Show Job Controls
Bid Cobra

HENDERSON BS 19J (0108-04-040)

Items: 64

County: HENDERSON
Length: 0.0000 MILES
Highway: BS 19J
District: TYLER
Control Number: 0108-04-040
DBE Goal: 0.0%
Project: STP 2023(777)TAPS
Guaranty: $41,000.00
Time: 149 WORKING DAYS
Engineer's Estimate: $2,039,102.00
Date: 06/05/2025 (1 year ago)
Contract Number: 6253217
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Project ID: A00185001
Contract Type: Federal
Project Description: CONSTRUCT 6' WIDE SIDEWALKS BOTH SIDES SH-19 (COLLEGE ST. TO ST. THOMAS ) AND ON ONE SIDE AROUND ATHENS ISD CAMPUS. INCLUDES ADA CURB RAMPS, SIGNAGE, NEW PED CROSSING (BEN BELT DR), UPGRADE PED SIGNAL (ROBBINS RD), RESTRIPE PED CROSSING (COLLEGE ST).
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
DANNY HENDERSON
EDUARDO CASTANEDA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (12)
E
Engineer's Estimate
$2,039,102.00
$1,484,624.46
Over/Under Est: -27.19% -$554,477.54
$1,759,799.63
Over/Under Est: -13.7% -$279,302.37
Amt Left: 18.54% $275,175.17
$1,842,869.32
Over/Under Est: -9.62% -$196,232.68
Amt Left: 24.13% $358,244.86
Delta: -4.72% -$83,069.69
Over/Under Est: -8.68% -$176,982.50
Amt Left: 25.43% $377,495.04
Delta: -1.04% -$19,250.18
$1,866,173.40
Over/Under Est: -8.48% -$172,928.60
Amt Left: 25.7% $381,548.94
Delta: -0.22% -$4,053.90
Over/Under Est: -6.94% -$141,551.10
Amt Left: 27.81% $412,926.44
Delta: -1.68% -$31,377.50
Over/Under Est: 6.34% $129,340.30
Amt Left: 46.06% $683,817.84
Delta: -14.28% -$270,891.40
Over/Under Est: 9.2% $187,645.36
Amt Left: 49.99% $742,122.90
Delta: -2.69% -$58,305.06
Over/Under Est: 33.69% $687,004.50
Amt Left: 83.62% $1,241,482.04
Delta: -22.43% -$499,359.14
Over/Under Est: 41.32% $842,636.50
Amt Left: 94.11% $1,397,114.04
Delta: -5.71% -$155,632.00
Over/Under Est: 45.2% $921,718.00
Amt Left: 99.43% $1,476,195.54
Delta: -2.74% -$79,081.50
Over/Under Est: 90.58% $1,847,000.90
Amt Left: 161.76% $2,401,478.44
Delta: -31.25% -$925,282.90
Subcontractor Percentage Amount
STRIPING TECHNOLOGY, L.P. 3.99% $59,236.52
PANOLA SIGN & BARRICADE, INC. 0.74% $10,986.22
Total: 4.73% $70,222.74

Bid Items & Bid Tabulations

64 Total 0 of 64
HENDERSON  |  BS 19J  |  TYLER  |  0108-04-040  |  06/05/2025  |  $2,039,102.00  |  STP 2023(777)TAPS  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  149 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SCOUT 5 CONSTRUCTION LLC
3LW CIVIL LLC
TI-ZACK CONCRETE, LLC
HIGHWAY 19 CONSTRUCTION LLC
STX CIVIL
CROSS PLUS CONSTRUCTION, LLC
GARRET SHIELDS INFRASTRUCTURE
GHB EQUIPMENT COMPANY, L.L.C.
XIT PAVING AND CONSTRUCTION INC.
