PREPARING ROW
|
STA
|
229.000
|
$2,000.000
|
$10.000
|
$800.000
|
$2,000.000
|
$500.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
343.000
|
$12.000
|
$10.000
|
$30.000
|
$20.000
|
$22.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
68.000
|
$10.000
|
$10.000
|
$20.000
|
$5.000
|
$20.000
|
|
|
REMOVE CONC (MISC)
|
EA
|
1.000
|
$400.000
|
$700.000
|
$800.000
|
$3,000.000
|
$5,500.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
3,062.000
|
$4.000
|
$2.750
|
$7.000
|
$4.000
|
$11.500
|
|
|
REMOVING STB BASE AND ASPH PAV(10-14")
|
SY
|
20,227.000
|
$2.300
|
$1.000
|
$7.000
|
$6.000
|
$5.250
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
37,130.000
|
$12.000
|
$10.000
|
$9.000
|
$8.000
|
$7.500
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
9,981.000
|
$14.000
|
$10.000
|
$7.000
|
$15.000
|
$10.000
|
|
|
BACKFILL (TY A)
|
STA
|
458.000
|
$200.000
|
$10.000
|
$150.000
|
$100.000
|
$175.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
112,596.000
|
$1.000
|
$1.300
|
$0.500
|
$1.000
|
$1.250
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
112,596.000
|
$0.800
|
$1.150
|
$0.680
|
$0.750
|
$0.800
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
56,299.000
|
$0.700
|
$1.100
|
$0.680
|
$0.600
|
$0.850
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
56,297.000
|
$0.700
|
$1.100
|
$0.680
|
$0.600
|
$0.850
|
|
|
VEGETATIVE WATERING
|
MG
|
2,477.000
|
$8.000
|
$5.000
|
$10.000
|
$8.000
|
$2.000
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
|
SY
|
61,184.000
|
$8.000
|
$15.000
|
$16.000
|
$14.000
|
$16.250
|
|
|
CEMENT
|
TON
|
1,010.000
|
$150.000
|
$140.000
|
$160.000
|
$150.000
|
$170.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
61,184.000
|
$3.000
|
$4.000
|
$3.800
|
$2.250
|
$2.550
|
|
|
PRIME COAT (MC-30)
|
GAL
|
9,178.000
|
$4.000
|
$5.000
|
$4.000
|
$5.000
|
$4.000
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1)
|
GAL
|
2,989.000
|
$4.250
|
$3.500
|
$4.200
|
$5.000
|
$4.250
|
|
|
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
|
GAL
|
164,694.000
|
$3.250
|
$3.050
|
$3.200
|
$2.950
|
$3.500
|
|
|
AGGR (TY-PD GR-3 OR TY-PL GR-3)
|
CY
|
3,397.000
|
$125.000
|
$130.000
|
$110.000
|
$100.000
|
$140.000
|
|
|
AGGR(TY-PD GR-4 OR TY-PL GR-4)
|
CY
|
510.000
|
$125.000
|
$130.000
|
$120.000
|
$100.000
|
$140.000
|
|
|
D-GR HMA(SQ) TY-C PG64-22
|
TON
|
406.000
|
$150.000
|
$106.000
|
$150.000
|
$100.000
|
$120.000
|
|
|
SUPERPAVE MIXTURES SP-C SAC-A PG70-22
|
TON
|
43,188.000
|
$110.000
|
$110.000
|
$95.000
|
$105.000
|
$103.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
293,615.000
|
$3.000
|
$1.250
|
$1.750
|
$1.500
|
$1.650
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
25.000
|
$10.000
|
$1.000
|
$18.000
|
$100.000
|
$25.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
856.000
|
$27.000
|
$33.000
|
$40.000
|
$45.000
|
$32.000
|
|
|
CL A CONC (PLUG)
|
EA
|
1.000
|
$950.000
|
$1,500.000
|
$2,000.000
|
$5,000.000
|
$2,800.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
16.000
|
$600.000
|
$655.000
|
$550.000
|
$450.000
|
$545.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
2,814.000
|
$110.000
|
$125.000
|
$120.000
|
$125.000
|
$155.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
52.000
|
$490.000
|
$670.000
|
$550.000
|
$450.000
|
$525.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
17.000
|
$500.000
|
$330.000
|
$800.000
|
$600.000
|
$420.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
|
LF
|
42.000
|
$480.000
|
$390.000
|
$800.000
|
$600.000
|
$480.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
|
LF
|
7.000
|
$600.000
|
$670.000
|
$800.000
|
$800.000
|
$700.000
|
|
|
CONC BOX CULV (8 FT X 8 FT)(EXTEND)
|
LF
|
44.000
|
$960.000
|
$750.000
|
$1,000.000
|
$900.000
|
$700.000
|
|
|
CONC BOX CULV (10 FT X 10 FT)(EXTEND)
|
LF
|
45.000
|
$800.000
|
$870.000
|
$1,200.000
|
$1,000.000
|
$825.000
|
|
|
CONC BOX CULV (5 FT X 6 FT) (EXTEND)
|
LF
|
25.000
|
$750.000
|
$625.000
|
$900.000
|
$800.000
|
$700.000
|
|
|
CONC BOX CULV (5 FT X 6.5 FT)(EXTEND)
|
LF
|
25.000
|
$800.000
|
$650.000
|
$900.000
|
$1,000.000
|
$725.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
2,444.000
|
$50.000
|
$43.000
|
$55.000
|
$40.000
|
$39.500
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
16.000
|
$80.000
|
