Show Job Controls
Bid Cobra

HAYS FM2001 (6384-62-001)

Items: 71

County: HAYS
Length: N/A
Highway: FM2001
District: AUSTIN
Control Number: 6384-62-001
DBE Goal: N/A
Project: RMC - 638462001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $3,363,499.90
Date: 09/01/2021 (4 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$3,363,499.90
Over/Under Est: -22.12% -$744,074.90
Over/Under Est: -15.67% -$527,208.90
Amt Left: 8.28% $216,866.00
Over/Under Est: -3.17% -$106,476.65
Amt Left: 24.34% $637,598.25
Delta: -14.83% -$420,732.25
$3,694,605.00
Over/Under Est: 9.84% $331,105.10
Amt Left: 41.05% $1,075,180.00
Delta: -13.44% -$437,581.75

Bid Items & Bid Tabulations

71 Total 0 of 71
HAYS  |  FM2001  |  AUSTIN  |  6384-62-001  |  09/01/2021  |  $3,363,499.90  |  RMC - 638462001  |  METAL BEAM GUARD FENCE REPAIR  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SOUTHEAST HIGHWAY GUARDRAIL & ATTENUATORS, LLC
ELITE CASTLE RESOURCES LLC
ROY JORGENSEN ASSOCIATES, INC.
DBI SERVICES, LLC
REMOVING CONC (RIPRAP)
SY 500.000 $10.500 $35.000 $5.000 $25.000 $30.000
RIPRAP (CONC)(5 IN)
CY 10.000 $430.000 $740.000 $540.000 $800.000 $800.000
RIPRAP (MOW STRIP)(4 IN)
CY 30.000 $450.000 $600.000 $460.000 $600.000 $500.000
RETROFIT RAIL (TY T221)
LF 100.000 $100.000 $105.000 $18.000 $35.000 $50.000
MOBILIZATION (CALLOUT)
EA 2,000.000 $350.000 $1.000 $0.650 $1.000 $1.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 5.000 $2.100 $15.000 $35.000 $15.000 $10.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 5.000 $0.500 $15.000 $6.000 $15.000 $10.000
MTL W-BEAM GD FEN (TIM POST)
LF 5,250.000 $21.000 $38.000 $20.000 $25.000 $30.000
MTL W-BEAM GD FEN (STEEL POST)
LF 500.000 $23.000 $25.000 $25.000 $29.000 $20.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 15.000 $1,800.000 $1,500.000 $1,575.000 $1,750.000 $1,000.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 50.000 $1,200.000 $1,600.000 $1,560.000 $1,200.000 $1,800.000
REMOVE METAL BEAM GUARD FENCE
LF 5,000.000 $2.000 $3.000 $1.000 $2.000 $2.000
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $200.000 $500.000 $500.000 $1.000 $1.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 25.000 $200.000 $200.000 $100.000 $250.000 $50.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 15.000 $250.000 $500.000 $150.000 $125.000 $100.000
GUARDRAIL END TREATMENT (INSTALL)
EA 25.000 $2,500.000 $3,000.000 $1,500.000 $2,750.000 $3,000.000
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
EA 5.000 $80.000 $100.000 $20.000 $45.000 $30.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 20.000 $23.000 $50.000 $25.000 $18.000 $30.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 5.000 $15.000 $100.000 $25.000 $14.000 $30.000
INSTL DEL ASSM (D-SY)SZ 2(WC)GND
EA 25.000 $80.000 $100.000 $20.000 $15.000 $30.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 5.000 $13.600 $100.000 $33.000 $16.750 $40.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1 (BR)
EA 5.000 $24.780 $100.000 $38.000 $15.000 $40.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 5.000 $50.000 $50.000 $20.000 $25.000 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 200.000 $35.000 $15.000 $50.000 $50.000 $25.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 20,000.000 $16.000 $17.000 $26.000 $21.000 $22.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 300.000 $17.500 $21.000 $5.000 $22.000 $50.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 150.000 $24.400 $20.000 $5.000 $32.000 $50.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 2,500.000 $30.000 $30.000 $41.000 $35.000 $60.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 800.000 $30.000 $100.000 $65.000 $38.500 $50.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 1,000.000 $60.000 $50.000 $35.000 $47.000 $80.000