TIGHT LINE CONSTRUCTION, LLC
GREY SKY CONSTRUCTION LLC
O. TREVINO CONSTRUCTION, LLC
TREE PROTECTION (INSTALL)
EA 5.000 $100.000 $500.000 $0.010 $1.100 $1,000.000 $225.000 $500.000 $200.000 $1,000.000 $244.000 $350.000 $500.000 $641.000
TREE PROTECTION (REMOVE)
EA 5.000 $100.000 $100.000 $0.010 $1.100 $100.000 $80.000 $100.000 $100.000 $300.000 $60.000 $100.000 $250.000 $255.000
REMOV CONC (RIPRAP)
SY 571.000 $35.000 $150.000 $25.000 $31.620 $25.000 $16.000 $25.000 $50.000 $60.000 $30.000 $40.000 $50.000 $75.000
REMOV CONC (DRIVEWAYS)
SY 3,186.000 $20.000 $60.000 $25.000 $18.890 $25.000 $18.500 $20.000 $40.000 $40.000 $40.000 $45.000 $25.000 $48.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 80.000 $30.000 $100.000 $25.000 $22.570 $25.000 $17.000 $20.000 $40.000 $25.000 $40.000 $35.000 $100.000 $66.000
REMOV CONC (CURB OR CURB & GUTTER)
LF 3,202.000 $20.000 $78.000 $17.000 $9.400 $10.000 $9.000 $10.000 $10.000 $18.000 $28.000 $50.000 $20.000 $17.000
RMV (0"-6") TRT/UNTRT BASE & ASPH PAV
SY 1,418.000 $15.000 $20.000 $0.010 $16.980 $15.000 $25.000 $21.000 $40.000 $18.000 $31.000 $50.000 $20.000 $25.000
FURN & PLACE TOPSOIL (4")
SY 2,534.000 $5.000 $5.700 $4.250 $4.750 $2.000 $21.000 $8.000 $5.000 $12.000 $11.000 $20.000 $10.000 $22.000
BLOCK SODDING
SY 2,534.000 $7.000 $23.600 $6.640 $6.000 $5.000 $9.500 $8.000 $10.000 $13.000 $9.000 $12.000 $10.000 $10.500
VEGETATIVE WATERING
TGL 27.900 $50.000 $20.000 $0.010 $1.100 $100.000 $56.000 $1.000 $100.000 $80.000 $65.000 $100.000 $50.000 $90.000
RDSIDE AMENITY (WHEEL STOP)
EA 24.000 $200.000 $250.000 $250.000 $330.000 $100.000 $168.000 $125.000 $300.000 $400.000 $184.000 $500.000 $250.000 $322.000
CL C CONC (MISC)
CY 11.000 $1,000.000 $358.000 $625.000 $827.560 $1,000.000 $902.000 $750.000 $500.000 $600.000 $3,436.000 $1,000.000 $2,500.000 $2,345.000
RIPRAP (CONC)(6 IN)
CY 27.300 $1,250.000 $338.000 $673.240 $827.560 $750.000 $725.000 $900.000 $500.000 $700.000 $900.000 $1,200.000 $650.000 $1,238.000
GRATE & FRAME
EA 45.000 $2,500.000 $1,000.000 $2,750.000 $1,100.000 $3,462.000 $1,550.000 $2,250.000 $2,000.000 $3,000.000 $2,105.000 $2,000.000 $10,000.000 $3,080.000
ADJUSTING MANHOLES
EA 8.000 $2,000.000 $1,600.000 $1,450.000 $752.400 $1,000.000 $1,400.000 $500.000 $2,000.000 $1,000.000 $668.000 $3,500.000 $2,500.000 $4,778.000
ADJUSTING MANHOLES (UTILITY BOX)
EA 23.000 $1,000.000 $1,300.000 $750.000 $1,046.820 $350.000 $730.000 $500.000 $1,000.000 $1,200.000 $817.000 $4,500.000 $1,000.000 $4,923.000
REMOVE STR (BOLLARD)
EA 2.000 $500.000 $500.000 $250.000 $300.960 $10.000 $400.000 $200.000 $100.000 $400.000 $256.000 $2,500.000 $500.000 $272.000
MOBILIZATION
LS 1.000 $181,150.000 $130,000.000 $100,000.000 $175,973.040 $200,000.000 $150,000.000 $200,000.000 $200,000.000 $190,000.000 $100,000.000 $300,000.000 $250,000.000 $381,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $5,000.000 $0.010 $9,863.950 $2,750.000 $1,100.000 $2,250.000 $5,000.000 $5,000.000 $8,300.000 $6,500.000 $2,500.000 $15,000.000 $24,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 298.000 $155.000 $0.010 $0.010 $1.100 $100.000 $1.000 $25.000 $100.000 $250.000 $10.000 $125.000 $150.000 $200.000
TMA (STATIONARY)
DAY 149.000 $200.000 $0.010 $0.010 $1.100 $500.000 $1.000 $100.000 $300.000 $400.000 $10.000 $250.000 $250.000 $200.000
TMA (MOBILE OPERATION)
