|
|
|
PREPARING ROW
|
STA
|
410.800
|
$25,100.000
|
$12,060.000
|
$15,000.000
|
$50,000.000
|
$51,111.050
|
$30,909.000
|
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
2,562.000
|
$30.000
|
$18.000
|
$22.000
|
$3.000
|
$22.000
|
$19.960
|
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
209.000
|
$25.000
|
$45.000
|
$32.000
|
$24.800
|
$43.500
|
$12.520
|
|
|
|
REMOV CONC (CURB)
|
LF
|
80.000
|
$14.500
|
$30.000
|
$28.000
|
$16.600
|
$36.500
|
$11.050
|
|
|
|
RMV (12") TRT/UNTRT BASE & ASPH PAV
|
CY
|
19,445.900
|
$16.000
|
$10.000
|
$2.500
|
$10.510
|
$8.500
|
$17.380
|
|
|
|
EXCAV (ROADWAY)
|
CY
|
355,076.000
|
$5.000
|
$2.000
|
$9.000
|
$8.650
|
$14.060
|
$12.460
|
|
|
|
EXCAV (SPECIAL)
|
CY
|
80,700.000
|
$70.000
|
$5.000
|
$8.000
|
$3.920
|
$11.500
|
$18.140
|
|
|
|
EMBANK (FNL)(OC)(TY A)
|
CY
|
4,200.000
|
$50.000
|
$10.000
|
$4.000
|
$38.820
|
$22.000
|
$30.180
|
|
|
|
EMBANK (FNL)(DC)(TY C)
|
CY
|
749,853.000
|
$10.000
|
$13.620
|
$6.000
|
$5.980
|
$20.000
|
$35.680
|
|
|
|
BACKFILL (TY A)
|
STA
|
54.000
|
$350.000
|
$275.000
|
$310.000
|
$100.000
|
$1,000.000
|
$1,421.120
|
|
|
|
ROAD GRADER WORK (ORD COMP)
|
STA
|
1,193.200
|
$330.000
|
$100.000
|
$78.000
|
$150.000
|
$1,000.000
|
$262.380
|
|
|
|
SPEC EXCAV WORK (HYD EXCAVATOR)
|
HR
|
380.000
|
$450.000
|
$100.000
|
$750.000
|
$190.000
|
$200.000
|
$400.000
|
|
|
|
FURN & PLACE TOPSOIL (4")
|
SY
|
7,669.620
|
$75.000
|
$4.000
|
$7.000
|
$5.500
|
$6.000
|
$5.000
|
|
|
|
DRILL SEED (PERM_RURAL_CLAY)
|
SY
|
766,962.000
|
$0.400
|
$0.350
|
$0.340
|
$0.350
|
$0.150
|
$0.180
|
|
|
|
DRILL SEED (TEMP_WARM)
|
SY
|
766,962.000
|
$0.400
|
$0.310
|
$0.310
|
$0.310
|
$0.120
|
$0.120
|
|
|
|
VEGETATIVE WATERING
|
TGL
|
14,021.000
|
$34.500
|
$10.000
|
$75.000
|
$46.350
|
$85.500
|
$50.000
|
|
|
|
SOIL RET BLKT(SL_MOD_CLAY_LONG_SPRY)
|
SY
|
111,623.000
|
$3.350
|
$2.250
|
$2.300
|
$2.250
|
$0.780
|
$1.200
|
|
|
|
TRANS PLANT MATERIAL (TY I)
|
EA
|
117.000
|
$830.770
|
$85.000
|
$1,000.000
|
$85.000
|
$85.500
|
$100.000
|
|
|
|
VEGETATIVE WATERING
|
TGL
|
80.000
|
$461.170
|
$10.000
|
$90.000
|
$46.350
|
$95.500
|
$50.000
|
|
|
|
SPRINKLING (DUST CONTROL)
|
TGL
|
3,254.100
|
$18.000
|
$1.000
|
$1.000
|
$46.350
|
$210.000
|
$37.820
|
|
|
|
PROOF ROLLING
|
HR
|
481.900
|
$75.000
|
$50.000
|
$86.000
|
$159.610
|
$280.000
|
$123.210
|
|
|
|
FL BS (RDWY DEL)(TY E GR 4)(FNL POS)
|
CY
|
205,154.500
|
$45.000
|
$25.000
|
$24.000
|
$25.000
|
$25.000
|
$52.810
|
|
|
|
GEOGRID BASE REINFORCEMENT (TYPE 2)
|
SY
|
48,003.000
|
$4.000
|
$1.250
|
$2.000
|
$1.740
|
$1.500
|
$1.670
|
|
|
|
REWORK BS MTL (TY B)(6")(ORD COMP)
|
SY
|
77,202.400
|
$2.500
|
$2.500
|
$1.500
|
$1.060
|
$8.000
|
$8.970
|
|
|
|
REWORK BS MTL (TY B)(10")(DENS CONT)
|
SY
|
77,309.400
|
$8.000
|
$3.400
|
$2.200
|
$2.130
|
$13.000
|
$10.850
|
|
|
|
REWORK BS MTL (TY B)(12")(DENS CONT)
|
SY
|
141,650.100
|
$8.500
|
$3.750
|
$2.400
|
$2.320
|
$4.000
|
$12.500
|
|
|
|
REWORK BS MTL (TY B)(18")(DENS CONT)
|
SY
|
100,264.200
|
$10.000
|
$5.750
|
$4.200
|
$4.780
|
$6.000
|
$17.520
|
|
|
|
LIME (COM OR QK)(SLURRY)
|
TON
|
15,850.000
|
$287.500
|
$215.000
|
$290.000
|
$343.040
|
$215.000
|
$376.820
|
|
|
|
LIME TRT (EXIST MATL)(12")
|
SY
|
801,045.000
|
$2.000
|
$2.500
|
$2.300
|
$2.450
|
$2.500
|
$5.210
|
|
|
|
CEMENT
|
TON
|
9,910.000
|
$195.000
|
$188.000
|
$210.000
|
$236.970
|
$280.000
|
$223.320
|
|
|
|
CEMENT TRT (NEW BASE)(12")
|
SY
|
368,460.000
|
$5.000
|
$2.500
|
$3.000
|
$2.230
|
$2.500
|
$3.070
|
|
|
|
CEMENT TREAT (MX EXST MTL & NW BS)(17")
|
SY
|
401,980.000
|
$8.000
|
$2.750
|
$3.700
|
$3.350
|
$2.750
|
$6.410
|
|
|
|
SALV, HAUL & STKPL RCL APH PV (1 1/2")
|
SY
|
29,763.200
|
$1.770
|
$2.000
|
$1.700
|
$1.080
|
$1.000
|
$1.420
|
|
|
|
SALV, HAUL & STKPL RCL APH PV (3 1/2")
|
SY
|
77,202.400
|
$5.000
|
$2.250
|
$2.800
|
$2.340
|
$2.500
|
$3.220
|
|
|
|
SALV, HAUL & STKPL RCL APH PV (4")
|
SY
|
57,952.000
|
$5.000
|
$2.500
|
$3.000
|
$2.720
|
$2.500
|
$3.730
|
|
|
|
SALV, HAUL & STKPL RCL APH PAV (4"-14")
|
SY
|
231,509.000
|
$9.500
|
$7.000
|
$6.000
|
$8.200
|
$8.760
|
$11.200
|
|
|
|
PRIME COAT (MC-30)
|
GAL
|
155,679.000
|
$4.750
|
$4.500
|
$5.000
|
$6.000
|
$4.500
|
$4.500
|
|
|
|
SP MIXES SP-B SAC-B PG64-22
|
TON
|
114,543.000
|
$109.000
|
$110.000
|
$110.000
|
$108.700
|
$136.220
|
$125.000
|
|
|
|
SP MIXES SP-B SAC-B PG76-22
|
TON
|
61,597.000
|
$126.000
|
$120.000
|
$120.000
|
$119.510
|
$120.000
|
$130.000
|
|
|
|
SP MIXES SP-D SAC-A PG76-22
|
TON
|
61,597.000
|
$128.000
|
$120.000
|
$120.000
|
$116.810
|
$115.000
|
$130.000
|
|
|
|
SP MIXES SP-D SAC-B PG76-22
|
TON
|
45,813.000
|
$140.000
|
$115.000
|
$124.000
|
$116.640
|
$115.000
|
$125.000
|
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
48,026.000
|
$139.000
|
$146.000
|
$136.000
|
$141.290
|
$115.000
|
$160.000
|
|
|
|
PLANE ASPH CONC PAV(1")
|
SY
|
6,602.000
|
$2.500
|
$1.000
|
$12.000
|
$0.760
|
$0.900
|
$0.970
|
|
|
|
PLANE ASPH CONC PAV(2")
|
SY
|
20,505.000
|
$1.000
|
$1.500
