Show Job Controls
Bid Cobra

HENDERSON SH0031 (6343-87-001)

Items: 49

County: HENDERSON
Length: N/A
Highway: SH0031
District: TYLER
Control Number: 6343-87-001
DBE Goal: N/A
Project: RMC - 634387001
Guaranty: N/A
Time: 730 W
Engineer's Estimate: $158,864.50
Date: 06/11/2019 (7 years ago)
Contract Number: N/A
Type: GUARDRAIL REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (1)
E
Engineer's Estimate
$158,864.50
1
$198,135.00
Over/Under Est: 24.72% $39,270.50

Bid Items & Bid Tabulations

49 Total 0 of 49
HENDERSON  |  SH0031  |  TYLER  |  6343-87-001  |  06/11/2019  |  $158,864.50  |  RMC - 634387001  |  GUARDRAIL REPAIR  |  730 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
CATOCON, INC.
CONC STR REPAIR (STANDARD)
SF 15.000 $250.000 $300.000
RIPRAP (MOW STRIP)(4 IN)
CY 10.000 $372.000 $400.000
MOBILIZATION (CALLOUT)
EA 14.000 $450.000 $400.000
MTL W-BEAM GD FEN (TIM POST)
LF 50.000 $10.000 $40.000
MTL THRIE-BEAM GD FEN (TIM POST)
LF 25.000 $15.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000 $1,150.000 $1,100.000
MTL BEAM GD FEN TRANS (T101)
EA 1.000 $500.000 $800.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 50.000 $2.000 $20.000
MTL THRIE-BEAM GD FEN ADJUSTMENT
LF 25.000 $2.000 $10.000
TRANSITION ADJUSTMENT
EA 1.000 $12.000 $100.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $625.000 $1,300.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 25.000 $9.500 $40.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 25.000 $9.500 $20.000
REMOVE METAL BEAM GUARD FENCE
LF 200.000 $3.000 $6.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $245.000 $250.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 1.000 $200.000 $250.000
GDRAIL END TRT(INST)(WOOD POST)(TY I)
EA 2.000 $1,245.000 $2,750.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $350.000 $1,000.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 1,500.000 $24.750 $25.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 25.000 $36.000 $40.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 5.000 $28.400 $50.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 100.000 $50.000 $55.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 4.000 $75.000 $100.000
REPAIR STEEL POST WITH BASE PLATE
EA 2.000 $150.000 $400.000
REALIGN POSTS
EA 50.000 $30.500 $20.000
INSTALL BLOCKOUT (TYPE SPECIFIED)
EA 100.000 $20.000 $20.000
REMOVE & REPLACE BLOCKOUT
EA 8.000 $26.500 $20.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 175.000 $29.500 $40.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 20.000 $87.250 $100.000
REPLACE TERMINAL ANCHOR POSTS
EA 1.000 $36.500 $300.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 15.000 $3,000.000 $3,750.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 4.000 $934.000 $1,000.000
REM & RESET SGT IMPACT HEAD
EA 3.000 $220.000 $200.000
REPLACE SGT CABLE ASSEMBLY
EA 2.000 $100.000 $100.000
REPLACE SGT CABLE ANCHOR
EA 2.000 $131.500 $100.000
REPLACE SGT STRUT
EA 1.000 $128.000 $100.000
REPLACE SGT OBJECT MARKER
EA 2.000 $26.000 $100.000
REPAIR RAIL ELEMENT(W - BEAM FURNISHED)
LF 25.000 $15.000 $15.000
REMOVE AND REPLACE (TRACC)
EA 1.000 $1,475.000 $4,000.000
REPAIR (TRACC)
EA 1.000 $550.000 $2,500.000
REPAIR (WIDE TRACC)
EA 1.000 $2,883.250 $5,000.000
REPAIR (NARROW QUAD)
EA 1.000 $566.500 $500.000
REPAIR (QUAD) (N) (BAY)
EA 2.000 $367.500 $800.000
REMOVE AND REPLACE (FASTRACC)
EA 2.000 $1,291.500 $9,000.000
REPAIR (FASTRACC) (BAY)
EA 6.000 $859.000 $600.000
QUAD(N)(BAY)NOSE ASSMBLY(REMOVE&REPLAC)
EA 10.000 $800.000 $500.000
REPAIR (STEEL POST W/ W-BEAM - T101)
LF 175.000 $52.500 $30.000
REPAIR (STL POST W/ DOUBLED W-BEAMS-T6)
LF 5.000 $38.750 $100.000
REPAIR(STEEL POST W/ CHANNEL IRON RAIL)
LF 25.000 $39.500 $40.000
Totals: $158,864.500 $198,135.000