DAY 2.000 $250.000 $0.010 $0.010 $1.100 $1,000.000 $1.000 $200.000 $300.000 $500.000 $500.000 $450.000 $250.000 $200.000
SANDBAGS FOR EROSION CONTROL
EA 42.000 $9.000 $5.000 $0.010 $1.100 $5.000 $1.000 $8.000 $10.000 $50.000 $28.000 $10.000 $10.000 $30.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 2,000.000 $7.000 $5.000 $0.010 $0.110 $5.000 $0.100 $12.000 $6.000 $10.000 $7.000 $10.000 $18.000 $15.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,000.000 $2.000 $2.000 $0.010 $0.110 $1.000 $0.100 $2.000 $1.000 $5.000 $2.000 $2.000 $9.000 $5.000
LANDSCAPE PAVERS
SY 418.000 $130.000 $80.000 $139.620 $100.000 $180.000 $35.000 $156.000 $100.000 $125.000 $130.000 $275.000 $150.000 $162.000
CONC CURB (TY II)
LF 996.000 $40.000 $4.900 $42.000 $48.510 $35.000 $45.500 $25.000 $40.000 $30.000 $71.000 $75.000 $65.000 $72.000
CONC CURB & GUTTER (TY I)
LF 127.000 $40.000 $21.380 $47.470 $48.510 $55.000 $50.000 $25.000 $40.000 $60.000 $53.000 $75.000 $85.000 $115.000
CONC CURB & GUTTER (TY II)
LF 2,464.000 $45.000 $18.180 $47.470 $48.510 $45.000 $60.000 $25.000 $40.000 $60.000 $53.000 $85.000 $95.000 $70.000
CONC CURB & GUTTER (ARMOR CURB)
LF 70.000 $450.000 $8.400 $273.100 $229.920 $200.000 $336.000 $250.000 $60.000 $250.000 $387.000 $110.000 $250.000 $422.000
DRIVEWAYS (CONC)
SY 4,086.000 $100.000 $42.210 $102.340 $118.350 $110.000 $115.000 $125.000 $100.000 $125.000 $100.000 $100.000 $100.000 $145.000
DRIVEWAYS (ACP)
SY 572.000 $110.000 $100.000 $103.000 $80.000 $75.000 $85.000 $105.000 $100.000 $125.000 $103.000 $150.000 $60.000 $578.000
CONC SIDEWALKS (4")
SY 3,365.000 $100.000 $34.700 $82.000 $102.610 $58.000 $90.000 $100.000 $100.000 $60.000 $88.000 $110.000 $65.000 $171.000
CURB RAMPS (TY 1)
SY 81.000 $165.000 $55.560 $134.970 $135.140 $110.000 $191.000 $100.000 $500.000 $180.000 $1,500.000 $475.000 $650.000 $783.000
CURB RAMPS (TY 2)
SY 27.000 $165.000 $57.920 $134.970 $135.140 $130.000 $213.000 $188.000 $500.000 $180.000 $3,200.000 $500.000 $650.000 $629.000
CURB RAMPS (TY 3)
SY 227.000 $165.000 $55.160 $138.970 $135.140 $150.000 $191.000 $100.000 $500.000 $150.000 $1,500.000 $500.000 $650.000 $445.000
CURB RAMPS (TY 6)
SY 71.000 $165.000 $55.200 $134.970 $135.140 $150.000 $191.000 $165.000 $500.000 $180.000 $1,500.000 $550.000 $650.000 $681.000
CURB RAMPS (TY 7)
SY 38.000 $165.000 $56.460 $134.970 $135.140 $110.000 $213.000 $165.000 $500.000 $180.000 $1,500.000 $500.000 $650.000 $637.000
CURB RAMPS (TY 10)
SY 35.000 $165.000 $55.860 $134.970 $135.140 $110.000 $213.000 $156.000 $500.000 $180.000 $1,750.000 $475.000 $650.000 $679.000
CONC SIDEWALKS (SPECIAL)
SY 451.000 $225.000 $43.440 $178.430 $260.380 $180.000 $213.000 $125.000 $150.000 $140.000 $250.000 $150.000 $200.000 $419.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 4.000 $600.000 $250.000 $402.000 $450.000 $450.000 $375.000 $400.000 $500.000 $500.000 $316.000 $350.000 $1,150.000 $520.000
CONDT (PVC) (SCH 80) (3")
LF 31.000 $30.000 $70.000 $17.920 $38.500 $35.000 $40.000 $40.000 $66.000 $15.000 $39.000 $45.000 $100.000 $46.000
ELEC CONDR (NO.6) BARE
LF 61.000 $3.000 $10.000 $8.160 $5.500 $5.000 $6.000 $4.000 $6.000 $5.000 $6.000 $10.000 $3.000 $7.000
GROUND BOX TY D (162922)
EA 3.000 $1,500.000 $3,450.000 $933.830 $1,897.500 $1,725.000 $1,950.000 $990.000 $2,500.000 $1,500.000 $1,932.000 $2,500.000 $1,500.000 $2,255.000