|
$3.000
|
$1.490
|
$1.500
|
$1.550
|
|
|
|
FULL - DEPTH REPAIR CRCP (8")
|
CY
|
95.000
|
$300.000
|
$950.000
|
$2,400.000
|
$526.300
|
$1,100.000
|
$1,340.290
|
|
|
|
CUT & RESTORING PAV
|
SY
|
409.000
|
$91.460
|
$75.000
|
$320.000
|
$187.750
|
$99.070
|
$162.060
|
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
1,466.000
|
$75.510
|
$75.000
|
$180.000
|
$163.400
|
$99.070
|
$123.310
|
|
|
|
CUT AND RESTORE PAV (FLEX BASE)
|
SY
|
1,959.000
|
$50.000
|
$45.000
|
$70.000
|
$50.920
|
$110.000
|
$61.730
|
|
|
|
CEM STABIL BKFL
|
CY
|
2,595.000
|
$80.000
|
$70.000
|
$150.000
|
$100.880
|
$130.000
|
$205.330
|
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
66,731.000
|
$7.160
|
$0.100
|
$2.900
|
$0.370
|
$3.500
|
$1.130
|
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
160.000
|
$275.000
|
$288.900
|
$275.000
|
$400.000
|
$400.000
|
$275.000
|
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
2,940.000
|
$290.500
|
$265.000
|
$500.000
|
$223.110
|
$310.000
|
$232.910
|
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
25.000
|
$330.000
|
$698.600
|
$700.000
|
$780.000
|
$730.000
|
$665.000
|
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
26.000
|
$388.400
|
$761.640
|
$725.000
|
$850.000
|
$750.000
|
$725.000
|
|
|
|
DRILL SHAFT (54 IN)
|
LF
|
1,344.000
|
$500.000
|
$550.000
|
$600.000
|
$624.160
|
$600.000
|
$557.940
|
|
|
|
DRILL SHAFT (SIGN MTS) (12 IN)
|
LF
|
64.000
|
$150.000
|
$463.310
|
$155.000
|
$200.000
|
$88.500
|
$155.000
|
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
320.000
|
$235.000
|
$567.180
|
$175.000
|
$325.000
|
$160.000
|
$175.000
|
|
|
|
DRILL SHAFT (SIGN MTS) (54 IN)
|
LF
|
401.000
|
$620.000
|
$861.440
|
$820.000
|
$920.000
|
$880.000
|
$820.000
|
|
|
|
DRILL SHAFT (HIGH MAST POLE) (60 IN)
|
LF
|
404.000
|
$750.000
|
$950.730
|
$910.000
|
$1,100.000
|
$1,000.000
|
$905.000
|
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
168.000
|
$284.300
|
$393.950
|
$375.000
|
$480.000
|
$350.000
|
$375.000
|
|
|
|
CL A CONC (PLUG)
|
EA
|
6.000
|
$2,250.000
|
$5,000.000
|
$5,000.000
|
$4,418.050
|
$1,000.000
|
$3,788.850
|
|
|
|
CL B CONC (MISC)
|
CY
|
63.000
|
$643.410
|
$800.000
|
$3,500.000
|
$903.890
|
$850.000
|
$860.120
|
|
|
|
CL C CONC (ABUT)
|
CY
|
356.400
|
$1,400.000
|
$1,000.000
|
$1,700.000
|
$1,062.140
|
$1,500.000
|
$1,103.540
|
|
|
|
CL C CONC (CAP)
|
CY
|
784.200
|
$1,400.000
|
$1,750.000
|
$1,700.000
|
$1,322.470
|
$1,400.000
|
$999.040
|
|
|
|
CL C CONC (COLUMN)
|
CY
|
390.000
|
$1,300.000
|
$2,300.000
|
$2,200.000
|
$1,189.550
|
$1,400.000
|
$1,277.580
|
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
373.000
|
$750.000
|
$750.000
|
$550.000
|
$870.150
|
$472.000
|
$532.110
|
|
|
|
REINF CONC SLAB
|
SF
|
106,128.000
|
$25.000
|
$19.300
|
$26.000
|
$25.000
|
$31.400
|
$22.130
|
|
|
|
RETAINING WALL (MSE)
|
SF
|
248,133.000
|
$80.000
|
$100.000
|
$115.000
|
$85.000
|
$43.820
|
$44.400
|
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
12,263.870
|
$180.000
|
$221.000
|
$244.000
|
$233.180
|
$280.000
|
$210.310
|
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
1,232.000
|
$480.000
|
$379.000
|
$440.000
|
$423.860
|
$400.000
|
$425.550
|
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
36.000
|
$550.000
|
$389.000
|
$500.000
|
$418.970
|
$450.000
|
$556.450
|
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
138.000
|
$600.000
|
$389.000
|
$450.000
|
$420.230
|
$410.000
|
$633.490
|
|
|
|
RIPRAP (CONC) (CL B) (4 IN)
|
CY
|
8.000
|
$570.000
|
$399.000
|
$500.000
|
$416.070
|
$450.000
|
$3,825.680
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
485.500
|
$591.000
|
$384.000
|
$440.000
|
$475.920
|
$400.000
|
$703.410
|
|
|
|
RIPRAP (MOW STRIP)(5 IN)
|
CY
|
452.000
|
$500.000
|
$391.000
|
$440.000
|
$559.110
|
$400.000
|
$694.640
|
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
5,981.000
|
$220.000
|
$150.000
|
$180.000
|
$172.300
|
$310.000
|
$160.850
|
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
336.000
|
$51.500
|
$90.000
|
$120.000
|
$112.520
|
$130.000
|
$75.000
|
|
|
|
RAIL (TY SSTR)
|
LF
|
18,866.000
|
$50.000
|
$45.000
|
$98.000
|
$55.830
|
$89.000
|
$56.980
|
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
696.000
|
$200.000
|
$200.000
|
$340.000
|
$271.470
|
$370.000
|
$175.560
|
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
3,335.000
|
$359.000
|
$390.000
|
$410.000
|
$340.530
|
$440.000
|
$269.200
|
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
1,235.000
|
$485.000
|
$500.000
|
$540.000
|
$410.870
|
$610.000
|
$319.650
|
|
|
|
CONC BOX CULV (6 FT X 2 FT)
|
LF
|
598.000
|
$725.000
|
$575.000
|
$628.000
|
$495.180
|
$700.000
|
$373.920
|
|
|
|
INLET (COMPL)(PSL)(RC)(4FTX4FT)
|
EA
|
1.000
|
$5,200.000
|
$5,500.000
|
$5,000.000
|
$8,304.650
|
$12,000.000
|
$7,398.200
|
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
2.000
|
$5,250.000
|
$4,800.000
|
$4,200.000
|
$5,566.020
|
$9,300.000
|
$6,186.200
|
|
|
|
