Bid Cobra

HENDERSON SH 198 (0646-05-027)

Items: 114

County: HENDERSON
Length: N/A
Highway: SH 198
District: TYLER
Control Number: 0646-05-027
DBE Goal: N/A
Project: BR 2021(213)
Guaranty: N/A
Time: 738 WORKING DAYS
Engineer's Estimate: $26,604,181.40
Date: 01/07/2021 (5 years ago)
Contract Number: N/A
Type: RPLC BR&APP,C&G,RET WALLS,ACP B&S
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (8)
E
Engineer's Estimate
$26,604,181.40
1
Awarded
$30,355,868.31
Over/Under Est: 14.1% $3,751,686.91
$32,990,955.36
Over/Under Est: 24.01% $6,386,773.96
Amt Left: 8.68% $2,635,087.05
Over/Under Est: 30.1% $8,007,660.26
Amt Left: 14.02% $4,255,973.35
Delta: -4.91% -$1,620,886.30
Over/Under Est: 34.03% $9,052,708.53
Amt Left: 17.46% $5,301,021.62
Delta: -3.02% -$1,045,048.27
Over/Under Est: 40.18% $10,690,837.95
Amt Left: 22.86% $6,939,151.04
Delta: -4.59% -$1,638,129.42
Over/Under Est: 43.42% $11,551,139.05
Amt Left: 25.69% $7,799,452.14
Delta: -2.31% -$860,301.10
$39,757,677.70
Over/Under Est: 49.44% $13,153,496.30
Amt Left: 30.97% $9,401,809.39
Delta: -4.20% -$1,602,357.25
$46,893,811.54
Over/Under Est: 76.26% $20,289,630.14
Amt Left: 54.48% $16,537,943.23
Delta: -17.95% -$7,136,133.84
Subcontractor Percentage Amount
ATS DRILLING, INC. 22.31% $7,130,477.35
TEXAS MATERIALS GROUP, INC. 4.41% $1,409,475.80
JE CASEY, LLC 4.09% $1,307,200.91
EPCS ENVIRONMENTAL LLC 3.44% $1,099,455.05
ADVANCED EXCAVATION SOLUTIONS LLC 2.93% $936,454.44
BRAZOS RIVER CONTRACTORS LLC 2.35% $751,081.21
JB PINNACLE GROUP, LLC 2.35% $751,081.21
LA GRANDE CONSTRUCTION COMPANY LLC 2.27% $725,512.49
ANCORTEX, INC. 0.83% $265,275.49
J & M CONTRACTING, COMPANY 0.75% $239,706.77
A-CORE CONCRETE CUTTING OF TEXAS, INC. 0.61% $194,961.51
TRAFFIC SIGNS & LINES, LLC 0.43% $137,431.88
ASE CONTRACTORS LLC 0.42% $134,235.79
SIOUX EROSION CONTROL, INC. 0.31% $99,078.80
SPARTAN DIVERS 0.28% $89,490.53
STRAIGHT LINE SAWING & SEALING, INC. 0.17% $54,333.53
FLEX SUPPLY, LLC 0.16% $51,137.44
DAVIS MOTOR CRANE SERVICE, INC. 0.16% $51,137.44
AREA WIDE PROTECTIVE, INC. 0.15% $47,941.35
CRANE MASTERS, INC. 0.14% $44,745.26
HOUSTON SAWING & DRILLING 0.12% $38,353.08
HERMANOS STEEL, LLC 0.11% $35,156.99
PEACHTREE CONSTRUCTION, LTD. 0.09% $28,764.81
DARKHORSE INDUSTRIES, L.L.C. 0.06% $19,176.54
WIMS ENVIRONMENTAL CONSTRUCTION, LTD. 0.06% $19,176.54
SUN CRANE & HOIST, INC. 0.05% $15,980.45
BROCK CONSTRUCTION, LLC 0.04% $12,784.36
CURB PLANET INC. 0.03% $9,588.27
SCOTT DERR PAINTING CO, LLC 0.02% $6,392.18
STRUCTURAL INTEGRITY GROUP LLC 0.01% $3,196.09
BRAUN INTERTEC CORPORATION 0.01% $3,196.09
LUCKETT CRANE SERVICE 0.01% $3,196.09
TNT CRANE & RIGGING, INC. 0.01% $3,196.09
PENHALL COMPANY 0.00% $0.00
ROLL-LIFT USA, INC. 0.00% $0.00
Total: 49.18% $15,718,371.83

Bid Items & Bid Tabulations

114 Total 0 of 114
HENDERSON  |  SH 198  |  TYLER  |  0646-05-027  |  01/07/2021  |  $26,604,181.40  |  BR 2021(213)  |  RPLC BR&APP,C&G,RET WALLS,ACP B&S  |  738 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
COPASA INC
J.D. ABRAMS, L.P.
