HENDERSON FM 315 (0559-02-037)

Items: 92

County: HENDERSON
Length: N/A
Highway: FM 315
District: TYLER
Control Number: 0559-02-037
DBE Goal: N/A
Project: STP 2B23(064)HES
Guaranty: N/A
Time: 119 WORKING DAYS
Engineer's Estimate: $11,302,404.38
Date: 08/03/2023 (2 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
LOUIS MCDOW
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$11,302,404.38
$9,287,827.25
Over/Under Est: -17.82% -$2,014,577.13
$9,814,464.00
Over/Under Est: -13.16% -$1,487,940.38
Amt Left: 5.67% $526,636.75
Subcontractor Percentage Amount
BAHENA CONSTRUCTION CO., INC. 8.55% $821,854.65
COLD CREEK CONSTRUCTION, LTD 3.25% $312,400.89
STRIPING TECHNOLOGY, L.P. 2.99% $287,408.82
MURRAY CONSTRUCTION 1.51% $145,146.26
FORTSON CONTRACTING, INC. 1.16% $111,503.09
SOUTHWEST ENVIRONMENT SERVICES LLC 1.14% $109,580.62
PROFESSIONAL TRAFFIC CONTROL LLC 0.15% $14,418.50
KING GEORGE TRAFFIC SOLUTIONS LLC 0.13% $12,496.04
Total: 18.88% $1,814,808.87