INL(CMP)(PAZD-CZ)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
32.000
|
$5,000.000
|
$4,750.000
|
$4,400.000
|
$4,904.510
|
$12,000.000
|
$6,091.220
|
|
|
|
INL(CMP)(PAZD-CZ)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
2.000
|
$6,600.000
|
$5,250.000
|
$5,200.000
|
$6,501.420
|
$15,000.000
|
$7,898.340
|
|
|
|
INLET (COMPL) (TY MSE2)
|
EA
|
55.000
|
$7,700.000
|
$7,500.000
|
$8,000.000
|
$8,422.830
|
$13,000.000
|
$20,169.180
|
|
|
|
HEADWALL (CH - FW - 0) (DIA= 24 IN)
|
EA
|
3.000
|
$8,000.000
|
$15,000.000
|
$6,000.000
|
$3,449.220
|
$19,000.000
|
$13,826.830
|
|
|
|
HEADWALL (CH - FW - 0) (DIA= 30 IN)
|
EA
|
1.000
|
$10,500.000
|
$15,000.000
|
$7,500.000
|
$5,157.760
|
$14,000.000
|
$14,808.840
|
|
|
|
HEADWALL (CH - FW - 45) (DIA= 24 IN)
|
EA
|
5.000
|
$5,420.000
|
$15,000.000
|
$6,000.000
|
$4,754.880
|
$14,000.000
|
$13,506.320
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 18 IN)
|
EA
|
2.000
|
$6,200.000
|
$15,000.000
|
$5,500.000
|
$4,422.690
|
$14,000.000
|
$13,756.070
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$10,250.000
|
$15,000.000
|
$6,800.000
|
$4,481.990
|
$14,000.000
|
$13,756.080
|
|
|
|
WINGWALL (PW - 1) (HW=3 FT)
|
EA
|
5.000
|
$10,000.000
|
$16,000.000
|
$15,000.000
|
$5,165.670
|
$24,000.000
|
$20,673.450
|
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
1.000
|
$14,000.000
|
$17,000.000
|
$15,500.000
|
$7,022.930
|
$20,000.000
|
$21,782.190
|
|
|
|
WINGWALL (SW - 0) (HW=3 FT)
|
EA
|
15.000
|
$12,000.000
|
$16,000.000
|
$14,000.000
|
$4,260.570
|
$24,000.000
|
$20,651.390
|
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(3:1)(C)
|
EA
|
2.000
|
$6,700.000
|
$16,000.000
|
$21,000.000
|
$7,337.330
|
$9,500.000
|
$20,823.210
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$4,287.000
|
$2,000.000
|
$2,100.000
|
$2,110.760
|
$3,400.000
|
$5,438.800
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
104.000
|
$1,400.000
|
$1,000.000
|
$1,200.000
|
$1,700.000
|
$3,400.000
|
$1,772.340
|
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
3.000
|
$1,700.000
|
$1,500.000
|
$2,200.000
|
$3,570.780
|
$3,300.000
|
$1,708.450
|
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
23.000
|
$2,150.000
|
$1,500.000
|
$2,200.000
|
$2,795.940
|
$3,500.000
|
$1,908.790
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
158.000
|
$1,800.000
|
$1,350.000
|
$1,800.000
|
$2,200.000
|
$3,800.000
|
$2,194.590
|
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$2,800.000
|
$3,500.000
|
$28,000.000
|
$4,250.000
|
$5,400.000
|
$3,105.590
|
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$6,000.000
|
$8,500.000
|
$6,500.000
|
$9,836.040
|
$7,100.000
|
$3,044.120
|
|
|
|
REMOV STR (BOX CULVERT)
|
EA
|
80.000
|
$9,750.000
|
$100.000
|
$4,600.000
|
$872.030
|
$74.000
|
$70.020
|
|
|
|
REMOV STR (SET)
|
EA
|
130.000
|
$500.000
|
$225.000
|
$650.000
|
$198.560
|
$3,100.000
|
$544.070
|
|
|
|
REMOV STR (WINGWALL)
|
EA
|
32.000
|
$6,000.000
|
$1,500.000
|
$2,500.000
|
$2,972.500
|
$3,100.000
|
$1,251.390
|
|
|
|
REMOV STR (PIPE)
|
LF
|
50,973.000
|
$17.770
|
$8.500
|
$22.000
|
$12.940
|
$23.500
|
$10.250
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$17,437,375.260
|
$16,900,000.000
|
$17,930,000.000
|
$17,001,431.070
|
$20,996,420.870
|
$20,000,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
40.000
|
$19,800.000
|
$5,000.000
|
$15,000.000
|
$19,664.990
|
$31,000.000
|
$75,000.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$12,000.000
|
$17,500.000
|
$20,000.000
|
$13,954.070
|
$31,000.000
|
$16,722.920
|
|
|
|
TMA (STATIONARY)
|
DAY
|
576.000
|
$68.510
|
$0.100
|
$200.000
|
$71.710
|
$310.000
|
$319.590
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
576.000
|
$350.000
|
$1.000
|
$100.000
|
$379.400
|
$1,300.000
|
$695.880
|
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
15,988.000
|
$24.000
|
$15.000
|
$12.000
|
$40.000
|
$51.500
|
$60.000
|
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
15,988.000
|
$25.500
|
$1.000
|
$8.000
|
$15.000
|
$13.500
|
$10.000
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
18,984.000
|
$4.250
|
$4.250
|
$4.000
|
$4.250
|
$4.500
|
$3.000
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
18,984.000
|
$1.430
|
$1.250
|
$1.500
|
$1.250
|
$1.500
|
$1.000
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
19,844.000
|
$6.000
|
$5.250
|
$6.000
|
$5.250
|
$5.500
|
$5.150
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
19,844.000
|
$1.800
|
$1.250
|
$1.400
|
$1.250
|
$1.500
|
$1.000
|
|
|
|
CONSTRUCTING DETOURS
|
SY
|
62,446.000
|
$46.000
|
$45.000
|
$60.000
|
$67.370
|
$60.500
|
$105.720
|
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
34,700.000
|
$40.000
|
$50.000
|
$82.000
|
$51.500
|
$100.000
|
$41.420
|
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
2,640.000
|
$40.000
|
$60.000
|
$75.000
|
$49.170
|
$110.000
|
$39.330
|
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
36,600.000
|
$7.000
|
$7.000
|
$9.000
|
$6.920
|
$13.000
