.950 $151.500 $150.000 $165.000
PREFAB PM TY C (W)(NUMBER)
EA 5.000 $302.110 $353.500 $350.000 $375.000
PREFAB PM TY C (W)(WORD)
EA 20.000 $208.630 $252.500 $250.000 $275.000
PREFAB PM TY C (W)(BIKE ARROW)
EA 19.000 $85.000 $95.950 $95.000 $100.000
PREFAB PM TY C (W)(BIKE SYMBOL)
EA 19.000 $191.570 $227.250 $225.000 $225.000
REFL PAV MRKR TY I-C
EA 543.000 $4.700 $7.580 $7.500 $8.000
REFL PAV MRKR TY II-A-A
EA 1,025.000 $4.410 $5.050 $5.000 $5.000
REFL PAV MRKR TY II-C-R
EA 1,191.000 $6.000 $5.050 $5.000 $5.000
ELIM EXT PM & MRKS (4")
LF 4,584.000 $0.100 $0.410 $0.400 $0.500
VEH LP DETECT (SAWCUT)
LF 3,350.000 $14.660 $14.450 $10.000 $40.000
BONDING COURSE
GAL 25,470.000 $3.500 $2.860 $7.000 $4.000
Totals: $8,135,339.330 $8,784,921.940 $10,925,824.300 $11,130,205.750
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $15,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $25,000.00
Total: $40,000.00