Bid Items & Bid Tabulations

92 Total 0 of 92
HENDERSON  |  FM 315  |  TYLER  |  0559-02-037  |  08/03/2023  |  $11,302,404.38  |  STP 2B23(064)HES  |  HAZARD ELIM & SAFETY  |  119 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
A. L. HELMCAMP, INC.
PREPARING ROW
STA 253.000 $6,000.000 $3,000.000 $2,500.000
REMOVING CONC (DRIVEWAYS)
SY 624.000 $27.000 $25.000 $25.000
REMOVING CONCRETE(MOW STRIP)
LF 2,670.000 $20.000 $15.000 $7.000
SUBGRADE WIDENING (ORD COMP)
STA 253.000 $600.000 $1,000.000 $500.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 1,677.000 $100.000 $40.000 $90.000
BACKFILL (TY A)
STA 253.000 $450.000 $500.000 $650.000
BLADING
STA 253.000 $250.000 $250.000 $200.000
FURNISHING AND PLACING TOPSOIL (4")
SY 12,394.000 $8.000 $3.500 $3.600
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 47,159.000 $0.330 $0.200 $0.140
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 94,318.000 $0.790 $0.750 $0.600
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 47,159.000 $1.000 $0.750 $0.600
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 47,159.000 $1.000 $0.750 $0.600
VEGETATIVE WATERING
MG 1,037.000 $47.500 $10.000 $35.000
EMULS ASPH (EROSN CONT)(CSS-1)
GAL 4,218.000 $8.000 $5.000 $4.500
ASPH (CRS-2P)
GAL 15,862.000 $7.900 $4.500 $6.000
AGGR(TY-PD GR-4 OR TY-PL GR-4)
CY 339.000 $382.000 $150.000 $320.000
PLANE ASPH CONC PAV(0" TO 2")
SY 4,444.000 $9.000 $5.000 $15.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 18.000 $250.000 $350.000 $240.000
RIPRAP (MOW STRIP)(4 IN)
CY 154.000 $630.000 $650.000 $700.000
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 39.000 $1,000.000 $1,200.000 $1,000.000
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
LF 13.000 $1,300.000 $1,600.000 $1,200.000
RC PIPE (CL III)(18 IN)
LF 2,284.000 $75.000 $90.000 $80.000
RC PIPE (CL III)(24 IN)
LF 473.000 $100.000 $110.000 $120.000
RC PIPE (CL III)(30 IN)
LF 38.000 $105.000 $250.000 $150.000
RC PIPE (CL III)(36 IN)
LF 10.000 $155.000 $350.000 $350.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 10.000 $1,500.000 $1,000.000 $1,300.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 246.000 $1,200.000 $1,200.000 $950.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 6.000 $1,400.000 $1,400.000 $1,600.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 34.000 $1,600.000 $1,800.000 $1,800.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 7.000 $3,000.000 $2,500.000 $2,600.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 2.000 $6,000.000 $4,000.000 $4,400.000
REMOV STR (PIPE)
EA 114.000 $605.000 $500.000 $550.000
MOBILIZATION
LS 1.000 $600,000.000 $912,000.000 $850,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $10,000.000 $30,000.000 $24,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 440.000 $43.000 $37.000 $43.000
ROCK FILTER DAMS (REMOVE)
LF 440.000 $15.000 $8.000 $10.000
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
CY 100.000 $50.000 $30.000 $33.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 20.000 $125.000 $150.000 $140.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,600.000 $4.000 $6.000 $3.800
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,600.000 $2.000 $2.000 $1.000
TRACKHOE WORK (EROSION & SEDMT CONT)
HR 20.000 $150.000 $150.000 $145.000
INTERSECTIONS (ACP)
SY 7,395.000 $50.000 $50.000 $50.000
DRIVEWAYS (ACP)
SY 8,604.000 $65.000 $50.000 $90.000
TURNOUTS (ACP)
SY 2,266.000 $50.000 $80.000 $50.000
DRIVEWAYS (CONC) (HES)
SY 624.000 $140.000 $150.000 $220.000
RUMBLE STRIPS (SHOULDER)
LF 61,342.000 $0.500 $0.250 $0.200
RUMBLE STRIPS (CENTERLINE)
LF 35,121.000 $0.350 $0.250 $0.200
MTL W-BEAM GD FEN (STEEL POST)
LF 2,900.000 $33.000 $35.000 $27.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 50.000 $50.000 $50.000 $32.000
REMOVE METAL BEAM GUARD FENCE
LF 2,325.000 $2.500 $5.000 $2.300
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $3,100.000 $3,200.000 $3,100.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $210.000 $300.000 $230.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 47.000 $600.000 $350.000 $350.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 26.000 $714.000 $400.000 $380.000
MAILBOX INSTALL-M (TWG-POST) TY 2
EA 66.000 $775.000 $600.000 $570.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 104.000 $900.000 $650.000 $580.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 31.000 $989.000 $750.000 $720.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $1,165.000 $1,000.000 $940.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $1,200.000 $1,200.000 $1,000.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 3.000 $635.000 $600.000 $530.000
REMOVE SM RD SN SUP&AM
EA 122.000 $220.000 $100.000 $85.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 29.000 $25.000 $40.000 $35.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 25.000 $27.000 $40.000 $35.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 32.000 $90.000 $60.000 $75.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 148,288.000 $1.000 $0.400 $0.330
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 149,068.000 $1.000 $0.400 $0.300
WK ZN PAV MRK NON-REMOV (Y)8"(SLD)
LF 821.000 $1.000 $1.500 $1.000
WK ZN PAV MRK NON-REMOV (Y)24"(SLD)
LF 378.000 $5.000 $5.000 $4.000
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 441.000 $2.000 $3.000 $1.400
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 50,297.000 $3.000 $1.500 $1.400
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 3,584.000 $4.000 $2.000 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 7,022.000 $4.000 $2.000 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 821.000 $1.670 $2.000 $1.100
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 778.000 $11.220 $10.000 $6.600
PAVEMENT SEALER 6"
LF 28,160.000 $1.000 $0.450 $0.400
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 76,805.000 $1.130 $1.000 $0.800
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 1,849.000 $1.000 $1.200 $1.100
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 78,268.000 $1.170 $1.000 $0.800
PREFAB PAV MRK TY C (W) (ARROW)
EA 7.000 $239.000 $300.000 $230.000
PREFAB PAV MRK TY C (W) (WORD)
EA 7.000 $280.000 $350.000 $260.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 5.000 $270.000 $150.000 $110.000
REFL PAV MRKR TY I-C
EA 64.000 $4.800 $15.000 $11.000
REFL PAV MRKR TY II-A-A
EA 8.000 $6.000 $15.000 $11.000
ELIM EXT PAV MRK & MRKS (4")
LF 28,160.000 $1.100 $0.900 $0.730
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
LF 136,447.000 $1.500 $0.500 $0.280
PAV SURF PREP FOR MRK (6")
LF 28,160.000 $1.000 $0.300 $0.220
SP MIXES SP-B PG64-22
TON 8,606.000 $200.000 $150.000 $185.000
SP MIXES SP-C SAC-A PG70-22
TON 12,300.000 $200.000 $170.000 $190.000
TACK COAT
GAL 16,096.000 $6.150 $4.000 $6.590
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 256.000 $212.000 $150.000 $250.000
TMA (STATIONARY)
DAY 220.000 $400.000 $300.000 $300.000
TMA (MOBILE OPERATION)
DAY 30.000 $250.000 $600.000 $300.000
Totals: $11,302,404.380 $9,287,827.250 $9,814,464.000