|
$11.150
|
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
700.000
|
$9.000
|
$7.000
|
$9.000
|
$14.470
|
$30.000
|
$11.150
|
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
34,700.000
|
$10.000
|
$8.000
|
$7.000
|
$6.680
|
$11.500
|
$12.090
|
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
2,640.000
|
$10.000
|
$8.000
|
$7.000
|
$6.680
|
$11.500
|
$11.580
|
|
|
|
PCTB (FUR&INST)(F-SHAPE OR SNGL SLP)TY1
|
LF
|
44,160.000
|
$25.000
|
$38.000
|
$50.000
|
$46.430
|
$88.000
|
$38.080
|
|
|
|
PCTB (MOVE)(F-SHAPE OR SNGL SLP)TY1
|
LF
|
44,700.000
|
$15.000
|
$7.000
|
$9.000
|
$6.340
|
$8.500
|
$5.080
|
|
|
|
PCTB (REMOVE)(F-SHAPE OR SNGL SLP)TY1
|
LF
|
44,160.000
|
$10.000
|
$7.000
|
$9.000
|
$6.680
|
$17.500
|
$9.790
|
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
35,801.100
|
$65.000
|
$60.000
|
$75.000
|
$78.030
|
$85.000
|
$78.690
|
|
|
|
PERM CTB (TRAN SSCB TO SSTR) (MOD)
|
LF
|
40.000
|
$634.000
|
$250.000
|
$900.000
|
$224.630
|
$230.000
|
$314.540
|
|
|
|
LANDSCAPE PAVERS
|
SY
|
9,042.000
|
$90.000
|
$95.500
|
$100.000
|
$69.390
|
$69.500
|
$101.150
|
|
|
|
CONC CURB (TY II)
|
LF
|
1,962.000
|
$4.000
|
$15.500
|
$18.000
|
$15.500
|
$16.000
|
$8.640
|
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
2,685.000
|
$35.000
|
$15.500
|
$18.000
|
$15.500
|
$16.000
|
$46.690
|
|
|
|
CONC CURB (DOWELED)
|
LF
|
80.000
|
$60.000
|
$17.000
|
$19.000
|
$17.000
|
$17.000
|
$21.300
|
|
|
|
INTERSECTIONS (ACP)
|
SY
|
2,329.000
|
$46.000
|
$95.000
|
$132.000
|
$118.930
|
$63.500
|
$160.340
|
|
|
|
DRIVEWAYS (CONC)
|
SY
|
334.200
|
$97.500
|
$100.000
|
$61.000
|
$55.000
|
$55.000
|
$141.550
|
|
|
|
DRIVEWAYS (ACP)
|
SY
|
28,929.000
|
$50.000
|
$57.000
|
$37.000
|
$28.780
|
$98.500
|
$71.260
|
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
331,340.000
|
$0.350
|
$0.100
|
$0.300
|
$0.120
|
$0.180
|
$0.130
|
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
7,937.500
|
$28.240
|
$29.490
|
$28.000
|
$23.800
|
$27.500
|
$25.750
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
7.000
|
$2,500.000
|
$2,249.210
|
$2,900.000
|
$2,840.000
|
$2,200.000
|
$2,100.000
|
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
39.000
|
$1,490.210
|
$2,149.210
|
$1,260.000
|
$1,690.000
|
$1,300.000
|
$1,190.000
|
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
100.000
|
$36.000
|
$1,749.210
|
$1,500.000
|
$1,250.000
|
$1,500.000
|
$1,405.000
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,552.000
|
$3.500
|
$2.490
|
$2.000
|
$3.000
|
$2.000
|
$2.000
|
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$750.000
|
$195.490
|
$230.000
|
$375.000
|
$230.000
|
$215.000
|
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
2.000
|
$195.500
|
$195.490
|
$240.000
|
$375.000
|
$240.000
|
$230.000
|
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
5.000
|
$222.610
|
$249.210
|
$270.000
|
$275.000
|
$270.000
|
$255.000
|
|
|
|
CABLE BARRIER (REMOVE)
|
LF
|
2,370.000
|
$4.250
|
$5.490
|
$4.000
|
$5.250
|
$4.000
|
$3.800
|
|
|
|
CABLE BARRIER TERMINAL SECTION (REMOVE)
|
EA
|
2.000
|
$470.000
|
$549.210
|
$500.000
|
$575.000
|
$510.000
|
$480.000
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
40.000
|
$3,500.000
|
$3,549.210
|
$3,100.000
|
$3,550.000
|
$3,100.000
|
$2,925.000
|
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
23.000
|
$737.500
|
$1,949.210
|
$1,600.000
|
$1,275.000
|
$1,600.000
|
$1,490.000
|
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
32.000
|
$655.000
|
$749.210
|
$850.000
|
$1,000.000
|
$850.000
|
$800.000
|
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
6.000
|
$28,000.000
|
$32,749.210
|
$33,000.000
|
$39,766.880
|
$33,000.000
|
$31,350.000
|
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
32.000
|
$11,500.000
|
$9,149.210
|
$8,100.000
|
$10,797.290
|
$8,100.000
|
$7,625.000
|
|
|
|
CHAIN LINK FENCE (REMOVE)
|
LF
|
4,169.000
|
$7.500
|
$5.490
|
$4.000
|
$5.490
|
$10.000
|
$9.500
|
|
|
|
WIRE FENCE (REMOVE)
|
LF
|
23,450.000
|
$5.000
|
$1.000
|
$2.000
|
$5.490
|
$8.000
|
$7.500
|
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
43.000
|
$303.750
|
$249.210
|
$300.000
|
$275.000
|
$330.000
|
$310.000
|
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
10.000
|
$350.000
|
$349.210
|
$350.000
|
$325.000
|
$460.000
|
$435.000
|
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
2.000
|
$875.000
|
$749.210
|
$900.000
|
$850.000
|
$1,200.000
|
$1,125.000
|
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
47.000
|
$410.450
|
$892.950
|
$900.000
|
$390.000
|
$470.000
|
$850.000
|
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
24.000
|
$1,365.000
|
$1,423.470
|
$1,500.000
|
$2,300.000
|
$1,200.000
|
$1,355.000
|
|
|
|
IN RD IL (TY SP) 38S-12-12(250W EQ)LED
|
EA
|
7.000
|
$4,500.000
|
$6,775.940
|
$6,900.000
|
$12,800.000
|
$6,700.000
|
$6,450.000
|
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
4.000
|
$4,625.000
|
$4,853.470
|
$4,900.000
|
$4,400.000
|
$4,800.000
|
$4,620.000