JENSEN CONSTRUCTION COMPANY OF TEXAS
PULICE CONSTRUCTION, INC.
AUSTIN BRIDGE & ROAD SERVICES, LP
RAGLE CONSTRUCTION, INC.
EAST TEXAS BRIDGE, INC.
OHL USA, INC.
PREPARING ROW
STA 31.750 $1,150.000 $2,000.000 $35,500.000 $10,000.000 $95,000.000 $117,112.230 $127,500.000 $65,000.000 $140,000.000
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 837.000 $7.000 $9.680 $13.000 $7.500 $7.930 $6.820 $8.000 $10.000 $20.000
OBLITERATING ABANDONED ROAD
STA 10.630 $5,000.000 $1,500.000 $900.000 $800.000 $2,016.480 $965.760 $2,500.000 $3,500.000 $5,000.000
EXCAVATION (ROADWAY)
CY 3,019.000 $11.000 $8.560 $2.750 $8.000 $13.870 $14.020 $32.000 $20.000 $35.000
EXCAVATION (SPECIAL)
CY 31,952.000 $20.000 $18.580 $15.000 $14.000 $15.090 $16.150 $11.500 $30.000 $11.400
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 13,368.000 $25.000 $25.000 $15.500 $35.000 $10.840 $37.380 $30.000 $30.000 $45.000
FURNISHING AND PLACING TOPSOIL (4")
SY 16,220.000 $2.500 $1.480 $3.450 $3.000 $1.060 $1.680 $2.750 $2.000 $0.750
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 16,220.000 $0.800 $0.650 $0.720 $0.800 $0.650 $0.650 $0.690 $0.880 $0.690
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 8,110.000 $0.700 $0.630 $0.700 $0.800 $0.630 $0.630 $0.650 $0.880 $0.650
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 8,110.000 $0.700 $0.630 $0.660 $0.630 $0.630 $0.630 $0.630 $0.880 $0.630
VEGETATIVE WATERING
MG 357.000 $21.000 $28.000 $22.300 $25.000 $25.950 $25.950 $25.000 $15.000 $38.000
LIME (HYDRATED LIME (DRY))
TON 53.000 $170.000 $185.000 $159.000 $180.000 $237.900 $170.450 $350.000 $300.000 $250.000
LIME TRT (EXST MATL)(8")
SY 2,907.000 $3.500 $5.000 $6.000 $5.000 $5.070 $6.000 $20.000 $8.000 $10.000
CEMENT
TON 53.000 $145.000 $166.950 $175.000 $150.000 $214.090 $141.060 $350.000 $200.000 $250.000
CEMENT TREAT(EXIST MATL)(8")
SY 2,907.000 $3.000 $5.000 $5.000 $5.000 $2.770 $6.000 $20.000 $6.000 $10.000
EMULS ASPH (EROSN CONT)(CSS-1)
GAL 330.000 $3.100 $10.150 $11.000 $10.150 $4.500 $9.870 $10.150 $11.000 $10.180
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
GAL 9,445.000 $2.800 $3.500 $3.700 $3.500 $3.700 $4.000 $3.500 $4.500 $5.000
AGGR (TY-PD GR-3 OR TY-PL GR-3)
CY 225.000 $107.000 $176.150 $185.000 $176.150 $207.000 $250.000 $176.150 $155.000 $180.000
D-GR HMA (SQ) TY-D PG64_22(LEVEL-UP)
TON 663.000 $115.000 $121.000 $128.000 $121.000 $136.500 $112.370 $121.000 $150.000 $125.000
PLANE ASPH CONC PAV(0" TO 2")
SY 1,378.000 $1.500 $4.740 $5.000 $3.000 $6.020 $4.530 $6.250 $6.000 $10.000
CEM STABIL BKFL
CY 472.000 $306.000 $165.530 $160.000 $50.000 $100.200 $148.350 $97.000 $300.000 $150.000
TRENCH EXCAVATION PROTECTION
LF 835.000 $3.100 $2.280 $2.500 $20.000 $5.700 $10.000 $1.000 $10.000 $2.590
TEMPORARY SPL SHORING
SF 2,793.000 $50.000 $50.000 $71.000 $25.000 $32.500 $62.380 $25.000 $35.000 $40.000