$67.000
|
$130.000
|
$100.000
|
$60.000
|
|
|
WINGWALL (FW - 0) (HW=12 FT)
|
EA
|
1.000
|
$30,900.000
|
$26,000.000
|
$25,000.000
|
$18,000.000
|
$18,000.000
|
|
|
WINGWALL (FW - 0) (HW=3 FT)
|
EA
|
1.000
|
$6,200.000
|
$6,000.000
|
$4,000.000
|
$2,000.000
|
$6,600.000
|
|
|
WINGWALL (PW - 1) (HW=10 FT)
|
EA
|
2.000
|
$29,000.000
|
$26,000.000
|
$38,000.000
|
$15,000.000
|
$24,000.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
2.000
|
$11,500.000
|
$10,000.000
|
$9,000.000
|
$6,000.000
|
$8,000.000
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
2.000
|
$14,500.000
|
$20,000.000
|
$20,000.000
|
$15,000.000
|
$15,500.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
116.000
|
$750.000
|
$720.000
|
$700.000
|
$550.000
|
$650.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$1,000.000
|
$1,000.000
|
$900.000
|
$900.000
|
$950.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
15.000
|
$2,500.000
|
$2,900.000
|
$1,600.000
|
$1,000.000
|
$3,600.000
|
|
|
REMOV STR (SET)
|
EA
|
9.000
|
$375.000
|
$225.000
|
$200.000
|
$500.000
|
$300.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
8.000
|
$2,500.000
|
$800.000
|
$1,200.000
|
$1,000.000
|
$2,600.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
1.000
|
$1,000.000
|
$800.000
|
$1,200.000
|
$1,000.000
|
$2,600.000
|
|
|
REMOV STR (DRIVEWAY CULVERT)
|
EA
|
30.000
|
$300.000
|
$400.000
|
$450.000
|
$500.000
|
$275.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,142,314.000
|
$705,500.000
|
$1,000,000.000
|
$900,000.000
|
$1,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
17.000
|
$5,000.000
|
$2,000.000
|
$11,000.000
|
$5,000.000
|
$3,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
750.000
|
$30.000
|
$29.000
|
$30.000
|
$33.000
|
$25.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
50.000
|
$31.000
|
$42.000
|
$40.000
|
$45.000
|
$30.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
800.000
|
$8.000
|
$15.000
|
$3.000
|
$15.000
|
$6.500
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
780.000
|
$20.000
|
$15.000
|
$15.000
|
$20.000
|
$32.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
780.000
|
$10.000
|
$12.000
|
$3.000
|
$12.000
|
$8.750
|
|
|
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
|
CY
|
500.000
|
$19.000
|
$10.000
|
$20.000
|
$30.000
|
$25.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
75.000
|
$90.000
|
$55.000
|
$66.000
|
$125.000
|
$175.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
672.000
|
$2.700
|
$2.500
|
$3.500
|
$5.000
|
$4.350
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
672.000
|
$0.800
|
$2.000
|
$0.900
|
$1.000
|
$1.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
960.000
|
$4.300
|
$4.000
|
$5.000
|
$6.000
|
$4.300
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
960.000
|
$1.200
|
$2.000
|
$0.600
|
$1.000
|
$0.900
|
|
|
TRACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
75.000
|
$120.000
|
$90.000
|
$90.000
|
$225.000
|
$175.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
270.000
|
$80.000
|
$105.000
|
$87.000
|
$90.000
|
$90.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
1,080.000
|
$17.000
|
$18.000
|
$25.000
|
$5.000
|
$14.000
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
270.000
|
$25.000
|
$25.000
|
$30.000
|
$20.000
|
$18.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
10,528.000
|
$28.000
|
$29.000
|
$27.000
|
$33.000
|
$28.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
405.000
|
$99.000
|
$100.000
|
$110.000
|
$85.000
|
$100.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
71,620.000
|
$0.190
|
$0.170
|
$0.140
|
$0.250
|
$0.200
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
775.000
|
$30.000
|
$27.500
|
$26.000
|
$26.000
|
$26.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
3.000
|
$1,100.000
|
$1,315.000
|
$1,200.000
|
$1,300.000
|
$1,265.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
3.000
|
$2,700.000
|
$3,000.000
|
$2,600.000
|
$2,800.000
|
$2,800.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
4.000
|
$2,100.000
|
$2,500.000
|
$1,000.000
|
$3,000.000
|
$2,400.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$950.000
|
$915.000
|
$800.000
|
$1,000.000
|
$900.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
1.000
|
$11,700.000
|
$11,000.000
|