|
|
|
|
IN RD IL (TY SA) 40T-12 (250W EQ) LED
|
EA
|
16.000
|
$4,000.000
|
$4,911.250
|
$5,000.000
|
$4,500.000
|
$5,100.000
|
$4,675.000
|
|
|
|
HI MST IL POLE (150 FT)(100 MPH)
|
EA
|
16.000
|
$51,000.000
|
$82,099.210
|
$83,000.000
|
$68,000.000
|
$64,000.000
|
$78,150.000
|
|
|
|
LED HI MST IL ASM (6 FIXT) (TY B)
|
EA
|
16.000
|
$39,485.000
|
$46,948.350
|
$47,000.000
|
$43,100.000
|
$67,000.000
|
$44,690.000
|
|
|
|
REPLC LED HI MST IL(6 FIXT) (TY B)
|
EA
|
2.000
|
$9,000.000
|
$8,982.070
|
$9,030.000
|
$7,900.000
|
$7,700.000
|
$8,550.000
|
|
|
|
TEMP RD IL SETUP AND REMOVE
|
EA
|
8.000
|
$6,350.000
|
$11,030.600
|
$11,000.000
|
$7,600.000
|
$8,000.000
|
$10,500.000
|
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
22,240.000
|
$15.350
|
$10.510
|
$11.000
|
$14.000
|
$14.500
|
$10.000
|
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
37,962.000
|
$29.750
|
$22.060
|
$22.000
|
$38.000
|
$20.000
|
$21.000
|
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
1,485.000
|
$10.440
|
$10.510
|
$11.000
|
$12.000
|
$15.500
|
$10.000
|
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
1,445.000
|
$29.500
|
$27.310
|
$28.000
|
$48.000
|
$32.500
|
$26.000
|
|
|
|
CONDT (PVC) (SCH 80) (4")
|
LF
|
2,888.000
|
$33.500
|
$24.160
|
$25.000
|
$50.000
|
$28.000
|
$23.000
|
|
|
|
CONDT (PVC) (SCH 80) (4") (BORE)
|
LF
|
1,170.000
|
$43.000
|
$47.270
|
$48.000
|
$56.000
|
$41.500
|
$45.000
|
|
|
|
FIBER OPTIC CABLE ROAD MARKER
|
LF
|
123.000
|
$226.000
|
$31.520
|
$32.000
|
$180.000
|
$250.000
|
$30.000
|
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
42,100.000
|
$0.800
|
$1.470
|
$1.500
|
$1.200
|
$1.500
|
$1.400
|
|
|
|
ELEC CONDR (NO.10) INSULATED
|
LF
|
324.000
|
$1.700
|
$2.000
|
$2.000
|
$2.100
|
$1.500
|
$1.900
|
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
775.000
|
$1.880
|
$2.100
|
$2.000
|
$3.650
|
$2.000
|
$2.000
|
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
39,624.000
|
$1.650
|
$1.680
|
$1.700
|
$1.900
|
$2.500
|
$1.600
|
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
90.000
|
$1.760
|
$2.210
|
$2.200
|
$4.000
|
$2.000
|
$2.100
|
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
120.000
|
$2.300
|
$2.310
|
$2.300
|
$4.100
|
$2.500
|
$2.200
|
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
495.000
|
$2.600
|
$3.050
|
$3.000
|
$2.800
|
$3.500
|
$2.900
|
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
990.000
|
$3.000
|
$3.260
|
$3.300
|
$3.300
|
$3.500
|
$3.100
|
|
|
|
ELEC CONDR (NO.2) BARE
|
LF
|
1,365.000
|
$3.430
|
$3.680
|
$3.700
|
$3.900
|
$4.500
|
$3.500
|
|
|
|
ELEC CONDR (NO.2) INSULATED
|
LF
|
3,235.000
|
$4.000
|
$4.100
|
$4.000
|
$4.400
|
$5.000
|
$3.900
|
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
637.000
|
$3.460
|
$2.730
|
$2.750
|
$4.550
|
$4.500
|
$2.600
|
|
|
|
ITS GND BOX(PCAST) TY 1 (243648)W/APRN
|
EA
|
123.000
|
$5,000.000
|
$6,565.840
|
$6,600.000
|
$7,100.000
|
$6,100.000
|
$6,250.000
|
|
|
|
ITS GND BOX(PCAST) TY 2 (366048)W/APRN
|
EA
|
5.000
|
$11,600.000
|
$9,706.930
|
$9,800.000
|
$12,700.000
|
$9,100.000
|
$9,240.000
|
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
128.000
|
$928.000
|
$1,418.220
|
$1,430.000
|
$1,700.000
|
$1,500.000
|
$1,350.000
|
|
|
|
REMOVE GROUND BOX
|
EA
|
18.000
|
$350.000
|
$682.850
|
$690.000
|
$170.000
|
$520.000
|
$650.000
|
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
3.000
|
$241.110
|
$325.670
|
$330.000
|
$640.000
|
$1,600.000
|
$310.000
|
|
|
|
ELC SRV TY A 240/480 060(SS)SS(E)TP(O)
|
EA
|
18.000
|
$8,000.000
|
$6,581.590
|
$6,600.000
|
$10,700.000
|
$9,000.000
|
$6,265.000
|
|
|
|
ELC SRV TY D 120/240 060(NS)SS(N)TP(O)
|
EA
|
4.000
|
$8,000.000
|
$4,491.030
|
$4,500.000
|
$8,300.000
|
$7,900.000
|
$4,275.000
|
|
|
|
ELC SRV TY T 120/240 000(NS)GS(L)TS(O)
|
EA
|
1.000
|
$2,495.000
|
$1,943.490
|
$1,950.000
|
$5,400.000
|
$4,100.000
|
$1,850.000
|
|
|
|
ELC SRV TY T 120/240 000(NS)GS(N)TP(O)
|
EA
|
2.000
|
$4,000.000
|
$2,258.650
|
$2,270.000
|
$7,200.000
|
$6,900.000
|
$2,150.000
|
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
81.000
|
$30.000
|
$35.490
|
$60.000
|
$37.000
|
$19.000
|
$18.000
|
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
2,739.000
|
$26.000
|
$28.280
|
$30.000
|
$29.000
|
$28.500
|
$28.000
|
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
1,759.000
|
$23.500
|
$46.190
|
$33.000
|
$27.000
|
$24.500
|
$44.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
118.000
|
$750.000
|
$775.490
|
$920.000
|
$875.000
|
$770.000
|
$720.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
109.000
|
$821.490
|
$879.490
|
$1,135.000
|
$1,075.000
|
$940.000
|
$882.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
1.000
|
$925.000
|
$1,335.000
|
$1,425.000
|
$1,350.000
|
$1,300.000
|
$1,210.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
|
EA
|
2.000
|
$975.000
|
$1,192.490
|
$1,700.000
|
$1,600.000
|
$1,400.000
|
$1,320.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(P)
|