FOUNDATON LOADTEST(D4945)(DRILLD SHAFT)
EA 2.000 $18,000.000 $19,991.300 $26,500.000 $6,000.000 $25,000.000 $5,000.000 $41,500.000 $10,000.000 $4,961.700
DRILL SHAFT (18 IN)
LF 122.000 $50.000 $70.000 $290.000 $300.000 $241.370 $83.680 $140.000 $100.000 $800.000
DRILL SHAFT (42 IN)
LF 568.000 $272.000 $211.680 $395.000 $500.000 $337.440 $189.500 $340.000 $225.000 $500.000
DRILL SHAFT (48 IN)
LF 10,602.000 $650.000 $814.410 $800.000 $950.000 $621.240 $670.000 $625.000 $750.000 $1,250.000
CL C CONC (ABUT)
CY 121.400 $1,010.000 $1,306.410 $1,025.000 $1,200.000 $989.400 $1,215.950 $800.000 $1,200.000 $1,500.000
CL C CONC (BENT)
CY 1,854.200 $935.000 $1,371.560 $1,500.000 $1,500.000 $1,670.000 $1,717.000 $1,200.000 $1,200.000 $2,000.000
REINF CONC SLAB
SF 249,600.000 $20.000 $18.020 $21.000 $16.000 $19.000 $25.000 $20.000 $24.000 $18.000
APPROACH SLAB
CY 133.800 $825.000 $585.000 $550.000 $650.000 $762.260 $561.190 $455.000 $550.000 $495.460
RETAINING WALL (MSE)
SF 12,990.000 $60.000 $67.250 $25.000 $50.000 $40.000 $16.000 $1.000 $75.000 $35.000
RETAINING WALL (TEMP WALL)
SF 3,115.000 $11.000 $19.000 $5.000 $18.000 $20.030 $9.000 $16.500 $35.000 $10.000
PRESTR CONC GIRDER (TX70)
LF 24,859.120 $170.000 $171.510 $173.000 $200.000 $248.920 $185.070 $150.000 $200.000 $200.000
RIPRAP (CONC)(CL B)
CY 183.000 $540.000 $472.110 $568.000 $650.000 $550.000 $580.270 $470.000 $500.000 $500.000
RIPRAP (MOW STRIP)(4 IN)
CY 28.700 $500.000 $458.000 $568.000 $650.000 $550.000 $637.890 $500.000 $500.000 $480.000
RIPRAP (STONE TY F)(DRY)(18")
CY 240.000 $90.000 $260.000 $118.000 $140.000 $223.680 $125.000 $165.000 $150.000 $44.520
RAIL (TY T1F)
LF 12,540.000 $90.000 $111.570 $163.000 $160.000 $172.570 $205.000 $138.000 $200.000 $145.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 780.000 $85.000 $68.000 $121.000 $125.000 $146.110 $136.390 $102.000 $85.000 $157.130
RC PIPE (CL III)(18 IN)
LF 1,223.000 $40.000 $60.520 $57.000 $60.000 $107.220 $54.000 $58.000 $40.000 $48.000
RC PIPE (CL III)(24 IN)
LF 367.000 $57.000 $80.000 $78.000 $75.000 $144.860 $64.000 $75.000 $55.000 $69.000
INLET (COMPL)(PCO)(5FT)(NONE)
EA 6.000 $3,500.000 $5,188.650 $3,600.000 $4,200.000 $8,795.830 $4,000.000 $4,800.000 $6,000.000 $5,200.000
INLET (COMPL)(PCO)(5FT)(LEFT)
EA 4.000 $3,800.000 $5,640.800 $3,900.000 $4,200.000 $9,464.540 $5,000.000 $5,800.000 $6,500.000 $5,700.000
INLET (COMPL)(PCO)(5FT)(RIGHT)
EA 3.000 $3,800.000 $5,714.280 $3,900.000 $4,200.000 $9,464.810 $5,000.000 $6,150.000 $6,500.000 $5,700.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 28.000 $585.000 $800.000 $1,100.000 $1,400.000 $1,669.690 $1,000.000 $850.000 $600.000 $1,070.000
SET (TY II) (24 IN) (RCP) (3: 1) (P)
EA 2.000 $1,000.000 $950.000 $1,100.000 $1,600.000 $2,806.480 $950.000 $1,000.000 $650.000 $1,225.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $875.000 $1,500.000 $1,350.000 $1,600.000 $3,161.740 $1,800.000 $1,775.000 $900.000 $1,480.000