REMOVE GROUND BOX
EA 1.000 $250.000 $1,000.000 $250.000 $550.000 $500.000 $560.000 $210.000 $670.000 $400.000 $560.000 $1,000.000 $100.000 $655.000
ALUMINUM SIGNS (TY A)
SF 22.000 $80.000 $25.900 $35.000 $33.000 $30.000 $75.000 $35.000 $15.000 $100.000 $34.000 $45.000 $30.000 $46.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 15.000 $800.000 $60.000 $810.000 $495.000 $1,000.000 $835.000 $500.000 $400.000 $895.000 $834.000 $950.000 $1,500.000 $860.000
REMOVE SM RD SN SUP&AM
EA 24.000 $150.000 $50.000 $126.000 $55.000 $100.000 $152.000 $50.000 $100.000 $165.000 $151.000 $250.000 $500.000 $32.000
RE PM TY II (W) 6" (SLD)
LF 345.000 $1.000 $10.000 $5.500 $5.500 $5.000 $6.500 $5.000 $4.000 $5.250 $6.000 $7.000 $6.000 $6.000
RE PM TY II (W) 24" (SLD)
LF 1,573.000 $10.000 $10.000 $5.500 $5.500 $5.000 $6.500 $5.000 $8.250 $10.000 $6.000 $7.000 $20.000 $6.000
PAVEMENT SLER 6"
LF 163.000 $1.000 $10.000 $1.100 $5.500 $5.000 $6.500 $5.000 $2.350 $4.000 $6.000 $7.000 $6.000 $6.000
PAVEMENT SLER 24"
LF 30.000 $5.000 $10.000 $2.200 $5.500 $5.000 $6.500 $5.000 $4.700 $6.000 $6.000 $7.000 $20.000 $6.000
PAVEMENT SLER (ARROW)
EA 6.000 $60.000 $400.000 $165.000 $220.000 $200.000 $250.000 $200.000 $150.000 $200.000 $224.000 $275.000 $250.000 $241.000
PREFAB PM TY C (W)(ARROW)
EA 6.000 $200.000 $400.000 $330.000 $220.000 $200.000 $350.000 $200.000 $400.000 $500.000 $224.000 $275.000 $250.000 $241.000
ELIM EXT PM & MRKS (4")
LF 255.000 $1.000 $4.000 $0.830 $2.200 $2.000 $4.500 $2.000 $2.000 $4.000 $2.000 $2.500 $2.000 $2.500
ELIM EXT PM & MRKS (12")
LF 95.000 $2.000 $10.000 $3.300 $5.500 $5.000 $6.500 $5.000 $3.000 $6.000 $6.000 $7.000 $8.000 $6.000
ELIM EXT PM & MRKS (24")
LF 588.000 $5.000 $10.000 $4.400 $5.500 $5.000 $7.500 $5.000 $10.000 $9.000 $6.000 $7.000 $20.000 $6.000
VEH SIG SEC (12")(LED)(YEL)(SOLAR)
EA 4.000 $300.000 $700.000 $300.000 $385.000 $350.000 $395.000 $400.000 $600.000 $800.000 $392.000 $500.000 $10,000.000 $40.000
TRF SIG CBL (TY A)(14 AWG)(2 CONDR)
LF 113.000 $5.000 $7.000 $4.210 $3.850 $3.500 $4.000 $4.000 $8.000 $15.000 $4.000 $5.000 $3.000 $5.000
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 2.000 $10,000.000 $12,000.000 $6,600.000 $9,500.000 $9,500.000 $12,900.000 $9,500.000 $12,000.000 $8,000.000 $10,641.000 $13,000.000 $10,000.000 $12,510.000
PED POLE ASSEMBLY
EA 1.000 $3,500.000 $11,500.000 $1,163.500 $6,325.000 $5,750.000 $5,950.000 $6,000.000 $6,500.000 $3,000.000 $6,441.000 $7,000.000 $6,500.000 $7,570.000
PED DETECT PUSH BUTTON (STANDARD)
EA 4.000 $1,100.000 $1,918.000 $2,497.630 $1,054.900 $959.000 $980.000 $1,000.000 $1,800.000 $1,400.000 $1,074.000 $1,250.000 $1,850.000 $1,265.000
REMOVAL OF PEDESTRIAN PUSH BUTTONS
EA 2.000 $75.000 $470.000 $250.000 $258.500 $235.000 $392.000 $1,000.000 $120.000 $150.000 $263.000 $325.000 $500.000 $310.000
RETROFIT DET WARN SURF (SURF APPLIED)
SF 45.000 $100.000 $300.000 $50.000 $33.750 $50.000 $235.000 $55.000 $40.000 $20.000 $40.000 $100.000 $50.000 $195.000
Totals: $2,039,102.000 $1,484,624.460 $1,759,799.631 $1,842,869.318 $1,862,119.500 $1,866,173.400 $1,897,550.900 $2,168,442.300 $2,226,747.250 $2,726,106.500 $2,881,738.500 $2,960,820.000 $3,886,102.900
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $2,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $2,000.00
Total: $4,000.00