EA
|
3.000
|
$731.000
|
$898.490
|
$1,600.000
|
$1,525.000
|
$760.000
|
$715.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(T)
|
EA
|
4.000
|
$825.000
|
$1,398.490
|
$1,100.000
|
$1,050.000
|
$1,100.000
|
$1,040.000
|
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
12.000
|
$2,462.500
|
$3,211.490
|
$2,270.000
|
$2,150.000
|
$2,100.000
|
$2,020.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
234.000
|
$132.500
|
$49.210
|
$80.000
|
$75.000
|
$96.000
|
$90.000
|
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
20,480.000
|
$5.350
|
$5.560
|
$6.000
|
$5.000
|
$6.000
|
$5.500
|
|
|
|
REMOVE LRSA
|
EA
|
7.000
|
$1,400.000
|
$631.310
|
$660.000
|
$840.000
|
$770.000
|
$625.000
|
|
|
|
INS OH SN SUP(35 FT BAL TEE)
|
EA
|
2.000
|
$48,750.000
|
$76,531.390
|
$77,000.000
|
$50,300.000
|
$62,000.000
|
$72,850.000
|
|
|
|
INS OH SN SUP(35 FT CANT)
|
EA
|
13.000
|
$45,000.000
|
$79,262.770
|
$80,000.000
|
$61,100.000
|
$53,000.000
|
$75,450.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
13.000
|
$60.000
|
$49.210
|
$85.000
|
$49.210
|
$46.000
|
$43.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
|
EA
|
30.000
|
$14.500
|
$19.490
|
$24.000
|
$19.490
|
$23.500
|
$22.000
|
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(YFLX)GND
|
EA
|
36.000
|
$75.150
|
$49.210
|
$85.000
|
$49.210
|
$71.500
|
$67.000
|
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
|
EA
|
14.000
|
$14.500
|
$19.490
|
$19.000
|
$19.490
|
$23.500
|
$22.000
|
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BI)
|
EA
|
350.000
|
$20.500
|
$19.490
|
$24.000
|
$19.490
|
$24.000
|
$22.750
|
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
|
EA
|
54.000
|
$50.000
|
$49.210
|
$90.000
|
$49.210
|
$72.500
|
$68.000
|
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
|
EA
|
138.000
|
$10.500
|
$24.490
|
$64.000
|
$24.490
|
$30.000
|
$28.000
|
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
46.000
|
$62.500
|
$49.210
|
$58.000
|
$49.210
|
$61.500
|
$58.000
|
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
103.000
|
$17.250
|
$9.490
|
$24.000
|
$9.490
|
$16.000
|
$15.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
22,624.000
|
$0.650
|
$0.380
|
$0.400
|
$0.380
|
$1.000
|
$0.380
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(DOT)
|
LF
|
1,220.000
|
$0.190
|
$0.380
|
$0.400
|
$0.380
|
$0.950
|
$0.380
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
125,425.000
|
$0.400
|
$0.380
|
$0.400
|
$0.380
|
$0.380
|
$0.380
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
27,264.600
|
$1.200
|
$0.580
|
$0.600
|
$0.580
|
$1.000
|
$0.580
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
141,014.200
|
$0.580
|
$0.380
|
$0.400
|
$0.380
|
$0.380
|
$0.380
|
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
17,472.800
|
$0.550
|
$0.720
|
$0.800
|
$0.720
|
$1.000
|
$0.720
|
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
161,358.100
|
$0.320
|
$0.380
|
$0.400
|
$0.380
|
$0.380
|
$0.380
|
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
16,747.400
|
$0.480
|
$0.480
|
$0.500
|
$0.480
|
$2.500
|
$0.480
|
|
|
|
WK ZN PAV MRK REMOV (W)12"(DOT)
|
LF
|
570.000
|
$4.500
|
$3.500
|
$4.000
|
$3.500
|
$3.500
|
$3.500
|
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
150,272.900
|
$0.320
|
$0.380
|
$0.400
|
$0.380
|
$0.380
|
$0.380
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
20,688.000
|
$1.700
|
$1.340
|
$1.400
|
$2.250
|
$2.500
|
$1.050
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
8,546.000
|
$1.250
|
$1.440
|
$1.400
|
$2.250
|
$2.000
|
$0.940
|
|
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
361.000
|
$3.060
|
$0.680
|
$0.700
|
$0.680
|
$2.000
|
$0.680
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
6,818.000
|
$1.220
|
$0.880
|
$1.000
|
$0.880
|
$2.000
|
$1.250
|
|
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
1,388.000
|
$4.270
|
$1.100
|
$1.200
|
$1.100
|
$3.500
|
$1.100
|
|
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
2,400.000
|
$3.880
|
$1.100
|
$1.200
|
$1.100
|
$4.500
|
$1.100
|
|
|
|
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
|
EA
|
16.000
|
$1,500.000
|
$1,500.000
|
$1,580.000
|
$1,500.000
|
$1,400.000
|
$1,500.000
|
|
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
16.000
|
$1,500.000
|
$1,500.000
|
$1,580.000
|
$1,500.000
|
$1,400.000
|
$1,500.000
|
|
|
|
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
|
LF
|
5,433.000
|
$2.450
|
$0.940
|
$1.000
|
$0.940
|
$2.000
|
$0.940
|
|
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
698.000
|
$3.500
|
$1.100
|
$1.200
|
$1.100
|
$6.000
|
$1.100
|
|
|
|
RE PM TY I (W)6"(BRK)(090MIL)(CALLOUT)
|
LF
|
35,646.000
|
$0.620
|
$0.880
|
$0.950
|
$0.880
|
$0.880
|
$0.880
|
|
|
|
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
|
LF
|
166,569.000
|
$0.650
|
$0.920
|
$1.000
|
$0.920
|
$0.920
|
$0.920
|
|
|
|
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
|
LF
|
164,771.000
|
$0.820
|
$0.920
|
$1.000
|
$0.920
|