REMOV STR (BRIDGE 1000 FT OR GREATER)
EA 1.000 $200,000.000 $1,232,000.000 $900,000.000 $1,150,000.000 $1,232,000.000 $1,492,500.000 $1,840,000.000 $1,500,000.000 $3,150,000.000
REMOV STR (PIPE)
EA 19.000 $320.000 $1,000.000 $56.000 $250.000 $1,500.710 $391.920 $275.000 $500.000 $350.000
MOBILIZATION
LS 1.000 $2,399,000.000 $2,650,000.000 $3,270,000.000 $3,400,000.000 $3,626,737.770 $3,718,313.440 $4,500,000.000 $3,800,000.000 $4,500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 30.000 $5,000.000 $1,000.000 $13,500.000 $29,997.330 $5,844.110 $9,610.000 $140,000.000 $70,000.000 $50,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,080.000 $24.000 $26.550 $32.500 $27.000 $26.550 $26.550 $32.000 $35.000 $29.000
ROCK FILTER DAMS (REMOVE)
LF 1,080.000 $6.000 $8.450 $9.000 $8.000 $8.450 $8.450 $9.000 $11.000 $18.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 160.000 $20.000 $35.500 $31.500 $40.000 $35.500 $35.500 $21.500 $30.000 $45.000
CONSTRUCTION EXITS (REMOVE)
SY 160.000 $10.000 $11.950 $10.500 $10.000 $11.950 $11.950 $8.000 $11.000 $1.000
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
CY 600.000 $25.000 $33.120 $15.000 $20.000 $20.000 $18.000 $35.000 $30.000 $31.920
BACKHOE WORK (EROSION & SEDMT CONT)
HR 150.000 $92.000 $65.720 $144.000 $100.000 $149.710 $57.820 $120.000 $125.000 $75.410
TEMP SEDMT CONT FENCE (INSTALL)
LF 6,400.000 $3.000 $2.490 $3.000 $2.700 $2.290 $2.290 $1.650 $3.000 $1.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 6,400.000 $0.800 $0.650 $0.800 $0.500 $0.650 $0.650 $0.600 $1.000 $0.550
TRACKHOE WORK (EROSION & SEDMT CONT)
HR 200.000 $118.000 $90.250 $182.000 $275.000 $198.520 $98.390 $95.000 $200.000 $84.580
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 1,605.000 $30.000 $35.000 $65.000 $75.000 $41.090 $38.880 $48.000 $75.000 $30.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 430.000 $5.000 $8.000 $5.000 $20.000 $18.650 $5.340 $8.500 $5.000 $22.900
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 1,605.000 $8.500 $6.000 $7.500 $25.000 $16.280 $9.230 $8.500 $15.000 $13.250
CONC CURB & GUTTER (TY II)
LF 1,390.000 $25.000 $26.090 $23.500 $15.000 $45.000 $42.210 $26.500 $35.000 $45.000
DRIVEWAYS (ACP)
SY 1,797.000 $27.000 $32.000 $23.000 $14.840 $33.000 $39.190 $14.840 $55.000 $19.260
DRIVEWAYS (CONC) (HES)
SY 101.000 $65.000 $110.000 $100.000 $100.000 $130.000 $94.210 $95.000 $95.000 $121.700
MTL W-BEAM GD FEN (TIM POST)
LF 250.000 $20.000 $25.500 $20.000 $25.500 $25.500 $19.000 $25.500 $25.000 $19.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 3.000 $1,500.000 $1,946.100 $1,530.000 $1,946.100 $1,946.100 $1,450.000 $1,946.100 $1,800.000 $1,450.000
MTL BEAM GD FEN TRANS (TL2)
EA 2.000 $1,100.000 $1,233.260 $790.000 $1,233.260 $1,233.260 $750.000 $1,233.260 $1,300.000 $750.000
