Show Job Controls
Bid Cobra

HEMPHILL US 83 (0030-07-022)

Items: 68

County: HEMPHILL
Length: N/A
Highway: US 83
District: AMARILLO
Control Number: 0030-07-022
DBE Goal: N/A
Project: F 2023(180)
Guaranty: N/A
Time: 71 WORKING DAYS
Engineer's Estimate: $5,574,894.10
Date: 11/02/2022 (3 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
ZACHARY MAYER
KENNETH PETR
THOMAS NAGEL
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$5,574,894.10
$5,382,629.98
Over/Under Est: -3.45% -$192,264.12
$5,594,277.65
Over/Under Est: 0.35% $19,383.55
Amt Left: 3.93% $211,647.67
$5,911,579.91
Over/Under Est: 6.04% $336,685.81
Amt Left: 9.83% $528,949.93
Delta: -5.67% -$317,302.26
$6,224,842.73
Over/Under Est: 11.66% $649,948.63
Amt Left: 15.65% $842,212.75
Delta: -5.30% -$313,262.82
Subcontractor Percentage Amount
DIIBS SPECIALISTS, LLC 6.63% $353,637.91
W. S. CONSTRUCTION COMPANY 3.08% $164,284.28
BARRICADES UNLIMITED 1.67% $89,076.22
TRP CONSTRUCTION GROUP, LLC 1.30% $69,340.77
DK CONTRACTING, LLC 0.92% $49,071.93
DUSTROL, INC. 0.69% $36,803.95
SURFACE PREPARATION TECHNOLOGIES, LLC 0.35% $18,668.67
MOBILE ENTERPRISES, INC. 0.27% $14,401.54
H & F TRUCKING 0.19% $10,134.42
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.18% $9,601.03
A-CORE CONCRETE CUTTING OF TEXAS, INC. 0.09% $4,800.51
Total: 15.37% $819,821.23