$0.920
|
$0.920
|
|
|
|
PAVEMENT SLER 6"
|
LF
|
38,807.000
|
$0.950
|
$0.420
|
$0.450
|
$0.420
|
$0.750
|
$0.420
|
|
|
|
PAVEMENT SLER 8"
|
LF
|
2,724.000
|
$1.560
|
$1.100
|
$1.100
|
$1.100
|
$1.500
|
$1.100
|
|
|
|
PAVEMENT SLER 12"
|
LF
|
698.000
|
$1.000
|
$2.000
|
$2.000
|
$2.000
|
$1.000
|
$2.000
|
|
|
|
PAVEMENT SLER 24"
|
LF
|
457.000
|
$4.000
|
$2.500
|
$2.600
|
$2.500
|
$4.000
|
$2.500
|
|
|
|
PAVEMENT SLER (ARROW)
|
EA
|
14.000
|
$15.000
|
$20.000
|
$21.000
|
$20.000
|
$49.500
|
$20.000
|
|
|
|
PAVEMENT SLER (WORD)
|
EA
|
8.000
|
$15.000
|
$25.000
|
$27.000
|
$25.000
|
$25.000
|
$25.000
|
|
|
|
PAVEMENT SLER (UTURN ARROW)
|
EA
|
22.000
|
$90.000
|
$25.000
|
$27.000
|
$25.000
|
$43.500
|
$25.000
|
|
|
|
PREFAB PM TY B (W)(6")(BRK)CONTRAST
|
LF
|
1,110.000
|
$9.000
|
$20.000
|
$21.000
|
$20.000
|
$12.000
|
$20.000
|
|
|
|
PREFAB PM TY C (W)(24")(SLD)
|
LF
|
726.000
|
$18.000
|
$16.000
|
$17.000
|
$16.000
|
$18.000
|
$16.000
|
|
|
|
PREFAB PM TY C (W)(ARROW)
|
EA
|
35.000
|
$225.000
|
$185.000
|
$195.000
|
$185.000
|
$260.000
|
$185.000
|
|
|
|
PREFAB PM TY C (W)(UTURN ARROW)
|
EA
|
21.000
|
$500.000
|
$325.000
|
$340.000
|
$325.000
|
$420.000
|
$325.000
|
|
|
|
PREFAB PM TY C (W)(NUMBER)
|
EA
|
8.000
|
$336.000
|
$325.000
|
$340.000
|
$325.000
|
$270.000
|
$325.000
|
|
|
|
PREFAB PM TY C (W)(WORD)
|
EA
|
54.000
|
$285.000
|
$275.000
|
$290.000
|
$275.000
|
$320.000
|
$275.000
|
|
|
|
PREFAB PM TY C (W)(36")(YLD TRI)
|
EA
|
54.000
|
$48.780
|
$35.000
|
$37.000
|
$35.000
|
$52.500
|
$35.000
|
|
|
|
REFL PAV MRKR TY I-A
|
EA
|
276.000
|
$6.750
|
$7.500
|
$8.000
|
$7.500
|
$8.500
|
$7.500
|
|
|
|
REFL PAV MRKR TY I-C
|
EA
|
102.000
|
$5.000
|
$7.500
|
$8.000
|
$7.500
|
$7.000
|
$7.500
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
441.000
|
$5.850
|
$7.500
|
$8.000
|
$7.500
|
$8.000
|
$7.500
|
|
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
4,495.000
|
$6.700
|
$5.000
|
$5.000
|
$5.000
|
$5.000
|
$5.000
|
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
73,302.100
|
$0.350
|
$0.350
|
$0.400
|
$0.350
|
$1.000
|
$0.350
|
|
|
|
ELIM EXT PM & MRKS (8")
|
LF
|
2,725.000
|
$0.850
|
$0.650
|
$0.700
|
$0.650
|
$2.000
|
$0.650
|
|
|
|
ELIM EXT PM & MRKS (12")
|
LF
|
1,250.000
|
$1.000
|
$0.850
|
$1.000
|
$0.850
|
$3.000
|
$0.850
|
|
|
|
ELIM EXT PM & MRKS (24")
|
LF
|
695.000
|
$6.700
|
$5.000
|
$5.000
|
$5.000
|
$6.500
|
$5.000
|
|
|
|
ELIM EXT PM & MRKS (ARROW)
|
EA
|
25.000
|
$200.000
|
$50.000
|
$53.000
|
$50.000
|
$110.000
|
$50.000
|
|
|
|
ELIM EXT PM & MRKS (WORD)
|
EA
|
15.000
|
$225.000
|
$50.000
|
$53.000
|
$50.000
|
$110.000
|
$50.000
|
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
38,807.000
|
$0.200
|
$0.200
|
$0.200
|
$0.200
|
$0.550
|
$0.200
|
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
2,724.000
|
$0.570
|
$0.300
|
$0.300
|
$0.300
|
$0.650
|
$0.300
|
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
698.000
|
$1.350
|
$0.600
|
$0.600
|
$0.600
|
$0.600
|
$0.600
|
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
457.000
|
$2.700
|
$1.000
|
$1.060
|
$1.000
|
$2.000
|
$1.000
|
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
14.000
|
$50.000
|
$50.000
|
$53.000
|
$50.000
|
$37.000
|
$50.000
|
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
8.000
|
$40.000
|
$50.000
|
$53.000
|
$50.000
|
$24.500
|
$50.000
|
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
22.000
|
$50.000
|
$50.000
|
$53.000
|
$50.000
|
$41.000
|
$50.000
|
|
|
|
INSTALL HWY TRF SIG (FLASH BEACON)
|
EA
|
3.000
|
$2,500.000
|
$2,573.810
|
$2,600.000
|
$5,900.000
|
$17,000.000
|
$2,450.000
|
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
12.000
|
$193.000
|
$330.920
|
$330.000
|
$490.000
|
$290.000
|
$315.000
|
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
18.000
|
$290.000
|
$330.920
|
$330.000
|
$490.000
|
$290.000
|
$315.000
|
|
|
|
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
|
LF
|
1,515.000
|
$2.830
|
$2.890
|
$3.000
|
$4.050
|
$3.000
|
$2.750
|
|
|
|
REMOVE RDSD FLASH BEACON ASSEMBLY
|
EA
|
1.000
|
$1,177.000
|
$1,575.800
|
$1,600.000
|
$2,700.000
|
$740.000
|
$1,500.000
|
|
|
|
INS TRF SIG PL AM (S)STR(TY D)
|
EA
|
8.000
|
$8,172.000
|
$8,824.480
|
$8,900.000
|
$11,000.000
|
$11,000.000
|
$8,400.000
|
|
|
|
INS TRF SIG PL AM (S)STR(TY D)LUM
|
EA
|
4.000
|
$10,783.000
|
$12,448.830
|
$12,500.000
|
$11,900.000
|
$12,000.000
|
$11,850.000
|
|
|
|
REMOVE CONDUCTOR
|
LF
|
8,449.000
|
$1.150
|
$1.890
|
$2.000
|
$1.050
|
$0.750
|
$1.800
|
|
|
|
FULL - WIDTH MOWING
|
AC
|
72.000
|
$80.000
|
$350.000
|
$370.000
|
$820.730
|
$190.000
|
$326.240
|
|
|
|
LITTER REMOVAL
|
CYC
|
6.000
|
$3,500.000
|
$3,000.000
|
$10,600.000
|
$371.290
|
$2,300.000
|
$3,729.100
|
|
|
|
BRIDGE JOINT REPAIR (ARMOR)
|
LF
|
336.000
|
$1,000.000
|
$150.000
|
$37.000
|
$38.310
|
$90.000
|
$162.170
|
|
|
|
BONDING COURSE
|
GAL
|
135,750.000
|
$5.000
|
$3.000
|
$3.000
|
$8.110
|
$3.720
|
$3.000
|
|
|
|
BIRD EXCLUSION METHOD
|
SF
|
155,250.000
|
