PREPARING ROW
|
STA
|
253.000
|
$6,000.000
|
$3,000.000
|
$2,500.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
624.000
|
$27.000
|
$25.000
|
$25.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
2,670.000
|
$20.000
|
$15.000
|
$7.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
253.000
|
$600.000
|
$1,000.000
|
$500.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
1,677.000
|
$100.000
|
$40.000
|
$90.000
|
|
|
BACKFILL (TY A)
|
STA
|
253.000
|
$450.000
|
$500.000
|
$650.000
|
|
|
BLADING
|
STA
|
253.000
|
$250.000
|
$250.000
|
$200.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
12,394.000
|
$8.000
|
$3.500
|
$3.600
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
47,159.000
|
$0.330
|
$0.200
|
$0.140
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
94,318.000
|
$0.790
|
$0.750
|
$0.600
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
47,159.000
|
$1.000
|
$0.750
|
$0.600
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
47,159.000
|
$1.000
|
$0.750
|
$0.600
|
|
|
VEGETATIVE WATERING
|
MG
|
1,037.000
|
$47.500
|
$10.000
|
$35.000
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1)
|
GAL
|
4,218.000
|
$8.000
|
$5.000
|
$4.500
|
|
|
ASPH (CRS-2P)
|
GAL
|
15,862.000
|
$7.900
|
$4.500
|
$6.000
|
|
|
AGGR(TY-PD GR-4 OR TY-PL GR-4)
|
CY
|
339.000
|
$382.000
|
$150.000
|
$320.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
4,444.000
|
$9.000
|
$5.000
|
$15.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
18.000
|
$250.000
|
$350.000
|
$240.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
154.000
|
$630.000
|
$650.000
|
$700.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
39.000
|
$1,000.000
|
$1,200.000
|
$1,000.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
|
LF
|
13.000
|
$1,300.000
|
$1,600.000
|
$1,200.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
2,284.000
|
$75.000
|
$90.000
|
$80.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
473.000
|
$100.000
|
$110.000
|
$120.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
38.000
|
$105.000
|
$250.000
|
$150.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
10.000
|
$155.000
|
$350.000
|
$350.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
10.000
|
$1,500.000
|
$1,000.000
|
$1,300.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
246.000
|
$1,200.000
|
$1,200.000
|
$950.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
6.000
|
$1,400.000
|
$1,400.000
|
$1,600.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
34.000
|
$1,600.000
|
$1,800.000
|
$1,800.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
7.000
|
$3,000.000
|
$2,500.000
|
$2,600.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$6,000.000
|
$4,000.000
|
$4,400.000
|
|
|
REMOV STR (PIPE)
|
EA
|
114.000
|
$605.000
|
$500.000
|
$550.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$600,000.000
|
$912,000.000
|
$850,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$10,000.000
|
$30,000.000
|
$24,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
440.000
|
$43.000
|
$37.000
|
$43.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
440.000
|
$15.000
|
$8.000
|
$10.000
|
|
|
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
|
CY
|
100.000
|
$50.000
|
$30.000
|
$33.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
20.000
|
$125.000
|
$150.000
|
$140.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,600.000
|
$4.000
|
$6.000
|
$3.800
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,600.000
|
$2.000
|
$2.000
|
$1.000
|
|
|
TRACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
20.000
|
$150.000
|
$150.000
|
$145.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
7,395.000
|
$50.000
|
$50.000
|
$50.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
8,604.000
|
$65.000
|
$50.000
|
$90.000
|
|
|
TURNOUTS (ACP)
|
SY
|
2,266.000
|
$50.000
|
$80.000
|
$50.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
624.000
|
$140.000
|
$150.000
|
$220.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
61,342.000
|
$0.500
|
$0.250
|
$0.200
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
35,121.000
|
$0.350
|
$0.250
|
$0.200
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
2,900.000
|
$33.000
|
$35.000
|
$27.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
50.000
|
$50.000
|
$50.000
|
$32.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,325.000
|
$2.500
|
$5.000
|
$2.300
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$3,100.000
|
$3,200.000
|
$3,100.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$210.000
|
$300.000
|
$230.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
47.000
|
$600.000
|
$350.000
|
$350.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
26.000
|
$714.000
|
$400.000
|
$380.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 2
|
EA
|
66.000
|
$775.000
|
$600.000
|
$570.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
104.000
|
$900.000
|
$650.000
|
$580.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
31.000
|
$989.000
|
$750.000
|
$720.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$1,165.000
|
$1,000.000
|
$940.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$1,200.000
|
$1,200.000
|
$1,000.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
3.000
|
$635.000
|
$600.000
|
$530.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
122.000
|
$220.000
|
$100.000
|
$85.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
29.000
|
$25.000
|
$40.000
|
$35.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
25.000
|
$27.000
|
$40.000
|
$35.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
32.000
|
$90.000
|
$60.000
|
$75.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
148,288.000
|
$1.000
|
$0.400
|
$0.330
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
149,068.000
|
$1.000
|
$0.400
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (Y)8"(SLD)
|
LF
|
821.000
|
$1.000
|
$1.500
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)24"(SLD)
|
LF
|
378.000
|
$5.000
|
$5.000
|
$4.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
441.000
|
$2.000
|
$3.000
|
$1.400
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
50,297.000
|
$3.000
|
$1.500
|
$1.400
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
3,584.000
|
$4.000
|
$2.000
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
7,022.000
|
$4.000
|
$2.000
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
821.000
|
$1.670
|
$2.000
|
$1.100
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
778.000
|
$11.220
|
$10.000
|
$6.600
|
|
|
PAVEMENT SEALER 6"
|
LF
|
28,160.000
|
$1.000
|
$0.450
|
$0.400
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
76,805.000
|
$1.130
|
$1.000
|
$0.800
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
1,849.000
|
$1.000
|
$1.200
|
$1.100
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
78,268.000
|
$1.170
|
$1.000
|
$0.800
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
7.000
|
$239.000
|
$300.000
|
$230.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
7.000
|
$280.000
|
$350.000
|
$260.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
5.000
|
$270.000
|
$150.000
|
$110.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
64.000
|
$4.800
|
$15.000
|
$11.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
8.000
|
$6.000
|
$15.000
|
$11.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
28,160.000
|
$1.100
|
$0.900
|
$0.730
|
|
|
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
|
LF
|
136,447.000
|
$1.500
|
$0.500
|
$0.280
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
28,160.000
|
$1.000
|
$0.300
|
$0.220
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
8,606.000
|
$200.000
|
$150.000
|
$185.000
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
12,300.000
|
$200.000
|
$170.000
|
$190.000
|
|
|
TACK COAT
|
GAL
|
16,096.000
|
$6.150
|
$4.000
|
$6.590
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
256.000
|
$212.000
|
$150.000
|
$250.000
|
|
|
TMA (STATIONARY)
|
DAY
|
220.000
|
$400.000
|
$300.000
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
30.000
|
$250.000
|
$600.000
|
$300.000
|
|
Totals: |
$11,302,404.380
|
$9,287,827.250
|
$9,814,464.000
|