REMOVE METAL BEAM GUARD FENCE
LF 2,077.000 $3.000 $2.770 $2.650 $2.770 $2.770 $2.500 $2.770 $3.000 $2.500
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $2,150.000 $2,930.410 $2,625.000 $2,930.410 $2,930.410 $2,500.000 $2,930.410 $300.000 $2,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $360.000 $48.090 $231.000 $48.090 $48.090 $220.000 $48.090 $3,000.000 $220.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $1,000.000 $114.490 $121.000 $114.490 $114.490 $114.490 $114.490 $900.000 $850.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 1.000 $20,000.000 $14,337.880 $16,500.000 $14,337.580 $14,337.880 $14,337.880 $14,337.880 $18,000.000 $22,477.230
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
EA 2.000 $35,000.000 $27,246.730 $31,500.000 $27,246.730 $27,246.730 $27,246.730 $27,246.730 $33,000.000 $22,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $20,000.000 $8,066.770 $9,300.000 $8,006.770 $8,006.770 $8,006.770 $8,006.770 $11,000.000 $7,625.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 3.000 $245.000 $275.950 $237.000 $225.700 $250.000 $350.000 $225.700 $300.000 $295.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 2.000 $290.000 $306.360 $282.000 $267.300 $300.000 $375.000 $267.300 $400.000 $329.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 18.000 $450.000 $265.610 $320.000 $303.900 $350.000 $630.000 $303.900 $1,000.000 $385.000
REMOVE SM RD SN SUP&AM
EA 14.000 $170.000 $103.980 $107.000 $101.900 $80.000 $90.000 $101.900 $150.000 $137.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 9.000 $15.000 $28.410 $13.000 $12.300 $30.000 $29.000 $12.300 $30.000 $29.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 8,500.000 $0.150 $0.500 $0.420 $0.400 $0.360 $0.360 $0.400 $0.550 $0.360
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 14,680.000 $0.400 $0.500 $0.420 $0.400 $0.360 $0.360 $0.400 $0.550 $0.360
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 314.000 $2.500 $5.000 $4.600 $5.500 $4.000 $4.000 $5.500 $5.500 $4.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 314.000 $2.500 $5.000 $4.600 $5.500 $4.000 $4.000 $5.500 $5.500 $4.000
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 936.000 $2.000 $4.000 $4.600 $5.000 $4.000 $4.000 $5.000 $4.500 $4.000
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 936.000 $2.000 $4.000 $4.600 $5.000 $4.000 $4.000 $5.000 $4.500 $4.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 17,037.000 $1.000 $0.660 $1.150 $0.250 $0.750 $1.000 $1.000 $2.000 $1.230
WK ZN PAV MRK SHT TERM RMV (W)(4")
LF 765.000 $1.500 $1.510 $1.150 $1.000 $1.000 $1.500 $2.000 $2.000 $1.600
WK ZN PAV MRK SHT TERM RMV (Y)(4")
LF 1,286.000 $1.000 $1.360 $1.150 $1.000 $0.850 $1.500 $2.000 $2.000 $1.580
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 100.000 $3.000 $6.000 $10.500 $8.000 $10.000 $10.000 $8.000 $7.000 $10.000