$9,500.000
|
$10,000.000
|
$11,000.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
38.000
|
$260.000
|
$315.000
|
$230.000
|
$230.000
|
$305.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
2.000
|
$340.000
|
$355.000
|
$270.000
|
$270.000
|
$340.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
38.000
|
$565.000
|
$650.000
|
$400.000
|
$400.000
|
$625.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
22.000
|
$610.000
|
$855.000
|
$500.000
|
$500.000
|
$820.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$700.000
|
$715.000
|
$480.000
|
$500.000
|
$690.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$650.000
|
$860.000
|
$570.000
|
$600.000
|
$830.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
|
EA
|
2.000
|
$1,000.000
|
$1,135.000
|
$900.000
|
$900.000
|
$1,095.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
5.000
|
$850.000
|
$1,035.000
|
$450.000
|
$500.000
|
$1,000.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
59.000
|
$105.000
|
$135.000
|
$60.000
|
$60.000
|
$130.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
|
EA
|
21.000
|
$40.000
|
$50.000
|
$55.000
|
$50.000
|
$65.000
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(FLX)GND
|
EA
|
24.000
|
$50.000
|
$50.000
|
$55.000
|
$50.000
|
$65.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
4.000
|
$50.000
|
$50.000
|
$60.000
|
$50.000
|
$65.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
10.000
|
$30.000
|
$28.000
|
$30.000
|
$50.000
|
$58.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
45,744.000
|
$0.200
|
$0.150
|
$0.150
|
$0.150
|
$0.160
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
114,350.000
|
$0.200
|
$0.150
|
$0.150
|
$0.150
|
$0.160
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
91,480.000
|
$0.200
|
$0.150
|
$0.150
|
$0.150
|
$0.160
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
22,872.000
|
$1.000
|
$0.110
|
$0.110
|
$0.110
|
$0.110
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
71,088.000
|
$0.600
|
$0.950
|
$0.880
|
$0.900
|
$0.920
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
71,638.000
|
$0.600
|
$0.950
|
$0.880
|
$0.900
|
$0.920
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
13,720.000
|
$1.000
|
$1.000
|
$0.700
|
$2.000
|
$1.200
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
174.000
|
$1.000
|
$1.100
|
$1.100
|
$1.100
|
$1.100
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
8,434.000
|
$0.700
|
$0.950
|
$0.900
|
$0.900
|
$0.920
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
300.000
|
$2.700
|
$3.750
|
$3.700
|
$4.000
|
$3.850
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
288.000
|
$5.000
|
$6.000
|
$5.800
|
$6.000
|
$6.050
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
11,199.000
|
$0.350
|
$0.500
|
$0.500
|
$0.520
|
$0.530
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
45,690.000
|
$0.300
|
$0.500
|
$0.480
|
$0.500
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
45,150.000
|
$0.300
|
$0.500
|
$0.480
|
$0.500
|
$0.500
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
40.000
|
$150.000
|
$210.000
|
$200.000
|
$200.000
|
$205.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
38.000
|
$190.000
|
$250.000
|
$240.000
|
$250.000
|
$250.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
214.000
|
$28.000
|
$40.000
|
$38.000
|
$40.000
|
$40.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
28.000
|
$4.000
|
$4.000
|
$3.700
|
$4.000
|
$3.850
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,401.000
|
$4.000
|
$4.000
|
$3.700
|
$4.000
|
$3.850
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
114,165.000
|
$0.400
|
$0.180
|
$0.500
|
$1.000
|
$0.950
|
|
|
CAM (ASPHALT) PG(70-22)
|
TON
|
504.000
|
$150.000
|
$150.000
|
$135.000
|
$150.000
|
$145.000
|
|
|
CAM (AGGREGATE)
|
TON
|
6,205.000
|
$150.000
|
$150.000
|
$135.000
|
$150.000
|
$145.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$15,000.000
|
$6,000.000
|
$8,000.000
|
$15,000.000
|
$16,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
256.000
|
$162.000
|
$70.000
|
$220.000
|
$300.000
|
$125.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
273.000
|
$180.000
|
$22.000
|
$10.000
|
$300.000
|
$22.000
|
|
Totals: |
$13,306,823.500
|
$12,138,162.770
|
$12,236,092.010
|
$12,645,422.300
|
$12,704,804.180
|