HAYS FM2001 (6468-40-001)

Items: 51

County: HAYS
Length: 0.0100 MILES
Highway: FM2001
District: AUSTIN
Control Number: 6468-40-001
DBE Goal: N/A
Project: RMC - A00210124
Guaranty: $25,000.00
Time: 730 CALENDAR DAYS
Engineer's Estimate: $1,248,865.00
Date: 04/04/2025 (1 year ago)
Contract Number: 3254002
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00210124
Project Description: REPAIR, REPLACE, AND UPGRADE MBGF
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$1,248,865.00
$535,511.50
Over/Under Est: -57.12% -$713,353.50
Over/Under Est: -47.75% -$596,375.00
Amt Left: 21.84% $116,978.50
Over/Under Est: -5.95% -$74,332.25
Amt Left: 119.33% $639,021.25
Delta: -80.01% -$522,042.75
Over/Under Est: 13.82% $172,589.00
Amt Left: 165.44% $885,942.50
Delta: -21.02% -$246,921.25

Bid Items & Bid Tabulations

51 Total 0 of 51
HAYS  |  FM2001  |  AUSTIN  |  6468-40-001  |  04/04/2025  |  $1,248,865.00  |  RMC - A00210124  |  METAL BEAM GUARD FENCE REPAIR  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BK FIELD OPERATIONS LLC
AUSTIN BARRICADE COMPANY, L.L.C.
T&L CLEANING SERVICES LLC
ROY JORGENSEN ASSOCIATES, INC.
REMOV CONC (RIPRAP)
SY 400.000 $50.000 $20.000 $1.000 $1.000 $50.000
RIPRAP (CONC)(5 IN)
CY 25.000 $600.000 $250.000 $150.000 $400.000 $900.000
RIPRAP (MOW STRIP)(4 IN)
CY 55.000 $600.000 $300.000 $150.000 $500.000 $675.000
RETROFIT RAIL (TY T221)
LF 5.000 $180.000 $150.000 $250.000 $50.000 $2,500.000
MOBILIZATION (CALLOUT)
EA 1,150.000 $1.000 $1.000 $0.100 $1.000 $0.010
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 5.000 $150.000 $100.000 $450.000 $300.000 $150.000
TMA (STATIONARY)
DAY 125.000 $100.000 $1.000 $1.000 $1.000 $1,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 155.000 $5.000 $3.000 $1.000 $3.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 155.000 $5.000 $1.000 $1.000 $1.000 $2.000
MTL W-BEAM GD FEN (TIM POST)
LF 2,900.000 $25.000 $0.100 $8.000 $27.000 $38.000
MTL W-BEAM GD FEN (STEEL POST)
LF 5.000 $70.000 $50.000 $80.000 $40.000 $42.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $2,050.000 $5.000 $100.000 $1,500.000 $2,200.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 45.000 $850.000 $5.000 $1.000 $1,000.000 $1,250.000
MTL BM GD FEN TRANS (31"-28")
EA 30.000 $250.000 $1.000 $1.000 $100.000 $250.000
REMOVE METAL BEAM GUARD FENCE
LF 1,665.000 $1.000 $0.100 $1.000 $0.010 $4.000
REMOVE TERMINAL ANCHOR SECTION
EA 45.000 $1,000.000 $1.000 $1.000 $1.000 $250.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 5.000 $250.000 $2,000.000 $1.000 $100.000 $250.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 5.000 $200.000 $10.000 $1.000 $1,500.000 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 15.000 $3,000.000 $1.000 $1,000.000 $2,000.000 $3,200.000
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
EA 10.000 $5.000 $1.000 $5.000 $1.000 $105.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF1
EA 45.000 $40.000 $1.000 $25.000 $1.000 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF1 (BI)
EA 40.000 $25.000 $1.000 $25.000 $1.000 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 40.000 $45.000 $1,000.000 $50.000 $1.000 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 10.000 $10.000 $1,500.000 $100.000 $1.000 $50.000
INSTL DEL ASSM (D-SY)SZ 2(WC)GND
EA 5.000 $100.000 $1.000 $5.000 $1.000 $200.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF1
EA 45.000 $10.000 $1.000 $25.000 $1.000 $30.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF1 (BR)
EA 15.000 $150.000 $1.000 $50.000 $1.000 $30.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 5.000 $120.000 $1.000 $5.000 $900.000 $105.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 4,800.000 $30.000 $1.000 $15.000 $24.000 $30.000
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 30.000 $30.000 $100.000 $55.000 $20.000 $35.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 5.000 $30.000 $100.000 $350.000 $50.000 $500.000
REPLACE SHORT RADIUS SYS (TL-3)
EA 10.000 $3,000.000 $1.000 $1.000 $20,000.000 $1.000
REPLACE TIMBER POST W/O CONC FND
EA 125.000 $40.000 $200.000 $25.000 $30.000 $105.000
REPLACE STEEL POST W/O CONC FND
EA 55.000 $40.000 $1.000 $1.000 $50.000 $80.000
REPLACE TIMBER POST W/ CONC FND
EA 125.000 $40.000 $300.000 $150.000 $30.000 $120.000
REPLACE STEEL POST W/ CONC FND
EA 55.000 $40.000 $1.000 $1.000 $75.000 $80.000
REALIGN POSTS
EA 270.000 $100.000 $200.000 $100.000 $5.000 $25.000
REM OBSOLETE GET & REPL W/ SGT
EA 115.000 $3,500.000 $1,900.000 $3,000.000 $4,500.000 $4,200.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 5.000 $1,000.000 $175.000 $100.000 $50.000 $100.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 5.000 $250.000 $500.000 $100.000 $50.000 $150.000
REPLACE BLOCKOUT
EA 445.000 $200.000 $6.000 $50.000 $5.000 $90.000
REPAIR STEEL POST WITH BASE PLATE
EA 10.000 $150.000 $1.000 $100.000 $200.000 $400.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 1,000.000 $31.000 $20.000 $45.000 $25.000 $35.000
REPLACE POSTS (TL-4)(GIBRALTAR)
EA 100.000 $180.000 $1.000 $100.000 $180.000 $150.000
REPLACE POSTS (TL-4)(NU-CABLE)
EA 100.000 $180.000 $1.000 $1.000 $1.000 $1.000
REPLACE POSTS (TL-4)(TRINITY)
EA 100.000 $180.000 $500.000 $1.000 $220.000 $305.000
REPLACE POSTS (TL-4)(BRIFEN)
EA 100.000 $180.000 $1.000 $1.000 $1.000 $1.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 15.000 $1,500.000 $1.000 $1,500.000 $1.000 $1,000.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 30.000 $3,000.000 $500.000 $500.000 $1,200.000 $3,900.000
REPLACE CABLE (TL-4)
LF 110.000 $10.000 $4.000 $10.000 $0.010 $5.000
REPAIR (STEEL POST W/ BASE PLATE)(T101)
EA 5.000 $80.000 $25.000 $100.000 $200.000 $750.000
Totals: $1,248,865.000 $535,511.500 $652,490.000 $1,174,532.750 $1,421,454.000