$10.000
|
$1.000
|
$5.000
|
$1.750
|
$5.030
|
$1.750
|
|
|
|
INSTALL DMS (POLE MTD CABINET)
|
EA
|
2.000
|
$13,700.000
|
$1,943.490
|
$2,000.000
|
$13,300.000
|
$23,000.000
|
$1,850.000
|
|
|
|
ITS POLE MNT CAB (TY 2) (CONF 2)
|
EA
|
2.000
|
$6,000.000
|
$5,840.970
|
$5,800.000
|
$5,600.000
|
$8,200.000
|
$5,560.000
|
|
|
|
ITS POLE(40 FT)(110 MPH)(W/STIFF)
|
EA
|
1.000
|
$14,000.000
|
$13,289.250
|
$13,400.000
|
$14,100.000
|
$14,000.000
|
$12,650.000
|
|
|
|
ITS POLE(55 FT)(140 MPH)(W/STIFF)
|
EA
|
1.000
|
$19,750.000
|
$24,004.700
|
$24,000.000
|
$29,000.000
|
$23,000.000
|
$22,850.000
|
|
|
|
INSTALLATION OF CELLULAR MODEM
|
EA
|
4.000
|
$2,000.000
|
$787.900
|
$790.000
|
$600.000
|
$1,100.000
|
$750.000
|
|
|
|
CCTV FIELD EQUIPMENT (DIGITAL)
|
EA
|
2.000
|
$9,150.000
|
$8,714.180
|
$8,800.000
|
$9,000.000
|
$6,500.000
|
$8,295.000
|
|
|
|
ITS COM CBL (ETHERNET)
|
LF
|
155.000
|
$3.400
|
$3.360
|
$3.300
|
$3.000
|
$6.500
|
$3.200
|
|
|
|
REMOVE HIGH MAST LIGHTING ASSEMBLY
|
EA
|
1.000
|
$15,300.000
|
$22,586.480
|
$22,700.000
|
$11,900.000
|
$18,000.000
|
$21,500.000
|
|
|
|
FO SPLICE ENCLOSURE (TYPE 2)
|
EA
|
5.000
|
$2,500.000
|
$2,468.750
|
$2,500.000
|
$1,100.000
|
$1,400.000
|
$2,350.000
|
|
|
|
ITS SYSTEM SUPPORT EQUIPMENT
|
LS
|
1.000
|
$31,331.300
|
$19,434.870
|
$19,500.000
|
$68,400.000
|
$31,000.000
|
$18,500.000
|
|
|
|
16IN STEEL CASING (OPEN CUT)
|
LF
|
310.000
|
$180.000
|
$175.000
|
$185.000
|
$504.240
|
$180.410
|
$169.060
|
|
|
|
24IN STEEL CASING (OPEN CUT)
|
LF
|
72.000
|
$200.000
|
$275.000
|
$215.000
|
$736.080
|
$330.000
|
$256.150
|
|
|
|
BLOW OFF VALVE (2IN)
|
EA
|
33.000
|
$6,500.000
|
$3,000.000
|
$2,200.000
|
$3,013.870
|
$2,154.160
|
$3,436.790
|
|
|
|
CONNECT TO EXISTING WATER LINE
|
EA
|
15.000
|
$4,000.000
|
$2,500.000
|
$3,000.000
|
$13,910.180
|
$45,000.000
|
$6,198.860
|
|
|
|
CUTTING AND CAPPING ABANDONED WATERLINE
|
EA
|
15.000
|
$1,966.350
|
$1,500.000
|
$1,000.000
|
$1,506.940
|
$1,454.060
|
$922.140
|
|
|
|
FIRE HYDRANT ASSEMBLY
|
EA
|
37.000
|
$6,500.000
|
$8,500.000
|
$9,600.000
|
$9,853.040
|
$9,100.000
|
$12,638.490
|
|
|
|
GATE VALVE WBOX (8IN)
|
EA
|
52.000
|
$4,500.000
|
$2,900.000
|
$3,400.000
|
$5,564.070
|
$3,500.000
|
$3,760.300
|
|
|
|
GATE VALVE WBOX (12IN)
|
EA
|
24.000
|
$7,012.500
|
$5,500.000
|
$5,500.000
|
$7,534.680
|
$6,600.000
|
$7,078.990
|
|
|
|
JCK TUN BOR OR AUG CSG (STL) (24IN)
|
LF
|
1,786.000
|
$505.070
|
$375.000
|
$560.000
|
$123.920
|
$680.000
|
$491.810
|
|
|
|
SERVICE LINE (LONG SIDE) (1-1/2IN TO 2)
|
EA
|
1.000
|
$4,799.010
|
$17,000.000
|
$2,500.000
|
$13,910.180
|
$6,900.000
|
$10,627.270
|
|
|
|
SERVICE LINE (SHRT SIDE) (1-1/2IN TO 2)
|
EA
|
77.000
|
$2,074.710
|
$2,500.000
|
$1,700.000
|
$1,159.180
|
$3,300.000
|
$6,268.280
|
|
|
|
WATER MAIN PIPE (PVC)(8IN)(DR18)(C900)
|
LF
|
47,237.000
|
$73.830
|
$37.000
|
$56.000
|
$98.530
|
$60.320
|
$57.790
|
|
|
|
WATER MAIN PIPE (PVC)(12IN)(DR18)(C900)
|
LF
|
16,072.000
|
$132.090
|
$65.000
|
$86.000
|
$133.540
|
$86.170
|
$112.450
|
|
|
|
WET CONNECTION
|
EA
|
3.000
|
$5,000.000
|
$8,500.000
|
$14,600.000
|
$13,910.180
|
$5,181.830
|
$3,822.030
|
|
|
|
CONNECT TO EXIST. WATER METER
|
EA
|
20.000
|
$2,196.000
|
$1,500.000
|
$3,600.000
|
$2,782.040
|
$5,127.980
|
$357.840
|
|
|
|
REMOV & RELOCATE WATER METER AND VAULT
|
EA
|
63.000
|
$2,530.280
|
$3,500.000
|
$3,780.000
|
$4,404.890
|
$3,300.000
|
$3,278.730
|
|
|
|
REMOV ASBESTOS CEMENT WATERLINE
|
LF
|
15,053.000
|
$30.000
|
$15.950
|
$30.000
|
$24.790
|
$55.500
|
$20.490
|
|
|
|
WATER MAIN PIPE (PVC)(2IN)(DR18)(C900)
|
LF
|
26.000
|
$50.000
|
$225.000
|
$85.000
|
$115.920
|
$19.390
|
$49.180
|
|
1
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
2,234.000
|
$90.000
|
$0.000
|
$67.000
|
$80.000
|
$82.000
|
$92.730
|
|
1
|
|
RC PIPE (CL V)(18 IN)
|
LF
|
232.000
|
$130.000
|
$0.000
|
$82.000
|
$136.720
|
$99.500
|
$98.380
|
|
1A
|
|
THERMOPLASTIC PIPE (PP) (18")
|
LF
|
2,466.000
|
$93.760
|
$85.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
2
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
7,088.000
|
$195.000
|
$0.000
|
$84.000
|
$95.000
|
$0.000
|
$114.320
|
|
2
|
|
RC PIPE (CL V)(24 IN)
|
LF
|
168.000
|
$139.980
|
$0.000
|
$102.000
|
$155.220
|
$0.000
|
$155.080
|
|
2A
|
|
THERMOPLASTIC PIPE (PP) (24")
|
LF
|
7,256.000
|
$193.730
|
$80.000
|
$0.000
|
$0.000
|
$86.110
|
$0.000
|
|
3
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
561.000
|
$215.000
|
$0.000
|
$114.000
|
$135.000
|
$0.000
|
$133.950
|
|
3A
|
|
THERMOPLASTIC PIPE (PP) (30")
|
LF
|
561.000
|
$215.000
|
$105.000
|
$0.000
|
$0.000
|
$112.010
|
$0.000
|
|
4
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
72.000
|
$200.000
|
$0.000
|
$158.000
|
$0.000
|
$0.000
|
$199.040
|
|
4A
|
|
THERMOPLASTIC PIPE (PP) (36")
|
LF
|
72.000
|
$200.000
|
$200.000
|
$0.000
|
$360.850
|
$207.340
|
$0.000
|
|
Totals: |
$193,257,503.617
|
$165,009,688.837
|
$181,902,234.730
|
$185,937,509.976
|
$208,937,421.226
|
$218,012,008.828
|