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 300.000 $3.000 $6.000 $8.400 $8.000 $8.000 $8.000 $8.000 $7.000 $8.000
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
EA 3.000 $325.000 $500.000 $450.000 $100.000 $425.000 $425.000 $100.000 $600.000 $425.000
PAVEMENT SEALER 4"
LF 13,680.000 $0.250 $0.350 $0.180 $0.200 $0.170 $0.170 $0.200 $0.380 $0.170
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 1,950.000 $0.300 $0.600 $0.580 $0.900 $0.550 $0.550 $0.900 $0.700 $0.550
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 12,560.000 $0.300 $0.600 $0.490 $0.700 $0.470 $0.470 $0.700 $0.700 $0.470
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 600.000 $0.300 $0.600 $0.580 $0.900 $0.550 $0.550 $0.900 $0.700 $0.550
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 15,310.000 $0.300 $0.600 $0.490 $0.700 $0.470 $0.470 $0.700 $0.700 $0.470
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 6.000 $310.000 $190.000 $470.000 $450.000 $445.000 $445.000 $450.000 $220.000 $445.000
REFL PAV MRKR TY I-C
EA 24.000 $3.000 $5.000 $4.200 $5.000 $4.000 $4.000 $5.500 $6.000 $4.000
REFL PAV MRKR TY II-A-A
EA 440.000 $3.000 $3.600 $4.200 $5.500 $4.000 $4.000 $5.500 $4.000 $4.000
REFL PAV MRKR TY II-C-R
EA 74.000 $3.000 $5.000 $4.200 $5.500 $4.000 $4.000 $5.500 $6.000 $4.000
ELIM EXT PAV MRK & MRKS (4")
LF 6,250.000 $0.200 $0.750 $0.600 $1.000 $0.570 $0.570 $1.000 $1.000 $0.570
PAV SURF PREP FOR MRK (4")
LF 13,680.000 $0.200 $0.150 $0.260 $0.100 $0.250 $0.250 $0.100 $0.170 $0.250
SP MIXES SP-B PG64-22
TON 6,382.000 $100.000 $103.350 $109.000 $103.350 $115.500 $90.990 $115.000 $115.000 $120.000
SP MIXES SP-C PG64-22
TON 144.000 $95.000 $163.550 $172.000 $163.350 $130.000 $115.140 $163.350 $200.000 $163.760
SP MIXES SP-C SAC-A PG70-22
TON 2,474.000 $110.000 $121.100 $128.000 $121.100 $126.500 $103.940 $121.100 $125.000 $121.400
TACK COAT
GAL 4,066.000 $3.250 $3.500 $3.700 $3.500 $3.100 $3.000 $3.500 $3.000 $3.510
TIP TESTING(DRILL SHAFT)
EA 8.000 $4,500.000 $4,665.490 $3,700.000 $3,000.000 $3,440.630 $3,000.000 $3,440.630 $4,000.000 $2,977.020
FLOATING TURBIDITY BARRIER(FUR & INST)
LF 5,700.000 $16.400 $27.550 $23.500 $40.000 $29.210 $34.860 $27.500 $65.000 $16.540
FLOATING TURBIDITY BARRIER (REMOVE)
LF 5,700.000 $3.900 $12.000 $3.000 $1.500 $5.210 $5.660 $7.700 $10.000 $4.270
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,500.000 $8,200.000 $12,500.000 $7,500.000 $19,031.990 $7,500.000 $20,000.000 $200,000.000 $8,000.000
TMA (STATIONARY)
DAY 200.000 $125.000 $142.950 $130.000 $300.000 $200.000 $275.060 $314.890 $300.000 $300.000
TMA (MOBILE OPERATION)
DAY 6.000 $101.000 $250.000 $600.000 $750.000 $200.000 $685.820 $500.000 $300.000 $1,000.000
Totals: $26,604,181.400 $30,355,868.317 $32,990,955.360 $34,611,841.660 $35,656,889.941 $37,295,019.375 $38,155,320.450 $39,757,677.700 $46,893,811.548