Bid Items & Bid Tabulations

68 Total 0 of 68
HEMPHILL  |  US 83  |  AMARILLO  |  0030-07-022  |  11/02/2022  |  $5,574,894.10  |  F 2023(180)  |  SURF/ROADWAY RESTOR  |  71 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DUININCK, INC.
J. LEE MILLIGAN, INC.
GILVIN-TERRILL, LTD.
RK HALL, LLC
PREPARING ROW (TREE) (0" TO 6" DIA)
EA 8.000 $500.000 $315.000 $200.000 $550.000 $1,450.000
PREPARING ROW (TREE) (6" TO 24" DIA)
EA 3.000 $650.000 $1,100.000 $875.000 $900.000 $2,000.000
REMOVING CONC (CURB)
LF 40.000 $15.000 $31.500 $18.000 $40.000 $34.500
REMOVING CONCRETE(MOW STRIP)
LF 1,689.000 $10.000 $14.500 $8.250 $20.000 $22.200
BACKFILL (TY A)
STA 314.550 $200.000 $260.000 $235.000 $550.000 $290.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 8.360 $800.000 $680.000 $680.000 $645.000 $741.750
DRILL SEEDING (TEMP)(WARM OR COOL)
AC 8.360 $630.000 $535.000 $540.000 $510.000 $586.500
EMULS ASPH (EROSN CONT)(MULTI)
GAL 4,046.000 $6.000 $4.950 $5.300 $8.000 $4.610
FLEXIBLE PAVEMENT STRUCTURE REPAIR(11")
SY 105.000 $300.000 $420.000 $556.250 $500.000 $1,200.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
SY 9,050.000 $25.000 $29.000 $33.250 $40.000 $24.450
PLANE ASPH CONC PAV(0" TO 2")
SY 12,013.000 $3.000 $5.700 $4.500 $5.750 $5.280
PLANE ASPH CONC PAV (2")
SY 2,424.000 $5.000 $6.800 $6.000 $4.150 $5.800
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 55.000 $350.000 $420.000 $165.000 $500.000 $460.000
RIPRAP (CONC)(4 IN)
CY 43.000 $800.000 $895.000 $725.000 $700.000 $977.500
RIPRAP (MOW STRIP)(4 IN)
CY 89.000 $800.000 $920.000 $740.000 $700.000 $1,006.250
SET (TY I)(S= 6 FT)(HW= 2 FT)(4:1) (C)
EA 2.000 $10,000.000 $16,000.000 $8,500.000 $8,000.000 $17,250.000
REMOV STR (HEADWALL)
EA 1.000 $2,000.000 $1,600.000 $1,750.000 $3,000.000 $1,725.000
MOBILIZATION
LS 1.000 $455,000.000 $525,000.000 $555,000.000 $590,000.000 $311,242.130
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $23,000.000 $27,000.000 $45,000.000 $50,000.000 $35,768.010
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 25.000 $6.000 $21.000 $10.000 $15.000 $23.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 25.000 $2.000 $10.500 $4.000 $5.000 $11.500
CONC CURB (TY II)
LF 40.000 $30.000 $1.450 $82.500 $150.000 $63.250
RUMBLE STRIPS (SHOULDER)
LF 67,887.000 $0.200 $0.090 $0.300 $0.250 $0.160
RUMBLE STRIPS (CENTERLINE)
LF 34,269.000 $0.300 $0.130 $0.350 $0.400 $0.160
MTL W-BEAM GD FEN (STEEL POST)
LF 6,250.000 $40.000 $34.500 $37.000 $32.000 $36.800
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 10.000 $3,000.000 $2,900.000 $2,850.000 $2,525.000 $2,903.750
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 6.000 $850.000 $1,000.000 $580.000 $1,300.000 $1,495.000
REMOVE METAL BEAM GUARD FENCE
LF 5,588.000 $3.000 $2.650 $3.150 $2.500 $2.880
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 1.000 $300.000 $265.000 $315.000 $250.000 $287.500
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 10.000 $300.000 $265.000 $315.000 $250.000 $287.500
GUARDRAIL END TREATMENT (INSTALL)
EA 30.000 $4,000.000 $3,100.000 $3,640.000 $3,150.000 $3,622.500
GUARDRAIL END TREATMENT (REMOVE)
EA 30.000 $450.000 $265.000 $315.000 $250.000 $287.500
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 17.000 $800.000 $810.000 $975.000 $771.000 $886.650
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 1.000 $900.000 $920.000 $1,055.000 $875.000 $1,006.250
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 12.000 $1,000.000 $950.000 $1,110.000 $903.000 $1,038.450
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $1,200.000 $1,200.000 $1,320.000 $1,095.000 $1,259.250
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 3.000 $1,200.000 $1,300.000 $1,410.000 $1,213.000 $1,394.950
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $1,200.000 $1,300.000 $1,455.000 $1,234.000 $1,419.100
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 4.000 $1,200.000 $1,400.000 $1,580.000 $1,375.000 $1,581.250
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
EA 1.000 $1,200.000 $1,600.000 $1,820.000 $1,538.000 $1,768.700
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 2.000 $1,200.000 $1,500.000 $1,690.000 $1,454.000 $1,672.100
REMOVE SM RD SN SUP&AM
EA 44.000 $150.000 $105.000 $105.000 $110.000 $172.500
REMOVE DELIN & OBJECT MARKER ASSMS
EA 104.000 $25.000 $21.000 $11.000 $15.000 $11.500
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 45.000 $40.000 $40.000 $42.000 $47.000 $54.050
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
EA 49.000 $40.000 $40.000 $42.000 $48.000 $55.200
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BR)
EA 58.000 $40.000 $39.500 $42.000 $41.000 $47.150
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 28.000 $140.000 $125.000 $160.000 $118.000 $135.700
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 7.000 $150.000 $125.000 $160.000 $118.000 $135.700
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 4,784.000 $1.500 $1.050 $1.700 $2.000 $2.920
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,761.000 $1.500 $1.050 $1.750 $2.000 $2.920
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 1,467.000 $2.000 $1.050 $1.050 $1.000 $1.150
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 146.000 $15.000 $10.500 $10.550 $10.000 $11.500
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 6.000 $300.000 $185.000 $185.000 $175.000 $201.250
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 6.000 $300.000 $235.000 $240.000 $225.000 $258.750
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
EA 18.000 $100.000 $52.500 $53.000 $50.000 $57.500
REFL PAV MRK TY I (Y)12"(SLD)(090MIL)
LF 481.000 $5.000 $5.250 $5.300 $5.000 $5.750
REFL PAV MRK TY II (W) 36" (YLD TRI)
EA 18.000 $25.000 $10.500 $10.550 $10.000 $11.500
REFL PAV MRKR TY II-A-A
EA 413.000 $8.000 $6.300 $6.350 $6.000 $6.900
SP MIXES SP-D SAC-A PG70-28
TON 21,618.000 $160.000 $151.250 $151.750 $150.000 $181.130
TACK COAT
GAL 820.000 $10.000 $5.250 $17.500 $8.000 $8.000
UNDERSEAL COURSE
GAL 47,109.000 $6.000 $3.850 $4.350 $6.500 $8.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $14,000.000 $9,200.000 $11,000.000 $18,000.000 $10,000.000
HPPM W/RET REQ TY I(W)4"(BRK)(090MIL)
LF 1,630.000 $0.600 $0.790 $0.800 $0.750 $0.860
HPPM W/RET REQ TY I(W)4"(SLD)(090MIL)
LF 79,919.000 $0.500 $0.470 $0.500 $0.450 $0.520
HPPM W/RET REQ TY I(Y)4"(BRK)(090MIL)
LF 6,047.000 $0.600 $0.630 $0.650 $0.600 $0.690
HPPM W/RET REQ TY I(Y)4"(SLD)(090MIL)
LF 39,364.000 $0.500 $0.460 $0.450 $0.440 $0.510
TMA (STATIONARY)
DAY 75.000 $300.000 $210.000 $500.000 $740.000 $430.000
TMA (MOBILE OPERATION)
HR 100.000 $85.000 $94.500 $85.000 $190.000 $120.000
Totals: $5,574,894.100 $5,382,629.980 $5,594,277.650 $5,911,579.910 $6,224,842.730