REPAIR STEEL POST WITH BASE PLATE
EA 25.000 $150.000 $325.000 $185.000 $165.000 $200.000
REALIGN POSTS
EA 600.000 $17.500 $10.000 $1.000 $10.000 $15.000
REMOVE & REPLACE BLOCKOUT
EA 1,200.000 $140.000 $30.000 $86.000 $25.000 $50.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 250.000 $2,500.000 $2,600.000 $3,205.000 $4,000.000 $4,500.000
REPAIR SINGLE GUARDRAIL TERMINAL
EA 400.000 $465.000 $500.000 $9.000 $1.000 $1,000.000
REPLACE POSTS (TL-4)
EA 400.000 $150.000 $200.000 $225.000 $215.000 $150.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 1.000 $250.000 $1,500.000 $1,406.000 $215.000 $500.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 30.000 $800.000 $2,000.000 $250.000 $1,500.000 $500.000
REPLACE CABLE (TL-4)
LF 350.000 $8.000 $15.000 $9.000 $5.000 $5.000
REMOVE AND REPLACE (TRACC)
EA 2.000 $1,000.000 $6,000.000 $100.000 $12,000.000 $20,000.000
REMOVE AND REPLACE (WIDE TRACC)
EA 1.000 $2,000.000 $12,000.000 $100.000 $14,000.000 $20,000.000
REMOVE AND REPLACE (NARROW REACT 350)
EA 1.000 $2,000.000 $13,000.000 $100.000 $9,000.000 $20,000.000
REMOVE AND REPLACE (WIDE REACT 350)
EA 1.000 $2,000.000 $18,000.000 $100.000 $12,000.000 $20,000.000
RMV/REPL(VIA-SAND FILL PLASTIC BARRELS)
EA 3.000 $450.000 $800.000 $368.000 $354.000 $500.000
REPAIR (TRACC)
EA 5.000 $3,300.000 $2,000.000 $806.000 $3,200.000 $4,000.000
REPAIR (WIDE TRACC)
EA 1.000 $3,000.000 $1,000.000 $1,950.000 $4,860.000 $5,000.000
REPAIR (NARROW REACT 350)
LF 20.000 $250.000 $1,000.000 $110.000 $250.000 $300.000
REMOVE AND REPLACE (NARROW QUAD)
EA 2.000 $26,000.000 $15,000.000 $27,050.000 $21,500.000 $36,000.000
REPAIR (NARROW QUAD)
EA 50.000 $100.000 $1,000.000 $350.000 $950.000 $2,000.000
REMOVE AND REPLACE (WIDE QUAD)
EA 2.000 $5,000.000 $17,000.000 $100.000 $19,500.000 $30,000.000
REPAIR (WIDE QUAD)
EA 20.000 $100.000 $1,000.000 $350.000 $1,210.000 $3,000.000
REPAIR (REACT 350) (W)
EA 1.000 $2,000.000 $5,000.000 $100.000 $200.000 $6,000.000
REMOVE AND REPLACE (SMTC) (N)
EA 1.000 $28,000.000 $15,000.000 $37,150.000 $22,000.000 $10,000.000
REPAIR (SMTC) (N)
EA 1.000 $3,500.000 $1,500.000 $6,780.000 $2,250.000 $2,000.000
REMOVE AND REPLACE (SMTC) (W)
EA 1.000 $36,000.000 $20,000.000 $42,150.000 $30,000.000 $15,000.000
REPAIR (SMTC) (W)
EA 1.000 $3,500.000 $500.000 $6,780.000 $2,300.000 $5,000.000
REPAIR (VIA -SAND FILL PLASTIC BARRELS)
EA 1.000 $500.000 $500.000 $356.000 $500.000 $500.000
REPAIR (BEAT - SSCC)
EA 3.000 $2,500.000 $3,000.000 $4,750.000 $1,750.000 $5,000.000
REPAIR TAU II (N)
LF 10.000 $250.000 $500.000 $175.000 $166.250 $500.000
REPAIR TAU II (W)
LF 10.000 $250.000 $500.000 $175.000 $123.500 $500.000
REPAIR (STEEL POST W/ W-BEAM - T101)
LF 40.000 $50.000 $175.000 $25.000 $35.000 $30.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $2,500.000 $5,000.000 $1,600.000 $20,000.000 $500.000
TMA (STATIONARY)
DAY 700.000 $125.000 $100.000 $1.000 $750.000 $250.000
LANE CLOSURE (SETUP AND REMOV)(TY 1)
EA 70.000 $1,000.000 $550.000 $450.000 $500.000 $500.000
LANE CLOSURE (SETUP AND REMOV)(TY 2)
EA 6.000 $3,000.000 $550.000 $850.000 $1,000.000 $500.000
LANE CLOSURE (SETUP AND REMOV)(TY 3)
EA 10.000 $2,500.000 $550.000 $450.000 $1.000 $500.000
LANE CLOSURE (SETUP AND REMOV)(TY 5)
EA 20.000 $2,700.000 $700.000 $100.000 $1.000 $100.000
LANE CLOSURE (SETUP AND REMOV)(TY 9)
EA 25.000 $2,000.000 $550.000 $100.000 $1,000.000 $600.000
LANE CLOSURE (SETUP AND REMOV)(TY 12)
EA 30.000 $850.000 $550.000 $100.000 $1.000 $200.000
LANE CLOSURE (SETUP AND REMOV)(TY 16)
EA 700.000 $300.000 $100.000 $785.000 $250.000 $200.000
LANE CLOSURE (SETUP AND REMOV)(TY 17)
EA 10.000 $2,500.000 $200.000 $100.000 $1.000 $200.000
Totals: $3,363,499.900 $2,619,425.000 $2,836,291.000 $3,257,023.250 $3,694,605.000